Current location - Recipe Complete Network - Catering industry - Power of attorney for project design
Power of attorney for project design
Within the scope of the legitimate rights and interests authorized by the client, the client shall not go back on the entrusted matters for any reason. In today's society, we need a power of attorney to handle affairs. In order to make it easier and more convenient for you to write a power of attorney, here is a power of attorney for project design that I have compiled for you. Welcome to read the collection.

Power of Attorney for Project Design 1 Company:

We hereby entrust your company to carry out engineering design for us. Before all relevant stages of the project begin, we should provide you with topographic data, engineering geological survey report, project approval (site selection and planning) and other documents related to the project design work. With regard to relevant design requirements, we formally put forward the following suggestions to you:

1. The design shall be carried out according to the following stages and schemes. After the technical documents of each stage are completed, the next stage can only be carried out after our formal confirmation:

1, master plan;

2, single building design (plan, elevation);

3. Preliminary design of single building;

4, single building construction drawing design;

5. Overall layout design.

Second, the specific design requirements of each stage are as follows:

1, master plan:

(1) functional partition:

(2) Location of entrances and exits:

(3) Floor area ratio:

(4) Greening rate:

(5) Daylighting spacing:

(6) Parking spaces:

(7) Total construction area:

(8) Maximum building height:

(9) Minimum building height:

(10) Other:

2, single building design scheme:

(1) Architectural style:

(2) Building floor:

(3) The height of each floor:

(4) Building area:

(5) Civil air defense facilities:

(6) Structure:

(7) Construction equipment:

(8) Masonry requirements:

(9) Others:

3, single building construction drawing design:

(1) interior decoration standard:

(2) Exterior wall decoration standard:

(3) Special bearing requirements:

(4) Structure:

(5) Heating mode:

(6) Weak current and intelligent projects:

(7) Water heating and electricity metering:

(8) Location of water heating and electricity entrance and exit:

(9) Design life:

(10) Other:

4. Overall layout design:

(1) Water heating and electricity supply location:

(2) Total power supply load:

(3) Total heating load:

(4) Road construction standards:

(5) Others:

Third, the time limit for a project in each stage:

1, master plan:

2, single building design (plan, elevation):

3. Preliminary design of single building:

4, single building construction drawing design:

5. Overall layout design:

Four, design and service quality level requirements:

According to your company's engineering grading standards, we require engineering design according to grades and undertake corresponding post-service

5. We are responsible for providing samples of construction equipment such as design.

Other intransitive verbs:

1. The structure, fire protection, evacuation and building energy saving involved in the engineering design shall be strictly implemented in accordance with the relevant national design specifications. If our design requirements are inconsistent with the relevant national design specifications, they shall be implemented in accordance with the national design specifications.

2. In order to meet our investment and the principle of energy conservation.

In order to make the engineering design work go smoothly, we appointed a plenipotentiary to take charge of the project, and we recognized all the documents signed by him. The following is the signature of the plenipotentiary and his position, department and work contact number in our company, please confirm.

Plenipotentiary (signature):

Responsibilities:

Department:

Office phone number:

Mobile phone:

Hereby entrust

Customer (signature):

Date of entrustment:

Power of Attorney for Project Design 2 hereby authorizes our company _ _ _ _ _ _ _ _ _ _ _ _ _ (job title: _ _ _ _ _ _ _ _ _ _) as the official legal agent of our company, with the ID number of _ _ _ _ _ _ _ _ _ _ _ _ _ (the copy of ID card is attached). I participated in the bidding activity of "landscape design of a building project" in the name of my unit. We acknowledge all documents signed by the agent in the process of bidding, bid opening, bid evaluation and contract negotiation and everything related to them.

The agent has no right to entrust others again. Hereby entrust.

Bidder (signature):

Bidding Agent (name/title in block letters):

Bidder: (full name and official seal):

Legal representative (signature):

Legal Representative (name/title in block letters):

Address:

Telephone:

Fax:

Date:

Power of Attorney for Project Design 3 I. Design Overview

1. Topography: high in the north and low in the south, with a height difference of about1.0m. ..

2. Dominant wind direction: northwest and northwest WWN.

3.gas? Temperature: annual average temperature 10.6℃, maximum temperature 39℃, minimum temperature-17.6℃.

4. Frozen soil depth: 70cm.

5. Maximum wind speed over the years: 2.4m/s

6. Average sunshine over the years: 2,800 hours.

Second, the supply of water, heat and electricity.

1, the water source is connected from the tap water pipeline of Mine No.1 Middle School, which provides water for 24 hours.

2. The power supply is introduced from the power distribution room in the compound of the group company.

3. The heat source is directly supplied by the urban heating pipeline.

4. The gas is directly supplied by the gas pressure regulating station in the backyard of the group company.

Third, the construction area and construction purposes

The parcel covers an area of 35 19.2 square meters, with a total construction area of 15997.05 square meters. The general plan is divided into two buildings, one with six floors in the south and one with 1 1 floor in the north, which are divided into houses, underground garages and shops on the ground floor. These include:

Residential building: 12343.60m2, height = height > 3.0m, with 84 households, accounting for 77% of the total construction area. Two bedrooms, two living rooms and one bathroom, with a construction area of 80- 100 square meters, accounting for15% of the total number of households; Three bedrooms, two halls and one bathroom, with a building area of1/kloc-0-130 square meters, accounting for 25% of the total number of households; Three bedrooms, two halls and two bathrooms, with a construction area of130-160m2, accounting for 50% of the total number of households; With four bedrooms, two halls and two bathrooms, the construction area exceeds 180 square meters, accounting for 10% of the total number of households. The service coefficient is 0.85-0.90.

Ground floor business: 2,606.04 square meters, located on the ground floor of the South Building 1-2, height = height >; More than 3.6 meters, the second floor height = height >; 3.0m, accounting for 16% of the total construction area.

Underground garage: 1047.4 1 m2, 3.0m high, with more than 30 parking spaces, and the ratio of total number of households to parking spaces is more than 2.8/ 1. The entrance to the underground garage is located at

Power of Attorney for Project Design 4 Party A: xxxxxxxxx

Party b: xxxxxxxxx

Party A entrusts Party B to design and manufacture circuits for it. In order to complete the task with good quality and quantity, Party A and Party B have reached the following agreement through consultation:

1. Before signing this agreement, Party A shall provide Party B with a detailed circuit design task book, specifying the functions and parameters of the designed circuit; The task book is the basis for Party B to design and manufacture circuits.

2. Before signing this agreement, Party A shall read the detailed description of Party B's circuit design in detail.

3. Before signing this agreement, Party B shall submit a detailed list of circuit design fees to Party A and introduce relevant matters in detail.

4. Alteration and termination of the agreement

(1) Termination of the Agreement by Party A: Party A shall bear all the expenses already spent on circuit design and pay Party B the corresponding service fee; Party B has the right to take back all the information and products related to circuit design that have been submitted to Party A, and Party B reserves all the rights of design.

(2) Termination of the Agreement by Party B: Party B shall bear all expenses already spent on circuit design and return all expenses paid by Party A before this.

(3) The above two clauses are invalid when irresistible factors occur.

(4) If this agreement is changed due to design needs, both parties shall settle it through consultation.

(5) If Party B's circuit design does not meet the requirements of the design task book, it shall be handled as Party B's termination agreement.

5. Payment method

(1) According to the schedule of ordinary circuit design fees submitted by Party B to Party A, Party A shall pay all the fees for xxxxxxxxx circuit design to Party B..

(2) Within xxxxxxxxxx working days after the signing of this agreement, Party A shall pay all the circuit design fees 1/2 in advance to Party B according to the schedule of ordinary circuit design fees that Party B should submit to Party A, otherwise it will be deemed that Party A has terminated the agreement; When Party B completes the design and delivers it to Party A according to the requirements of the design task book, Party A shall pay all the remaining expenses to Party B, otherwise it shall be deemed that Party A has terminated the agreement. ..

6. Three items of this agreement (agreement, design specification and expense schedule) are made in duplicate, with each party holding one copy; It has legal basis and effect; Party B reserves the right of final interpretation.

Party A (seal): xxxxxxxxx

Party B (seal): xxxxxxxxx

Representative (signature): xxxxxxxxx

Representative (signature): xxxxxxxxx

Xxxxxxxxxxxxxxxxxx month xxxx day

Xxxxxxxxxxxxxxxxxx month xxxx day

Project Design Power of Attorney 5 Project Name:

Person in charge of writing unit:

Writing unit:

(Signature) (Signature) Year Month Day

Carefully designed and built.

The specific requirements and precautions of the commissioned design project must be explained:

1. Design in strict accordance with relevant national laws and regulations and industrial design specifications. 2. According to the actual situation of the project, according to the principle of reasonable priority, combined with the present situation of reforming the regional water supply network, the system is comprehensively designed.

3. Under the premise of meeting the normal pressure water supply, the project cost is minimized and the investment benefit is maximized.

4. The system scheme design should fully consider the convenience and reliability of operation, maintenance and management. 5. Adopt new technologies and materials as much as possible to reduce investment cost and facilitate operation and management. 6. The scheme design of pipe network system should leave room for planning, development and expansion.

Schematic diagram or other instructions:

See the attachment for the schematic diagram.

Examination and approval opinions: (mainly explain whether the entrusted "description and requirements" are feasible.

Change, required design completion date, drawing delivery unit, and which unit will pay the design fee. )

Approver: Manager: Contact: Tel: Approver (signature)

date month year

Power of Attorney for Project Design 6 Entrusting Unit:

Entrusting unit:

It is planned to be built, and now your company is entrusted to carry out the first phase survey and design of the road.

I. Project name:

Second, the design stage: the first stage of survey and design.

3. Design principle: Organize survey and design work according to the principles of overall planning and coordination, minimum damage to ecological environment, maximum recovery, good landscape ecological effect, safety and high efficiency; At the same time, it should meet the requirements of relevant standards and specifications of the Ministry of Communications.

Four. Entrust content:

Construction drawing design (including traffic engineering and facilities along the line) and budget preparation of the first phase of highway.

Main technical standards of verbs (abbreviation of verb):

1. Route grade: Grade III, with design speed of 30 km/h.

2. Pavement width: clear 6.5m

3. Design load: Highway-Grade II.

The remaining indicators should meet the relevant requirements of JTG B0 1-20xx in Technical Standards for Highway Engineering of the Ministry of Communications. (In areas with particularly difficult topographical conditions, after technical and economic comparison, the technical indicators can be appropriately reduced. )

Submission results and time requirements of intransitive verbs

Submitted results: copies of the reviewed construction drawing design documents.

Document submission time: year month day.

date month year

Power of Attorney for Project Design 7×××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××

Water supply and drainage, fire control

(1) design scope

* * * * Project 1 # ~ 13 # Residential Building and its underlying business (including civil air defense), underground garage, pump house, water source heat pump house, external pipes and wells of water source heat pump.

(2) System setting and system description

1, system settings

This community is equipped with water supply system, hot water system, drainage system and fire fighting system.

2. System description

(1), water supply system

Water supply mode: the residential buildings, shops and garages in this community use municipal water supply pipe network as water source, and adopt frequency conversion water supply and pool water supply mode.

Water supply pressure: the municipal water supply pressure in this area is 0. 10Mpa.

Tap water connection location: Zhongxing Street (main pipeline DN200) and Binhe Street (main pipeline DN 150).

(2) Drainage system

Drainage mode: from 1 # to 13 # residential building and commercial sewage and garbage at the bottom. Sewage and wastewater are discharged into municipal pipe network after being treated by septic tank, and outdoor rain and sewage are diverted.

Drainage direction: rainwater and sewage in the residential area are discharged to Zhongxing Street in the north.

(3) Hot water system: Residential bathrooms and kitchens are equipped with hot water systems, which are supplied by electric water heaters in bathrooms.

(4) Fire-fighting system: Indoor fire hydrant system, outdoor fire hydrant system, automatic sprinkler system and fire extinguisher are set up in this community according to the requirements of design specifications.

(3), pump room and external pipelines

1. The residential pump house is located in the underground garage.

2, pipeline engineering materials

(1), water supply pipe: ductile iron pipe.

(2) Sewage pipe: HDPE double-wall winding pipe.

(3) Rainwater pipe: HDPE double-wall winding pipe.

(4) Outdoor hydrant pipe: ductile iron pipe.

(5) External pipeline of indoor fire hydrant: welded steel pipe.

(6) External pipeline of automatic sprinkler system: galvanized steel pipe.

(7) Corrosion protection of buried steel pipes: asphalt paint and glass fiber cloth.

(4), 1 # ~ 13 # residential building and its shops and underground garage.

1, water supply

(1), metering method: residential water meters and commercial water meters leave the house, with one meter for each household. Residential water meters are located in tube wells, and commercial water meters are located in various merchants. The water meter adopts infrared card type.

(2) Design requirements: the balcony of the house is equipped with a washing machine faucet, and each shop is equipped with a mop pool faucet. The water supply pipes in the bathroom and kitchen are hidden, and the water supply pipes in the bathroom of the bottom shop are exposed. Water supply pipes laid on the ceiling should be protected from condensation.

(3) Engineering materials: Steel-plastic composite pipes are used in front of indoor water supply risers and water meters for each household, and PPR pipes are used for branch pipes for each household, with pipe grade S4. Anti-condensation materials are rubber and plastic materials.

Step 2: Dilemma

(1), a hot water system is installed in the bathroom and kitchen of the house, and the water is supplied by the electric water heater in the bathroom. The user is responsible for the water heater, and this construction drawing design only makes the embedded pipes from the water heater to each water point.

(2) Installation requirements: the ground cushion and the wall are concealed.

(3) Engineering materials: PPR hot water pipes are adopted, with pipe grade S3.2

Step 3 drain water

(1). Drainage mode: residential buildings and commercial sewage and garbage at the bottom are combined into one.

(2) Design requirements: drain pipes are added in the tube wells, and floor drains are set in each tube well. There is a washing machine floor drain on every balcony at home, and every household in the store has a mop pool and a floor drain. Outdoor air conditioning condensate pipe. Centrifugal cast iron pipes and fittings are used at the bottom of the riser.

(3) Engineering materials: PVC-U spiral silencing pipes and accessories are used for drainage risers, and ordinary PVC-U drainage pipes are used for horizontal branch pipes and outdoor pipes. Rainwater riser adopts national standard PVC-U solid wall pipe without special rainwater pipe. In addition to using ordinary plastic brackets, a layer of steel bracket groove is added every two layers.

4. Installation of indoor fire hydrant system, automatic sprinkler system and fire extinguisher.

(1), water supply mode: fire pump from community pump house.

(2) Design requirements: The residence, shop and garage are located in fire hydrant box and fire extinguisher box respectively. Residential buildings, shops and garages are all exposed in fire hydrant box. Fire hydrant box, a residential building, needs 95S4- 12 E single bolt fire hydrant box.

(3) Engineering materials: the fire hydrant system adopts welded steel pipes, and the automatic sprinkler system adopts galvanized steel pipes. The valves of fire hydrant system and automatic sprinkler system adopt cast iron valves. The fire water tank adopts FRP water tank.

Heating, Ventilation and Air Conditioning Section

(1) design scope

* * * * Project 1 # ~ 13 # Residential Building and its underlying business (including civil air defense), underground garage, pump house, water source heat pump house, external pipes and wells of water source heat pump.

(2) System setting and system description

1, system settings

The community is equipped with heating system, air supply and exhaust system and smoke control and exhaust system.

2. System description

(1), heating system: water wells and water source heat pump units are used for heating in this community. The residential and commercial parts of this community use radiant floor heating.

(2) Air supply, exhaust and smoke control system: The air supply, exhaust and smoke control system is set up in this community according to the requirements of design specifications.

(3), pump room, water source heat pump room and external pipelines

1. The residential pump room and water source heat pump room are centrally arranged in the underground garage.

2, pipeline engineering materials

(1). External pipes of heating system: welded steel pipes and seamless steel pipes.

(2) Insulation of buried part: polyurethane.

(4), 1 # ~ 13 # residential building and its shops and underground garage.

1, radiant floor heating system and radiator heating system

(1), heating mode: radiant floor heating is used in the residential part of the community, radiant floor heating is used in the bathroom of the community, and there is no heating in the kitchen. Floor radiant heating is used in the bottom business.

(2) Measurement method: one meter per household, and the heat meter is located in the heating well. The residential heat meter adopts infrared card type. In the commercial part, a heat meter is set at the thermal entrance, and the cost is shared equally by users.

(3) Installation requirements: install the distribution main pipe in the bathroom.

(4) Engineering materials: The riser and main pipe of the floor radiant heating system are welded steel pipes for domestic use.

The pipeline to the distribution main pipe adopts PP-R hot water pipe, the pipeline grade is S3.2, and the floor heating pipe adopts PE-RT pipe. Rubber and plastic materials are used for thermal insulation, and polyurethane is used for thermal insulation of buried parts.

2, air supply and exhaust and smoke control system

(1). System setting: Mechanical air supply, air exhaust and smoke control and extraction systems are set in this project, and the air exhaust system and smoke control and extraction system are used together at ordinary times to exhaust air at ordinary times and extract smoke in case of fire. Every household in the store has an air supply and exhaust regulating valve.

(2) Installation requirements: The air duct should be laid near the bottom of the beam.

(3) Engineering materials: The fan in the garage is a low-noise box fan. The air duct is made of glass fiber reinforced plastic.

Power of Attorney for Project Design 8 Party A: _ _ _ _ _ _ _

Party B: _ _ _ _ _ _

Party A entrusts Party B to design and manufacture circuits for it. In order to complete the task with good quality and quantity, Party A and Party B have reached the following agreement through consultation:

1. Before signing this agreement, Party A shall provide Party B with a detailed circuit design task book, specifying the functions and parameters of the designed circuit; The task book is the basis for Party B to design and manufacture circuits.

2. Before signing this agreement, Party A shall read the detailed description of Party B's circuit design in detail.

3. Before signing this agreement, Party B shall submit a detailed list of circuit design fees to Party A and introduce relevant matters in detail.

4. Alteration and termination of the agreement

(1) Termination of the Agreement by Party A: Party A shall bear all the expenses that have been used for circuit design and pay corresponding labor fees to Party B; Party B has the right to take back all the information and products related to circuit design that have been submitted to Party A, and Party B reserves all the rights of design.

(2) Termination of the Agreement by Party B: Party B shall bear all expenses already spent on circuit design and return all expenses paid by Party A before this.

(3) The above two clauses are invalid when irresistible factors occur.

(4) If this agreement is changed due to design needs, both parties shall settle it through consultation.

(5) If Party B's circuit design does not meet the requirements of the design task book, it shall be handled as Party B's termination agreement.

5. Payment method

(1) According to the detailed list of common circuit design expenses submitted by Party B to Party A, Party A shall pay Party B all the expenses for designing the circuit _ _ _ _ _ _ _ _ _ _.

(2) Within _ _ _ _ _ _ working days after the signing of this agreement, Party A shall pay all the circuit design fees 1/2 in advance to Party B according to the schedule of ordinary circuit design fees submitted by Party B to Party A, otherwise it will be deemed that Party A has terminated the agreement; When Party B completes the design and delivers it to Party A according to the requirements of the design task book, Party A shall pay all the remaining expenses to Party B, otherwise it shall be deemed that Party A has terminated the agreement. ..

6. Three items of this agreement (agreement, design specification and expense schedule) are made in duplicate, with each party holding one copy; It has legal basis and effect; Party B reserves the right of final interpretation.

Party A: _ _ _ _ _ _ _ Party B: _ _ _ _ _ _ _

Date: _ _ _ _ _ _ Date: _ _ _ _ _ _ _ _

Project Design Power of Attorney 9 Entrusting Unit:

Entrusting unit:

It is planned to be built, and now your company is entrusted to carry out the first phase survey and design of the road.

I. Project Name

Second, the design stage.

Phase I Survey and Design

Third, the design principles

Organize the survey and design work according to the principles of overall coordination, minimum damage to the ecological environment, maximum recovery, good landscape ecological effect, safety and efficiency; At the same time, it should meet the requirements of relevant standards and specifications of the Ministry of Communications.

Four. Entrust content

Construction drawing design (including traffic engineering and facilities along the line) and budget preparation of the first phase of highway.

Main technical standards of verbs (abbreviation of verb)

1. Route grade: Grade III, with design speed of 30 km/h.

2. Pavement width: net 6. 5 meters

3. Design load: Class II highway.

Other indicators shall meet the relevant requirements of JTG B01-200x in Technical Standards for Highway Engineering issued by the Ministry of Communications. (In areas with particularly difficult topographical conditions, after technical and economic comparison, the technical indicators can be appropriately reduced. )

Submission results and time requirements of intransitive verbs

Submitted results: copies of the reviewed construction drawing design documents.

Document submission time: year month day.

date month year

Power of Attorney for Project Design 10 xxx Co., Ltd.:

The ultra-white photovoltaic glass production line of xxxxxx Co., Ltd. designed and contracted by your company has entered the stage of equipment installation and will be put into production soon. According to the market situation of photovoltaic glass, our company decided to build two photovoltaic glass deep processing production lines in the original finished product warehouse. In order to implement the project construction, we entrust your company to design the deep processing project, and also entrust the functional zoning change and design adjustment of the factory caused by the layout of two deep processing lines. Details are as follows:

I. Project name:

Project of photovoltaic glass deep processing production line of xxxxxx Co., Ltd.

Second, the location:

Using the original finished product warehouse and broken glass yard, please plan the broken glass yard separately.

Third, the nature of the project:

Newly built.

Fourth, the production line scale:

production line

Two deep processing production lines

scale

2× 14000 Euro/day

Total production capacity

10 million square meters per year

product category

Ultra white calendered glass

Product thickness

2.5 ~ 4mm

Verb (abbreviation of verb) related basic construction conditions:

1. original glass: the original glass is transferred from the cold end to the deep processing workshop by forklift;

2. Water supply: use city tap water or deep well water provided by factories, and design ultra-pure water preparation system according to the requirements of deep processing technology;

3. Power supply: 10KV power supply is provided by the factory switch station, and the substation of the deep processing workshop needs to be designed;

4. Sewage discharge: design the grinding wastewater treatment system;

5. Transportation: all the deep-processed products are transported by car, and the loading is considered by crane and forklift.

Six, production line configuration requirements:

1, edging: If there is no more suitable suggestion, adopt Foshan Botero edging machine;

2. Coating: If there is no more suitable suggestion, adopt roll coater imported from Italian saffron;

3. Tempering unit: If there is no more suitable suggestion, use the products of Bei Bo or Randy;

4. loader: if there is no more suitable suggestion, use domestic manipulator;

5. Other equipment: choose the products of domestic mainstream manufacturers;

Seven, the project needs to focus on three aspects:

1, environmental protection: sewage discharge must meet the standards;

2. Product quality: high-grade photovoltaic glass for polysilicon solar cells. The total yield of deep processing is over 90%;

3. The technological process should be as reasonable as possible to reduce the operation cost.

Eight, the progress of the project:

1.Complete the adjustment and design of the functional zoning change of the factory by the end of July;

2. The construction drawing of the building structure of the deep processing workshop shall be submitted before 65438+ in August 2005;

3. Submit the list of main equipment of deep processing system before July 20th;

4, the professional construction drawings submitted in batches before the end of August.

9. According to the above requirements, please send relevant professional engineers to the factory for design contact before July 18, 20xx, so that the design work can be carried out smoothly.

Thank you for your strong support for our work! Tang Qisong!

Customer:

Xx,xx,XX,XX