Current location - Recipe Complete Network - Catering industry - 2018 Hubei Tongshan Hidden Water Cave Geopark tickets + transportation + parking lot information
2018 Hubei Tongshan Hidden Water Cave Geopark tickets + transportation + parking lot information

About the Hidden Water Cave in Hubei I don't know if you have gone to know, now I will talk to you about some of the attractions of this place, you can read the relevant parking lot content, as well as the relevant ticket information.

Parking

Hidden Water Cave Tourist Scenic Area parking lot with a total area of 30,000 square meters, basically to meet the needs of visitors reception.

The parking lot is strictly regulated management, according to the actual situation, do not need to set up the return line and entrances and exits, set up a parking line, subarea parking, there are security personnel 24 hours on duty management.

Hidden Water Cave Scenic Area is divided into two main bodies, Hidden Water Cave and Hidden Water Villa, and the entrances and exits are 7 kilometers apart. The entrance to the cave is reasonably set up, with large-scale parking lots, toilets, visitor reception centers, the main park, etc. The entrance to the cave is equipped with large outdoor billboards, showing visitors an introduction to the Hidden Water Cave, tour guide maps, regional traffic maps, and warm reminder signs, etc. The cave has natural waterfalls and underground mountains. There are natural waterfalls and underground springs at the entrance of the cave, and the ticket gate is equipped with a strong guardrail and a special passage for emergencies, as well as an automatic access control system with modern technology. The entrance of the cave is directly facing the Hidden Water Villa, and the first thing guests see after leaving the cave is the modern style building complex, luxury hotel villas, large-scale catering center, the main garden, and the national style tourists' leisure promenade, and there is a commercial street at the entrance of the cave, which is available for tourists to buy side dishes, beverages, Tongshan local specialties, and tourist souvenirs.

Ticket traffic

Hidden Water Cave Scenic Area is located in Hubei Xianning Tongshan County in the territory of the Mufu Mountain Range interruption, and Jiangxi Jiujiang City, Wuning, Xiushui counties border, in Wuhan, Nanchang, Changsha between the three major cities, and the distance are within 200 kilometers.

The main means of transportation for excursions are: electric boats, small trains, sightseeing excursion boats on the lake and luxury yachts.

Hidden Water Cave Scenic Spot north of the Beijing-Guangzhou Railway and Beijing-Zhuhai, Hurong Expressway, the construction of the Hangzhou-Ruiyuan Expressway and the scenic area into the hole only 200 meters, the construction of the Daguang Expressway is also adjacent to the scenic area, the 107, 316 National Highway, close to the scenic area, 106 National Highway crossing the territory of Tongshan, from the scenic area is only ten kilometers, the scenic area has been criss-crossed by the land transportation network coverage, the traffic is very convenient.

Hidden Water Cave Scenic Spot is 40 kilometers away from Xianning Railway Station and 98 kilometers away from Wuchang Railway Station. After the opening of Hangzhou-Rui Expressway, Wuhan tourists can turn Hangzhou-Rui Expressway through the Beijing-Zhuhai Expressway in the north of Xianning to the Hidden Water Cave scenic area (only 200 meters off the highway) takes only one hour. Hidden water hole by Hang Rui high-speed direct to Jiujiang and Yueyang were only about 150 kilometers, are as long as an hour and a half trip.

Wuhan's existing Wuchang Railway Station and Hankou Railway Station and Wuhan Railway Station (high-speed railroad station), are the country's large-scale railway stations, Wuhan is the country's only city with three large-scale railway stations. Now there are three high-speed trains and train lines from Wuhan to Beijing, Shanghai and Guangzhou, which can reach each other within 6 hours. The construction of intercity train lines within the province is underway, and all of them can be opened within two years.