Current location - Recipe Complete Network - Catering industry - Urgent. . . May I ask the telephone number of Foshan Sanshui Hengyi Power Plant Project? Thank you! !
Urgent. . . May I ask the telephone number of Foshan Sanshui Hengyi Power Plant Project? Thank you! !
Foshan Sanshui Hengyi Power Plant "Big Pressure and Small Pressure" 2×600MW Supercritical Coal-fired Generating Unit Project Procurement-Construction General Contracting Announcement Publisher: admin Release Date: April 4, 2009 Read: 186 times Foshan Sanshui Hengyi Power Plant "Big Pressure and Small Pressure" 2×600MW Supercritical Coal-fired Generating Unit Project Procurement-Construction General Contracting Announcement.

2009-03-3 1

Location: Guangdong

Details: Contact: Mary Xiang Li

Tel:1580146921/kloc-0-6384916.

Announcement of bidding for procurement and construction of 2×600MW supercritical coal-fired generator set project in Sanshui Hengyi Power Plant, Foshan City

2009-03-3 1

Location: Guangdong

Details: Contact: Mary Xiang Li

Tel:1580146921/kloc-0-6384916.

Fax: 010-6384916010-88205605.

E-mail :malizb@yahoo.com.cn or lixiang182008 @163.com.

1, Foshan Sanshui Hengyi Power Plant's 2×600MW supercritical coal-fired generating unit project was awarded the procurement-construction general contract, and the construction was approved.

The design and construction funds have been secured, and the preliminary work has been basically completed. Now it is decided to open tender for the construction of this project and select the winning bidder.

2. The general situation of this project subject to tender is as follows:

(1) Tenderee: Foshan Sanshui Hengyi Thermal Power Plant Co., Ltd.;

(2) Project Name: General Procurement-Construction Contract of 2×600MW Supercritical Coal-fired Generating Unit Project of Sanshui Hengyi Power Plant in Foshan City.

(3) Project scale: 2×600MW supercritical coal-fired generator set project;

(4) Bidding scope: The bidding scope of this project is the 2×600MW supercritical coal-fired generator set project of Foshan Sanshui Hengyi Power Plant.

Procurement-general construction contract, the scope of work includes (including but not limited to): new projects except the following projects purchased (tendered) by the Employer alone.

Pile foundation, building, official guard and fence, installation, decoration, greening, fire protection, desulfurization EPC, factory power grid.

Our company's projects related to construction projects, such as construction application, procurement, handling and storage of all equipment and materials (including outsourcing).

People purchase equipment), all debugging projects, as well as project management, design drawing expediting, host equipment expediting, construction preparation, and unit.

168-hour trial run, performance test cooperation, equipment training (at home and abroad), technical service, completion acceptance, cooperation with standard debugging and warranty period.

Ensure and complete the repair of any defects caused by the general contractor's reasons and responsibilities.

The projects separately purchased (tendered) by the Employer include engineering design (excluding desulfurization), temporary construction power supply, on-site line relocation and construction land.

Site leveling, soft foundation treatment (dynamic compaction), pile test construction and inspection, equipment supervision, construction supervision, engineering pile inspection, performance test and construction.

Quality and safety supervision, procurement of three hosts, equipment procurement of wastewater evaporation system, laboratory equipment procurement, MIS system, SIS system, access control.

Patrol system, simulator system, wharf engineering, etc. Not included in the scope of general contracting (see Annex III 1 "Work Specification" for details

Perimeter and interface ").

(5) Time limit: From the commencement date indicated in the commencement notice issued by the contractor, the # 1 unit is locked at 20 1 1, and it will be moved before June 30th.

Hand in the certificate, #2 unit will be locked for 20 1 1, and the unit handover certificate will be obtained before September 30th.

(6) Source and implementation of funds: This project is funded by Foshan Sanshui Hengyi Thermal Power Plant Co., Ltd., and the funds have been implemented;

(7) Project construction site: Shixiangang, Baini Town, Sanshui District, Foshan City, Guangdong Province.

3. The tenderer adopts the public bidding procedure. Any construction enterprise that has the ability to undertake the work of this project and has the required qualifications can

For the above-mentioned construction bidding contents, there is no quota limit for applying for bidding to the tenderer.

4. Qualification of the bidding applicant:

(1), the bidder has the qualification of independent legal person and general taxpayer, and the paid-in capital or share capital of the enterprise is not less than 500 million yuan (the parties to the consortium may

Total), and by the end of 2007, the net assets of the enterprise are not less than 2 billion yuan (based on the amount of the annual audit report of the accounting firm, joint

All parties can merge);

(2) A single bidder or the leader of the bidding consortium has the qualification of Grade I or above for general contracting of electric power engineering construction issued by the Ministry of Construction; offer a price

Other members of the consortium have the qualification of general contracting of power engineering construction issued by the Ministry of Construction and above, or professional contracting of thermal power equipment installation engineering.

First-class qualification, or first-class and above qualification for general contracting of housing construction projects, or first-class qualification for engineering design of electric power industry; Single bidder

Or all parties to the bidding consortium must pass the ISO900 1 quality management system certification, ISO 1400 1 environmental management system certification, GB/T2800 1 occupational health.

Safety management system certification or occupational safety and health management system (OSHMS) certification;

(3) A single bidder or the leader of the bidding consortium has the EPC general contracting performance of coal-fired generator sets with a capacity of 600MW and above.

(4), a single bidder or the parties to the bidding consortium are not in a state of being ordered to suspend business or bankruptcy, and the assets have not been reorganized, taken over and frozen.

(5) Requirements of the person in charge of the project: the first-class registered constructor of electric power engineering or related majors has a certificate of safety production assessment (certificate B).

He has served as EPC general contractor for coal-fired generating units of 600MW and above that have been put into production or under construction.

No more than three units with independent legal personality are allowed to form a bidding consortium, and the consortium and the bidding agreement are attached to clarify the lead party.

. Members of the consortium shall be jointly and severally liable for all matters involved in this tender and the general contracting of the project after winning the bid.

5. The bidding applicant shall carry a copy of the business license (parties to the consortium) and a copy of the qualification certificate (parties to the consortium) and keep them safe.

Copy of production license (parties to the consortium), original agreement of the consortium, and copy of relevant documents of the project leader, with official seal.

Official seal, registered from 05: 00 on March 3, 2009 to 00: 00 on April 8, 2009 (excluding Beijing time and holidays).

Participate in bidding.

6. Pre-qualification is adopted in this project, and the tenderee sets up a pre-qualification team to conduct qualification examination on the bidding applicants and pass the pre-qualification.

If the number of applicants in the preliminary examination exceeds five, but not more than nine (including nine), all applicants who have passed the pre-qualification can vote.

Bidding: If there are more than 9 applicants who have passed the prequalification, the prequalification team will decide by voting, and those who get more than half of the votes will be all.

Formal bidders (more than 9); When there are less than five applicants who have passed the prequalification, they shall be reported to the original project examination and approval department for approval.

Bid for a new organization.

7. Applicants who have passed the prequalification and are invited to participate in the bidding, please follow the time, place and time determined in the prequalification announcement.

Obtain the bidding documents and related materials, each set of bidding documents is RMB 500 yuan, which will not be returned after sale; The withdrawal deposit is 1000 yuan.

The bidding applicant can only become a formal bidder after obtaining the bidding documents and paying the above fees.

Address: Floor 7, Bisen Building, Fushi Road, Haidian District, Beijing

Contact: Mary Xiang Li

Tel:1580146921/kloc-0-6384916.

Fax: 010-6384916010-88205605.

E-mail :malizb@yahoo.com.cn or lixiang182008 @163.com.