Simple cleaning service contract 1
Party A:
Party B:
According to the Contract Law of the People's Republic of China and relevant laws and regulations, Party A and Party B signed this contract on the basis of equality and voluntariness through friendly negotiation, and it is determined that Party B will be responsible for Party A's daily cleaning and cleaning services.
1. Service items
1. Project: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2. quality standard: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3. construction period: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
4. cleaning service price and settlement method:
(1) total project amount: _ _ _ _ _ _ yuan only (in words: _ _ _ _ _ _ _).
(2) After both parties sign the agreement, Party A shall pay Party B the service fee in cash in advance: _ _ _ _ _ _ _ _ Yuan only (in words: _ _ _ _ _ _ _); Within _ _ _ _ _ _ _ _ weeks after the completion acceptance, Party A shall pay the balance of _ _ _ _ _ _ _ _ _ _ _ (in words: _ _ _ _ _ _ _) in cash (transfer).
(3) If Party A fails to pay the service fee according to the contract, Party B may terminate the contract; If Party A fails to pay the service payment according to the contract upon the completion of the project, Party B shall charge _ _ _ _ _ _ _% as the liquidated damages for every _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
II. Rights and obligations of both parties
1. Rights and obligations of Party A
(1) Check Party B's work and point out mistakes in time.
(2) Party B shall be provided with water and electricity, cleaning supplies warehouse and accommodation, etc. all the conveniences necessary for the service free of charge.
(3) In order to strengthen contact, Party A shall assign a special person to supervise the service site and actively cooperate with Party B in construction.
(4) After the service items are qualified, all the service payments shall be paid according to the agreed time limit.
2. Rights and obligations of Party B
(1) The project must be completed with high quality within the specified time limit.
(2) Abide by Party A's relevant rules, regulations and disciplines.
(3) Take good care of Party A's buildings and facilities, pay attention to saving water and electricity, and be responsible for compensation for the damage caused by Party B..
(4) Party A shall not be responsible for any casualty accidents caused by Party B's responsibility during the work.
(5) Party B shall not assign the contract at will unless it is approved by Party A..
III. Liability for breach of contract
(1) During the validity of the contract, neither party may terminate the contract without the consent of the other party.
(2) Either party shall compensate the other party for the economic losses caused by its breach of contract, which shall be _ _ _ _ _ _% of the total project amount.
iv. handling of disputes
in case of any dispute during the performance of this contract, both parties shall settle it through friendly negotiation; if negotiation fails, they may bring a lawsuit to the people's court in _ _ _ _ _ _ _ _ _ _ _ _ _ _.
v. effectiveness of the contract
this contract shall come into effect as of the date when both parties sign and affix their official seals. The original contract is in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
party a:
party b:
date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
According to the Contract Law of the People's Republic of China and relevant laws and regulations, on the basis of equality and voluntariness, Party A and Party B have reached the following agreement on the cleaning of air conditioning system through consultation.
article 1 general situation of air conditioning system cleaning
(1) category of cleaning service object (please tick "√" in the selection):
□ central air conditioning □ split air conditioning □ stand-alone air conditioning □ other _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
(2) cleaning service location:
________________ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
(3) Cleaning service items, components and area:
1. Cleaning service items (please tick "√" in the selection):
□ Cleaning □ Disinfection □ Bacteriostasis □ Installation of disinfection device □ Other _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
2. Air duct cleaning area (calculated according to the expanded area): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ square meters.
3. Cleaning service parts:
Fan coil units: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _; Filter: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ only;
tuyere: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ only; Unit: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _;
others: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,
4. Agreement on the change of cleaning service volume: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
(4) Cleaning scheme, cleaning equipment and supplies:
1. Cleaning scheme (please tick "√" in the selection): □ Required □ Not required.
2. cleaning equipment: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3. cleaning supplies: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
4. Disinfection products: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
(5) others: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
article 2 cleaning standards
both parties agree that the following standards shall be followed.
(1) current national standard (fill in the full name of the standard): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
(2) standards agreed by both parties: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Article 3 The cleaning service period
is from _ _ _ _ _ _ _ _ _ _ _ to _ _ _ _ _ _ _ _ _ _ _ _ _.
article 4 acceptance
(1) date of acceptance: party a shall conduct acceptance within _ _ _ _ _ _ _ days after cleaning.
(2) Acceptance method (please tick "√" in the selection):
□ Inspection and acceptance by a third-party inspection agency, with the inspection unit of _ _ _ _ _ _ _ _ _ _ _ _ _.
□ others: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
(3) after acceptance, both parties shall confirm it in writing.
(4) The inspection and acceptance fee shall be borne by Party _ _ _ _ _ _.
article 5 cleaning service fee and payment method
(1) the cleaning service fee under this contract is RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
(2) Payment method (please tick "√" in the selection):
□ Pay in one lump sum within _ _ _ _ _ days after the cleaning service is qualified.
□ after the signing of this contract, Party A shall pay Party B a deposit of RMB _ _ _ _ _ _, and pay off the balance within _ _ _ _ _ days after the cleaning service is qualified, and the deposit shall be used as the price or returned.
□ others: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
(3) Method of settlement (please tick "√" in the selection):
□ Cheque □ Transfer □ Cash □ Other: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
article 6 rights and obligations of both parties
(1) party a shall provide party b with necessary conditions such as water and electricity for cleaning service, and both parties may agree on other matters not covered.
(2) Party A shall provide Party B with the completion data of air conditioning system installation and the construction drawing of pipeline orientation required for the performance of this contract.
(3) if party a needs a cleaning plan, party b shall provide it to party a within _ _ _ _ _ days before the cleaning service starts.
(4) Party B shall have the relevant certification documents of air conditioning system cleaning service, and the cleaning service personnel shall hold the corresponding employment certificates.
(5) Party B shall use cleaning and disinfection products with qualified quality, and show Party A the qualified inspection report of the products.
(6) Party B shall operate in a civilized and safe manner, without damaging the articles in the cleaning service place of Party A..
(7) Party B shall timely recover and centrally treat the sewage, wastes, disposable consumables and packaging materials of toxic and harmful substances generated during and after the cleaning service, so as not to cause secondary pollution.
article 7 liability for breach of contract
(1) if party a fails to pay the cleaning service fee in time, it shall pay _ _ _ _% of the unpaid amount to party b as liquidated damages for each day overdue.
(2) If the cleaning service is not completed on schedule due to Party B's reasons, Party A shall pay a penalty of _ _ _ _% of the cleaning service fee for each overdue day, and Party A has the right to require Party B to continue cleaning until it is completed; Party A has the right to demand compensation from Party B for losses caused by the delay of cleaning service; If Party A fails to achieve the purpose of the contract due to the delay of cleaning service, Party A has the right to terminate the contract.
(3) If the cleaning service cannot be completed on schedule due to Party A's reasons, Party A shall compensate Party B for the corresponding losses.
(4) If the cleaning quality is not in conformity with the agreement, Party A has the right to require Party B to clean again for free according to the standards agreed in the contract; If losses are caused to Party A, Party B shall make compensation.
(5) if party b's property losses are caused by party a's reasons, party a shall be liable for compensation.
(6) If Party A's property losses are caused by Party B's cleaning service, Party B shall be liable for compensation.
(7) other liabilities for breach of contract: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Article 8 Other agreements
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
article 9 dispute settlement methods
in case of disputes between the two parties, they can settle them through consultation or apply to the relevant departments for mediation; It can also be submitted to Shanghai Arbitration Commission for arbitration (if you choose to bring a lawsuit to the court instead of arbitration, please cross out this arbitration clause when signing the contract).
article 11 this contract is made in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
party a: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
party b: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ <
1. General situation of the project:
1. Name of the project:
2. Location of the project:
3. Contents of the project:
4. Contracting method:
5. Engineering requirements: the water quality sampling and testing of the testing company with the same qualification by the municipal health and epidemic prevention department meets the requirements for acceptance of water quality
2. Contract price and payment method.
2. payment method: when party b submits the water quality sampling certificate passed by the municipal health and epidemic prevention department or a testing company with the same qualification, it will pay the single cleaning fee by cash, check or transfer.
III. Cleaning and disinfection date arrangement
1. Project duration: According to Party A's cleaning project quota and Party A's cleaning needs, the cleaning company entrusted by Party A to Party B is set as the year, month and day. (twice a year)
2. The cleaning cycle is arranged as follows:
4. Party A's responsibilities
1. Party A shall provide Party B with water, electricity, sewage discharge places and sludge garbage dumps.
2. In order to ensure the smooth cleaning of water tank (pool), Party A shall assign a special person to switch on and off all kinds of equipment and facilities to supervise the cleaning work of Party B..
V. Responsibility of Party B
1. Party B shall carry out the construction according to the date agreed in the contract, and complete the set workload within the specified time while ensuring the quality.
2. party b shall bear all expenses for cleaning and disinfection of water tanks (pools) and water quality testing.
3. Party B must take good care of the water tank (pool) equipment during cleaning, and Party B shall be responsible for compensation for the damage to the equipment and facilities caused by Party B..
4. Party B's operators shall be responsible for their own safety, and Party A shall be held responsible for any accidents caused by Party B..
VI. Liability for breach of contract. After the contract is signed, both parties shall earnestly implement it. In case of breach of contract, the breaching party shall compensate the other party for the actual losses arising therefrom.
VII. If there is any dispute in this contract, it shall be settled through negotiation. If negotiation fails, a lawsuit shall be brought to the local people's court.
VIII. This contract is made in duplicate, with each party holding one copy.
IX. Supplementary terms:
Party A:
Party B:
Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _