Shop renovation contract Model Universal (6 articles)
Now contracts are being used everywhere, and there will be corresponding contracts for everything that concerns their own interests. The purpose of establishing a contract is to protect people's legitimate interests. The following is the "General Model of Store renovation contract (6 articles)" compiled by me for your reference only. Welcome to read this article.

Article 1: General customer (Party A) of the store renovation contract model: _ _ _ _ _ _ _ _ _ _ _.

Organizer (Party B): _ _ _ _ _ _ _ _ _ _ _

Project: _ _ _ _ _ _ _ _

Through friendly negotiation between Party A and Party B, Party A decides to entrust Party B to decorate the living room. In order to ensure the smooth progress of the project, this contract is hereby signed in accordance with relevant national laws and regulations for * * * * to abide by.

Article 1: Project Overview

1. Project address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. Room specification: room type: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3. Construction content: See Annex (1) List of Home Decoration Construction Contents and Construction Drawings for details.

4. Entrustment method: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

5. Project Commencement Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

6. Project completion date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Total days of the project: _ _ _ _ _ _

Article 2: Project Price

The project price (in words) is _ _ _ _ _ _ _ _ Yuan (in words).

1, material _ _ _ _ _ _ _ yuan;

2, labor costs _ _ _ _ _ _ _ yuan;

3. The design fee is _ _ _ _ _ _ yuan;

4, the construction freight _ _ _ _ _ _ yuan;

5. The handling fee is _ _ _ _ _ _ _ yuan;

6. The management fee is _ _ _ _ _ _ _ yuan;

7. Other expenses (specify content) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 3: Quality Requirements

1. The varieties, specifications and names of the main materials used in the project shall be approved by both parties.

2. The acceptance standard of this project shall be implemented with reference to the relevant provisions of the state.

3. During the construction, if Party A has special construction projects or special quality requirements, both parties shall confirm and sign a supplementary contract for the increased costs.

4. All materials and equipment purchased by Party A shall be borne by Party A; Party B shall be responsible for the quality of the project.

5. If Party A hires a project supervisor, it shall notify Party B before the project starts, so as to facilitate the work connection.

Article 4: Supply of Materials

1. Party B shall clearly price the materials used in this contract in strict accordance with the relevant national price regulations. The materials provided by Party A shall be used in the decoration project specified in this contract, and shall not be used for other purposes without Party A's consent ... If Party B uses them for other purposes, Party B shall compensate Party A at double the price of the misappropriated materials.

2. If the materials and equipment provided by Party B do not meet the quality requirements or have different specifications, they shall not be used. If it has been used, all losses caused to the project shall be borne by Party B. ..

3. The materials and equipment that Party A is responsible for purchasing and supplying shall be qualified products that meet the design requirements, and shall be supplied to the site on time. Delayed arrival, postponed construction period and delayed punishment. Pay Party B _ _ _% of the total amount of materials provided by Party A as the management fee ... After the materials are accepted by Party B, Party B shall be responsible for keeping them, and Party B shall be responsible for compensating the losses caused by improper keeping.

Article 5: Method of Payment

1. After the contract is signed, Party A shall pay _ _ _ _ _% of the engineering materials and _ _ _ _% of the engineering expenses; When the construction period is over half (_ _ _ _ _ _ _ _ _ _ _ _), Party A will pay _ _ _ _% of the second project payment. The remaining _ _ _ _% shall be settled by Party A after the project is completed and accepted. (Note: Construction costs include labor costs).

Party A's failure to pay on time is a breach of contract, and Party B has the right to stop the construction. If the project price is not settled after acceptance, it shall not be delivered for use.

2. If there is any increase or decrease in the project or need to be changed during the project construction, both parties shall sign a supplementary contract, and Party B shall be responsible for issuing the construction change form and notifying the person in charge of the construction site. Increase or decrease the project price and settle on the spot.

3. If Party A fails to prepay the project price within the time limit stipulated in this contract, Party A shall pay _ _ _% of the unpaid project price to Party B for each day overdue.

4. If Party A mortgages the house decoration to the bank, it shall hand over the mortgage certificate and relevant documents (copies) to Party B. ..

Article 6: Construction Period

1. If the completion is delayed due to Party B's reasons, Party B shall pay liquidated damages of _ _ _% of the working expenses to Party A every day until the working expenses are deducted. If the construction period is delayed due to Party A's reasons, Party B shall be paid _ _ _% of the labor cost of the decoration project price as the lost time fee for each day of delay.

2. If the unqualified materials and equipment selected by Party A affect the project quality and time limit for a project, Party A shall bear the cost of rework, and Party B shall bear the cost of rework for quality accidents caused by Party B's construction, and the time limit for a project remains unchanged.

3. In the process of construction, if work is stopped due to engineering quality problems and disagreement between the two parties, it will not be punished as delayed work or delayed construction period. Both parties should take the initiative to ask the relevant departments for mediation or arbitration to coordinate the handling, resolve the dispute as soon as possible and continue the construction.

4. If it is necessary to rework due to Party A's reasons, or if the construction period is delayed due to Party A's change of construction contents, it is necessary to apply for a visa, and Party A shall bear all the construction costs. If rework is caused by Party B, Party B shall bear the responsibility, and the construction period will remain unchanged.

5. During the construction process, Party A shall be responsible for the quality problems and time delay caused by notifying the construction personnel to change the construction content without Party B's consent.

Article 7: Project Acceptance

1. Project quality acceptance, except for concealed works, which need to be accepted by sections. After all projects are completed, Party B shall organize Party A to carry out the completion acceptance. Both parties shall handle the project settlement and handover procedures.

2. After Party B notifies Party A of the process acceptance and completion acceptance, Party A shall come to accept it within _ _ _ _ days. Failing to do so within the time limit, Party A shall be deemed to have voluntarily waived its rights and passed the acceptance. If there is any problem, Party A shall be responsible for it. Party A's own occupancy is deemed as qualified.

3. If Party A fails to come for acceptance within the time specified by Party B, it shall notify Party B in time and set another date.

Party A: _ _ _ _ _ _ _ _ _ _ _

Date: _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _

Date: _ _ _ _ _ _ _ _

Part II: renovation contract model of the general store owner: _ _ _ _ _ _ _ _ _ _ _.

Party B: _ _ _ _ _ _ _

Through friendly negotiation between Party A and Party B, Party A agrees to entrust Party C to decorate the fa? ade, and to ensure the smooth completion of all projects in the spirit of recognition, cooperation, coordination and economy.

I. Overview of the Project:

1, project name: facade decoration

2. Project location: _ _ _ _ _ _ _ _ _ _ _

3. Contracting principle: contract auxiliary materials.

Second, the design standards and quality:

1. The facade decoration design is provided by the seller, and Party B should make good suggestions.

2. Woodworking part: the grass-roots level is firm and solid, without pushing problems, and the vertical and horizontal deviation is greater than _ _ _ _ _ cm.

3. Paint part: no obvious air holes, nail holes and other problems, rough and comfortable feel, no brush leakage.

4. Hydropower part: Wiring and pipe laying shall be conducted according to the same site conditions, and the wiring and pipe laying shall be horizontal, flat and vertical.

5. Tiles need to have straight seams, no leakage and no damage.

6. The problem of style is not due to quality. Party B will carry out the construction according to the drawings and will not undertake rework. The cost of rework will be borne by Party A. ..

7. During the renovation of the fa? ade, Party B shall be responsible for the finished product protection of Party A's fa? ade. In case of any damage, Party B shall be responsible for compensation.

Third, the warranty period:

1. The thickness of waterproof coating is _ _ _ _ meters for the main wall and _ _ _ _ meters for other areas, and the warranty period is _ _ _ _ years.

2, the ground Shi Zhuan metope must be straight seam, no leakage, no damage, the warranty period is _ _ _ _ _. In case of such phenomenon during the warranty period, Party B shall bear all responsibilities and be responsible for replying (after the warranty period, it will be postponed for _ _ _ _ _ years after Party A's approval).

Four. Contracted projects:

1. According to the project list provided by Party A and Party B, Party A and Party B agree that the cost is RMB.

2. According to the project list, if there is any increase or decrease, it shall be coordinated by both parties, and all expenses shall be settled by increase or decrease.

Verb (abbreviation of verb) construction cycle:

The construction period is the decoration company, and the entry date is from _ _ _ _ _ _ _ _ _

Six, material brand:

The main materials and products required by Party A shall be completed by Party B according to the regulations of the Buyer. See the list of materials and brands for details.

Seven. Payment terms:

The payment method is divided into three times: the first time the two parties sign the contract, Party A pays Party B RMB for the materials, and the last payment is capped. After Party A's acceptance is qualified, Party A shall keep _ _ _ _ _ _% of the quality deposit, and the balance shall be returned.

Eight. This agreement is made in duplicate, one for each party, and shall come into force after being signed.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 3: General Employer of renovation contract Model Shop (hereinafter referred to as Party A): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Contractor (hereinafter referred to as Party B): _ _ _ _ _ _ _ _ _ _ _

In order to safeguard the rights and interests of both parties, this contract is signed in accordance with the existing laws, regulations and rules, and combined with the specific conditions of this project, and shall be implemented accordingly.

I. Background of the Contract

1, and the construction site is: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

2. Party A entrusts Party B to carry out the construction, so that the renovated store can meet the design requirements.

Second, the content of the contract

Party A entrusts Party B to decorate the store leased by Party A for opening a teahouse.

Third, the way of contracting.

The renovation project is contracted out to Party B in the form of full contract (contractor, contractor).

Four. Rights and obligations of Party A

1. Where the design intent of Party A is not met, Party B has the right to request rectification. ..

2, have the right to supervise the project quality and time limit for a project according to the design requirements.

3. In case of quality problems in Party B's decoration, Party A has the right to require Party B to rectify.

4. Have the obligation to provide water and electricity guarantee for Party B's construction.

5. Have the obligation to allocate the project funds according to the payment method agreed in the contract.

Verb (abbreviation of verb) Rights and obligations of Party B.

L, have the right to obtain the project price as agreed in the contract.

2. All projects shall be constructed in accordance with the design scheme confirmed by Party A (including layout, water and electricity diagram, construction layout, accessories construction requirements and construction flow, etc.). ).

3. The purchased materials must meet the design standards (subject to the construction list).

4. Carry out safe and civilized construction, and Party B shall be responsible for the punishment if it violates the law. All safety accidents of the construction party have nothing to do with Party A, and Party B is responsible for them.

5. During the construction period, Party B shall clean up the store (including removing construction waste) before handing it over to Party A. ..

Intransitive verb Contract amount and payment method

The renovation budget of this contract is RMB _ _ _ _ _ _, in words: _ _ _.

Payment method: RMB _ _ _ _ _ _ _ _ _

VII. Project Duration

The project duration is _ _ _ _ _ days (from the date of signing the contract).

Eight, special instructions

1. If the design scheme needs to be changed during construction, it must be negotiated by both parties.

2. In the process of construction, if there are no materials with design requirements in the market, both parties can exchange them with homogeneous materials with the same price through negotiation.

3. The construction project shall be subject to the construction list; For the items not included in the list, Party A and Party B shall negotiate to increase the quantities and project funds.

Nine. responsibility for breach of contract

Any party who breaches the contract will be fined _ _ _% of the contract amount.

X. supplementary provisions

Matters not covered in this contract shall be settled by both parties through consultation in accordance with relevant regulations;

2. This agreement shall come into force as of the date of signature;

3. This Agreement is made in quadruplicate, three for Party A and one for Party B, all of which have the same legal effect.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 4: General customer (Party A) of the store renovation contract model: _ _ _ _ _ _ _ _ _ _ _ _.

Organizer (Party B): _ _ _ _ _ _ _ _ _ _ _

After friendly negotiation, Party A decided to entrust Party B to lay floor tiles and wall tiles, and signed this agreement for both parties to abide by.

I. Project Location: _ _ _ Farmers' Market

Second, the project: facade decoration

1. Tiles and corner lines shall be laid on the facade ground, which shall be flat; Every other bathroom wall is tiled to the top, and the facade is divided into two layers, one is the facade, and the other is the residence, leaving room for the ceiling. Stair handrails must be wooden, painted and bright.

2. If there are any unfinished matters, Party A shall propose a plan and confirm it through negotiation.

Three. Total project cost: _ _ _ ten thousand yuan.

4. Contracting method: the contractor completes the decoration, and the decoration materials are purchased by Party A. ..

Verb (abbreviation of verb) quality standard: the construction quality meets the safety requirements, and the decoration quality is not lower than the decoration standard of the same construction type, which is recognized by both parties. Within _ _ _ _ months after the project is completed and accepted, Party B shall be responsible for rework and maintenance for quality problems caused by Party B's construction.

6. Construction period: from _ _ _ _ _ _ _ _

Seven. Payment method: In order to ensure the project quality, the deposit of RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ After the completion of the project, if it meets the above-mentioned construction project and design requirements, Party A shall pay Party B the labor fee within _ _ _ _ _ days.

Eight. This agreement is made in duplicate, each party holds one copy, which has the same effect. This agreement shall come into effect as of the date of signature by both parties.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 5: The renovation contract model of the store is generally Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Through negotiation between Party A and Party B, Party A signs this contract for Party B's renovation activities of this store.

Diyitiao decoration shop

Decoration place of this contract: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Article 2 Decoration period

The renovation period starts from _ _ _ _ _ _ _ _.

Article 3 Decoration deposit

Before Party B enters the site for renovation, it shall pay the renovation mortgage of RMB _ _ _ _ _ _ _ _ _.

Article 4 Decoration regulations

1. Party A has the right to review the store decoration plan proposed by Party B, and Party B can only carry out the decoration after obtaining the written consent of Party A. ..

2. Party B's decoration plan must specify the location, scope, content and other detailed information.

3. All expenses such as water, electricity and garbage removal during the renovation period shall be borne by Party B. ..

4. If Party B causes damage to the commercial house and other people's facilities and equipment during the renovation, Party B shall bear all responsibilities and all maintenance expenses.

5. All decoration and renovation works of Party B must be completed within the time limit specified by Party A, otherwise, the liquidated damages will be _ _ _ _ _ _ _ _ _ _ _.

6. If Party B needs to decorate the store (including installing fixtures in the site), it shall obtain the written consent of Party A in advance. Without written consent, Party B shall be responsible for restoring the original state and compensate for the losses caused to the Commodity House.

7. If Party B needs to transform the electric power system of the store or increase the lighting facilities, it shall report to the management office of the commercial building for review, and after a written reply, it shall carry out the construction in strict accordance with _ _ _ _ _ _. In case of unauthorized construction, Party B will be fined _ _ _ _ _ _ _ _ _.

8. Party B's decoration and renovation of the store shall not adversely affect the safety of the main structure of the building, the use safety of pipelines such as fire fighting, circuits and air conditioning, and the overall beauty, and shall not affect the operation of Party A or a third party, otherwise Party B shall immediately correct it and compensate for the losses caused to Party A and the third party.

9. The garbage and waste generated by Party B's decoration must be cleaned up in time, so as not to affect the beauty of the overall environment in the commercial building, or a fine of _ _ _ _ _ _ _ _ _ yuan will be imposed.

10. Party B shall not drill holes in the walls and floors of the store, or directly install decorations or metal pendants on the walls. In case of violation, Party B will be fined _ _ _ _ _ _.

1 1. The materials used in Party B's decoration project must meet the national requirements for fire prevention and environmental protection.

Article 5 This contract shall come into effect as of the date of signature and seal by both parties. This contract is made in duplicate, one for each party.

Party A (signature): _ _ _ _ _ _ _ _ _ _ Party B (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 6: General customer (Party A) of the store renovation contract model: _ _ _ _ _ _ _ _ _ _ _ _.

Organizer (Party B): _ _ _ _ _ _ _ _ _ _ _

After friendly negotiation, Party A decided to entrust Party B to lay floor tiles and wall tiles, and signed this agreement for both parties to abide by.

I. Project Location: Room: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Two. Form and structure: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Third, the project:

1, four rooms (two bedrooms and two living rooms) shall be paved with _ _ _ _ _ _ tiles, and the corner lines shall be laid, which shall be flat; A kitchen, a bathroom wall _ _ _ _ _ porcelain to the top, leaving ceiling space, corner polishing, Floor tiles _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. If no details are involved, Party A shall propose a plan and discuss it.

4. Contracting method: Party A must ensure the materials needed during the decoration period (Party B informs Party A in advance) and the lunch supply during the construction period according to Party B's requirements, and Party B shall be responsible for the construction.

Verb (abbreviation of verb) quality standard: the construction quality meets the safety requirements, and the decoration quality is not lower than the decoration standard of the same construction type, which is recognized by both parties. Within _ _ _ _ months after the project is completed and accepted, Party B shall be responsible for rework and maintenance for quality problems caused by Party B's construction.

Engineering cost of intransitive verbs: materials are provided by Party A, and Party A pays Party B the labor cost of decoration.

Seven. Payment method: in order to ensure the quality of the project, the deposit of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ After the completion of the project, if it meets the above-mentioned construction project and design requirements, Party A shall pay Party B the labor fee within _ _ _ _ _ days.

Eight. This agreement is made in duplicate, each party holds one copy, which has the same effect. This agreement shall come into effect as of the date of signature by both parties.

Party A: _ _ _ _ _ _ _ _ _ _ Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Party B.

Signature (seal): _ _ _ _ _ _ _ _ _ _ Signature (seal): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Tel: _ _ _ _ _ _ Tel: _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.