Current location - Recipe Complete Network - Catering industry - Where is the new subway in Xi 'an? The latest news of mingdemen cultural and artistic creative town
Where is the new subway in Xi 'an? The latest news of mingdemen cultural and artistic creative town

today, I want to introduce you to the new traffic in Xi' an' an and the entertainment and leisure facilities established in Xi' an' an, so that you can visit these places in the future. The following small series will introduce the specific content for everyone.

: transportation

1. Metro Line 5 is scheduled to open to traffic in 21 years.

Start and end: Phase I: Xi 'an Andong Station-Heping Village; Phase II: Heping Village-Innovation Port of Jiaotong University

Construction: Phase I, 2116; Second year

Length: 45.11km

Station: 34 seats

Base: Epanggong Depot and Yanming Lake Parking Lot.

the first phase project of metro line 5: the first phase project is 25.4 kilometers long, with 21 stations, 1 depots and 1 parking lots, and 2 main substations.

the planned completion schedule at the end of the year: the main structure of 14 stations will be capped, and the track works and ancillary works will be started.

the second phase of metro line 5: the project starts from Heping village station in the east and ends at Huaxi innovation port science and technology in the west, with a total length of 19.9 kilometers. ***13 stations, including 5 underground stations, 8 elevated stations and 1 parking lots.

scheduled completion schedule at the end of the year: the main structure of the station will be basically completed before the end of the year.

tentative station name and location:

among them, Nanshaomen Station is the interchange station between Line 5 and Line 2, which has been officially named as Line 2; Li Jiacun, University of Architecture and Technology, is the interchange station of Line 5 and Line 4, located at the intersection of Youyi West Road and Yanta North Road, and Line 4 has been officially named. Seiryuji is the interchange station between Line 5 and Line 3, which has been officially named.

Line 6 is scheduled to open to traffic in 21 years.

Start time: 2116

Total length: 39.6km

Start and end: South Railway Station-Textile City Station

Station: 32 (all underground stations)

Metro Line 6 Phase I: The first phase of the project is 21.13km long and has 15 stations.

the first phase of metro line 6, from south passenger station to south labor road station, is 21.13km long, all of which are underground lines.

the planned completion schedule at the end of the year: the main structure of 11 stations will be capped, and the track works and ancillary works will be started.

Phase II of Metro Line 6: The total length is 19.6 kilometers, all of which are underground lines, with 17 stations and a parking lot. The control center used with Line 4 and Line 5 is located in the vehicle section of Aerospace City.

planned completion schedule at the end of the year: the station will fully enter the main structure construction.

Station and location:

Among them, Keji Road Station is the interchange station between Line 6 and Line 3, which has been officially named; It is the interchange station of Bell Tower Line 6 and Line 2, located on the east side of Bell Tower and arranged from east to west along East Street. Line 2 has been officially named; Dashicheng is the interchange station between Line 6 and Line 4, which has been officially named. Xianning Road is the interchange station between Line 6 and Line 3, which has been officially named. Textile City is the interchange station of Line 1, Line 6 and Line 9, which has been officially named as Line 1.

After the opening of Metro Line 6, it is more convenient to go to work in Gaoxin by subway!

Line 9 is scheduled to open to traffic in 21 years.

Planned opening time: year

Starting point: Textile City-Qinhan Avenue

Graduation ceremony: year

Length: 25.16 km

Station: 15 (13 underground and 2 above ground)

Base: Wang Xiang Depot, Textile City parking lot

The total length is 25.

Lintong Metro Phase I (Line 9) passes through Baqiao District and Lintong District. The starting point of the line is Textile City Station, the terminal of Metro Line 1 and Line 6, and the end point is Qinhan Avenue Station in Lintong District. The total length of the main line is 25.296km, all of which are underground lines. There are 15 stations (including 3 transfer stations) with an average distance of 1.75km.

year-end completion schedule: the whole line is basically completed.

tentative location and location list:

Line 9 (Lintong Line) starts from Textile City Station of Metro Lines 1 and 6 and ends at Qinhan Avenue in Lintong District. The total length is about 25.3 kilometers, with 15 stations and a depot. Among them, the Textile City of Line 1 has been officially named.

American Federation of TechnicalEngineers

Route: Starting from Xi 'an North Railway Station, going north through Airport New Town, Liquan and Ganxian, passing through Yongshou and Binzhou, entering Gansu, passing through Dong Zhiyuan in Ning County to Qingyang, passing through Xiaqingcheng in Dong Zhiyuan, going back to Huanjiang, passing through Quzi, Huanxian and Shancheng, climbing Yandun Mountain, passing through Tianshui Fort, and entering Ningxia.

Sites: Anbei, Xianyang North Plateau, Liquan South, Ganxian, Yongshou West, Binxian East, Ningxian, Qingyang, Qingcheng, Quzi, Huanxian, Hongde, Tianshui Fort, Hui 'anbao, Baitugang, Wuzhong, Lingwu North, Hedong Airport, Yinchuan East and Yinchuan East.

3. Broken Road

The broken road in Xi 'an is planned to be cleared

The broken road opening project: The specific projects include Jing13th Road, Jingjiu Road, Jing14th Road, No.214, Xijiaohua Road, Nanlian of Dongling Road, Mujiacun Supporting Road, Ling Wei Street, Fengcheng No.4 Road, Beisiheyao Road, Surveying and Mapping East Road, Surveying and Mapping West Road and Ji Tai.

Image progress at the end of the year: passing through No.13 Road, No.14 Road, passing through No.214 Planning Road on the west side, and Dongling Road extending south; Before the end of the year, nine roads will be opened and the supporting roads of Moujia Village will be partially completed; Other projects will start construction in due course according to the completion of preliminary work.

construction period: -

4. parking management

at present, there are 1.18 million parking spaces in the third ring road of Xi' an, and the total parking resources are seriously insufficient.

in an, Xi' an, the construction of the public parking lot is going on for three years (-year), and it is planned to build no less than 1.51 million parking spaces each year, and 481,111 new parking spaces will be arranged within three years.

that is, 481,111 parking spaces will be added by 2118!

Leisure and Entertainment

Xixian New Area

1. Project Name: Fengdong New World Wenchuang Block

Project Description: The total construction area of the project is about 1.9 million square meters, and the construction function is a free trade cultural and creative zone.

construction period: -

image progress at the end of the year: start the project construction.

2. Project Name: Xi 'an An International Art Museum and Xi 'an An International Art City Project

Project Description: The total building includes Xi 'an An International Art Museum, with a total construction area of 6,111 square meters, mainly for children's museums. Xi 'an An International Art City Project has a total construction area of 82,111 square meters, mainly for the construction of painter apartments.

Construction period: 2115 -

Image progress at the end of the year: 61% of the total project volume of Art City Museum; The first phase of the urban art project has been completed.

3. Project Name: Silk Road Happy World

Project Description: The project is divided into three theme sections: China, Asia and Europe, equipped with four categories of equipment, including multimedia, machinery and performance.

Construction period: -

Image progress at the end of the year: 1. The main body of the North Gate (Asia-Europe link) of the Silk Road Happy World Project was completed; 2. Flying cinemas and fairy tale gardens of the Silk Road Happy World Project; 3. The South Gate of Silk Road Happy World Project (Silk Road Living Room, Unpowered Parent-child Paradise) is capped.

4. project name: Xixian New Area international cultural and creative park

project description: the first phase has a total construction area of 1.22 million square meters, with two floors underground and seven buildings above ground.

Construction period: -

Image progress at the end of the year: the main project is completed.

5. project name: airport new town central park project

project description: through the park landscape, combined with commercial, leisure and entertainment, cultural and sports facilities, underground space, underground parking and other profitable sectors. The daily operation and maintenance of the park will achieve balance of payments, build an ecologically livable urban green center, enhance the airport city style and quality, and provide beautiful and convenient leisure and entertainment cultural places for the citizens.

construction period: -

image progress at the end of the year: complete the establishment of the project company and improve the construction procedures. Topographic arrangement and planting of 21,111 square meters have been completed

6. Project name: Kangling Park

Project description: The project is located in the south of Tiangong No.2 Road and north of Tianhan Avenue

Project description: With a construction area of 289,111 square meters, it will be a small town with cultural industry characteristics, covering the Mingdemen Heritage Protection Area, the cultural and artistic exhibition area, the cultural and artistic creative area and the cultural and artistic education area.

Construction period: 2116 -

Image progress at the end of the year: main construction of residential, commercial and office buildings in the cultural and artistic creative area.

2. Project name: Kenneth Behring Museum of Nature

Project Description: With a total construction area of 12,111 square meters, a natural museum will be built.

construction period: -

image progress at the end of the year: construction of the second floor underground

_ Ba Ecological Zone

1. Project name: Silk Road International Cultural and Art Center Project

Project Description: The project is located in the Foreign Affairs Cultural Zone of Xi 'an Consulate District, with a planned total construction area of 1.16 million square meters. It is an important supporting project of foreign affairs service and cultural exchange in the Consulate District of Xi 'an, and it is also a concentrated area of cultural industries and a place for cultural activities in various countries and regions. Including the construction of grand theatre, concert hall, museum, art gallery, library, international art museum, international exchange center, community business center, etc.

construction period: -

image progress at the end of the year: complete the construction and installation of underground buildings such as grand theatre, activity center and museum, and complete the civil works above ground of activity center and museum.

2. Project Name: Ancient Love in China, Song Cheng

Project Description: The construction content includes the foyer, large theater, cultural field, science and technology interactive complex, market street, logistics facilities and other functional areas.

construction period: -

image progress at the end of the year: the main structure of the theater is capped, the outdoor works of the ancient street and the main building area are completed and put into trial operation.

gaoling district

project name: gaoling district cultural and sports center project

project description: it mainly builds public stadiums, gymnasiums, cultural centers, libraries, conference centers, etc.

construction period: -

image progress at the end of the year: construction of public stadiums, gymnasiums, cultural centers and libraries.

Beilin

Project name: An 'aimei Art Square in Xi 'an

Project description: The total construction area is about 53,111 square meters, the floor area ratio is 6.52, the greening rate is 25%, and there are about 311 parking spaces. With 22 floors above ground and 4 floors underground, it is a comprehensive project integrating theater, entertainment, catering, business negotiation and hotel management.

construction period: -

image progress at the end of the year: the main construction will reach plus or minus zero.

zhouzhi county

Project Name: Zhouzhi Shuijie Eco-tourism Town

Project Description: BB Tourism Business Cluster Project featuring high-end hotels in Zhouzhi Shuijie, with a total construction area of about 811,111 square meters. * * * There are 13 sub-projects, namely: 1. Love Life High-end Theme B&B Cluster; 2. "Western Regions" International Hot Spring Health Hotel; 3. Zhuhai style and bamboo forest hotel group in Tsinghua, Shui Mu; 4. Quyuan Fengheyuan Ecological High-end Living Country Art Hotel; 5. Courtyard by Marriott Guanzhong Lake Bay; 6. Tangquan Art Hotel Block; 7. Yang Huan Time High-end Indoor Beach Hot Spring Hotel; 8. Fenghua Xue Yue Four Seasons Zero Time Difference Hotel; 9. An Lan Guta Hotel; 11. Yujiangnan Art Restaurant; 1. Go to the high-end B&B cluster in Shuishanghefang; 12. Western Intangible Cultural Heritage Tourism Investigation Park supporting project; 13.cosplay dynamic music interactive experience block supporting project

Construction period: -

Image progress at the end of the year: improve relevant supporting facilities and start some projects.

High-tech Zone

Project Name: Mutamiao Section Construction Project of Tang City Wall Ruins Park

Project Description: The main contents of the project include roads, squares, monuments and supporting buildings.

Construction period: -

Image progress at the end of the year: earthwork excavation.