Mud water engineering contract

Template of Mud Water Engineering Contract

Part I: Mud Water Engineering Contract (Template)

Mud Water Engineering Construction Contract

Contract

Employer (hereinafter referred to as Party A):

Contractor (hereinafter referred to as Party B):

In order to strengthen quality and safety management and improve economic benefits, According to the specific characteristics and actual situation of the project, and referring to the Economic Contract Law of the People's Republic of China and the Regulations on the Contract of Construction and Installation Projects, Party A agrees to subcontract the muddy water project construction workload of the following projects to Party B through negotiation on the basis of equality and mutual benefit, and this contract is hereby signed to clarify the responsibilities and obligations of both parties.

1. General situation of the project and scope of contracting

1. Name of the project: 2. Location of the project: 3. Time limit: the project will start on a fixed date; Completion within the time limit of

4. Scope of contract: this project shall be constructed and cleaned according to the construction drawings, the surrounding temporary drainage ditches and the site shall be leveled, civilized construction shall be carried out, and all muddy water projects and related work shall be coordinated with the law enforcement inspection and preparation work at the municipal, district and all levels (except marble and waterproof layer projects).

5. contract mode: contract mode in which the contractor does not include materials, and the construction period, quality and safety are guaranteed.

6. The building materials, scaffolding, trolleys, large machinery, etc. required for this project shall be purchased by Party A and placed on the site for Party B's use. Party b shall be responsible for purchasing and using such petty materials as nails, hammers, iron wires, small cutting machines, sand shovels, ash buckets, ash wires, sand boards, ash spoons, hammers, pens, etc. required in the construction of this project (its expenses have been included in the contract price).

7. engineering quality requirements: meet the requirements of civil engineering construction specifications: excellent.

8. contract price: based on the construction drawings and the actual construction situation, the project settlement shall be made by the sum of the horizontal projection areas of each floor of each unit project. The contract unit price per square meter is RMB. According to the drawing

, the project quantity is tentatively set as ㎡, and the total contract cost is tentatively set as (RMB), (in words). The contract cost is only used as the basis of advance payment for civil engineering construction progress, and the project settlement is based on the actual completed engineering quantity. Sporadic quantities that are not within the scope of contract contracting shall be settled with the actual quantities negotiated separately as additional expenses.

II. Responsibilities and Obligations of Party A

1. Party A shall provide Party B with a complete construction drawing within three days, and provide Party B with safety technical disclosure, safety operation procedures disclosure and quality technical disclosure, and organize Party B to participate in the joint review of drawings, organize and coordinate Party B to carry out construction and solve technical problems in drawings encountered during construction.

2. Provide Party B's construction personnel with accommodation, kitchen, shower room, domestic water and electricity free of charge.

3. Strictly review the construction material plan declared by Party B, and timely purchase materials and transport them to the construction site for Party B's use as planned.

4. Party A's on-site technicians, quality inspectors and safety officers have the right to conduct

all-round supervision on the quality and safety during construction, and Party B will unconditionally obey.

5. due to party b's lack of manpower and poor technical strength, it can't meet the requirements of construction specifications, and it can't

complete the weekly plan and monthly plan formulated by party a on time, party a has the right to terminate the contract and order it to leave.

iii. responsibilities and obligations of party b

1. strictly abide by national laws and regulations and local public security management regulations, abide by the rules and regulations of party a, obey the command and leadership of party a's on-site management personnel, organize construction as required, ensure quality and quantity, and complete construction tasks on schedule.

2. Participate in the blue prints.the design of construction organized by Party A, accept the on-site safety technical disclosure and quality technical disclosure of Party A, draw up the construction plan and schedule according to the construction period, and submit it to Party A for review.

3. Party B must strictly implement the current national construction specifications and carry out the construction according to the design requirements of the drawings. If any errors or ambiguities are found in the design drawings, Party B must take the initiative to contact Party A's on-site technicians in time to ensure the project quality and construction progress. And do a good job in the construction quality inspection records and handover inspection of various disciplines and ministries, and sort out the materials in strict accordance with the relevant provisions of ISO9111 international certification and submit them to Party A for filing.

4. Party B must carry out safety education, safety disclosure and pre-shift disclosure for its own construction personnel. Strict and effective safety measures must be taken in the construction to ensure production safety, realize the goal of "five noes" in production safety and ensure that production safety reaches the standard.

5. Party B must be responsible for the environmental sanitation of Party B's accommodation and kitchen, do a good job in preventing SARS and bird flu according to the relevant requirements of the government and the company, ensure the environmental sanitation of the kitchen and accommodation, and prevent food poisoning.

6. Party B shall organize the construction in strict accordance with the requirements of the current national construction safety standards, and it is strictly forbidden to carry out illegal construction; The use of machinery shall be in accordance with the requirements of mechanical operation regulations, and illegal operation is strictly prohibited. Temporary construction electricity shall be set up by Party A's full-time electrician on site, and it is forbidden to set up temporary electricity without permission. All risk liabilities, property losses and expenses caused by Party B shall be borne by Party B..

7. Party B shall abide by the company's rules and regulations and do a good job of unity within itself and between teams and groups. If there is any violation, it shall be punished according to the relevant regulations of Party A.. If the circumstances are serious, it will be handed over to the local public security organ for handling, and all the responsibilities will be borne by Party B..

8. Party B shall accurately calculate the materials according to the drawings and submit the material plan to Party A seven days in advance, with the material measurement error not greater than +2%. If the materials are misused, the construction site has the right to be punished by 3-5 times the total value of the materials according to the regulations on site punishment. And bear the responsibility and loss of shutdown, slowdown and time delay caused by material planning mistakes, and bear the economic responsibility of material waste and excess caused by this.

9. Party B shall make full and reasonable use of materials to save materials and put an end to waste. Do not be overqualified, and cut it indiscriminately. Parts processed into finished products must be protected. And do a good job of cleaning the materials and garbage in the site every day to ensure the image of civilized construction on site.

11. During the construction, Party B shall coordinate the safety measures for cross-operation with each team to ensure the construction safety.

11. during the construction, Party B must accept the supervision and inspection of the quality and safety by the on-site technicians of Party A's project department. When quality problems and potential safety hazards are found during the inspection, Party B will unconditionally obey the rectification until it meets the requirements, and bear all the economic losses caused thereby. Party A's project department has the right to impose penalties, and Party A has the right to terminate the contract if it refuses to change after repeated instruction. Party B shall be responsible for the resulting economic losses.

12. it is the responsibility of party b to maintain and protect the machinery and equipment used. If the mechanical equipment used is damaged due to poor maintenance and improper use, all repair costs and material costs shall be borne by Party B..

13. if party b is unable to implement the terms of the contract due to lack of manpower and poor technology, and requests to terminate the contract, party a has the right to make an automatic exit without handling the settlement.

4. Project quality:

1. This project is explained by construction drawings, and the design changes and the construction and acceptance specifications formulated by the State such as Code for Construction and Acceptance of Building and Installation Engineering and Unified Standard for Inspection and Evaluation of Building and Installation Engineering are the acceptance criteria for quality evaluation. The quality of this project should reach the national evaluation standard.

2, concrete pouring, brick masonry, plastering, brick paste construction must be carried out in strict accordance with the construction specifications, and the dimensions of compactness, flatness and verticality shall not exceed the allowable deviation of the specifications.

3. In the process of construction, if the flatness of brick masonry and plastering can't meet the requirements and the phenomenon of honeycomb occurs during concrete pouring, Party B shall bear all the cost of rework, and all the losses caused by rework affecting the construction period shall be borne by Party B, and punishment shall be given according to the seriousness of the case. For details, please refer to the punishment regulations formulated by the site.

5. Safety in production:

1. Party B shall strictly abide by the safety operation rules for construction, and bear all responsibilities and expenses for property losses and casualties caused by its own reasons.

2. Party A shall provide corresponding safety protection articles (safety helmet, safety belt, safety net, etc.) and protective measures according to relevant regulations. And has the right to criticize and educate Party B for violating the safety operation rules due to poor management, and impose a fine if the circumstances are serious.

VI. Civilized construction:

1. During the construction, Party B shall strictly abide by the regulations on environmental protection of civilized construction on site, so as to clean up the site after work every day, keep the materials neatly stacked, and clean up the waste in time. If Party B neglects management and causes messy pollution on the site, Party A has the right to send personnel to help clean up the site. According to the actual labor for cleaning up, the number of workers per working day is

Chapter II: Homeimprovement Contract for Mud Workers

Party A: (Employer) ID number: Party B: (Contractor) ID number: according to the Contract Law of the People's Republic of China and the People's Republic of China.

article 1: general situation of the project

1. project location: building * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

3. The construction period is from

day to day.

4. contract price: the project is actually calculated according to the price agreed by both parties.

article 2: contracting overview

party a contracts the project to party b, and party b shall not subcontract it.

article 3: specific contract price, scope and requirements

1. wall demolition: the price of wall demolition is calculated at 15 yuan per square meter. Scope: the wall between the kitchen and the

small balcony, and the right wall of the small balcony at the entrance of the hall. If Party A needs to demolish other walls during the construction < P >, it shall be calculated according to this price after both parties reach an agreement through consultation. Requirements: Party A's acceptance is deemed as passing.

2. wall building (including plastering cement mortar inside and outside, commonly known as rough swing): the price of wall building is calculated according to 28 yuan per square meter. Scope: the part of the entrance balcony with anti-theft railing (CM high) and the original kitchen door before demolition. If Party A has other parts that need to build walls during Party B's construction, it shall be calculated according to this price after negotiation between Party A and Party B.. Requirements: First, the brick should be laid by pulling wires, and the wall that is cut out should be vertical and horizontal; Second, the ground should be cleaned, and the cement slurry that fell off during wall building should be cleaned as soon as possible and reused as much as possible, so as not to waste cement materials; Third, the cement slurry should be "eaten" between bricks, and there should be no leakage, so that there can be no light when looking from one side; Fifth, the brick can only be rough after it has been thoroughly dried for a week, and the wall surface must be flushed and soaked before it is rough, and then the cement mortar is painted. The rough wall is flat and vertical.

3. Tiling: Tiling of the floor is calculated according to 28 yuan per square meter. Scope: 81*81CM tiles are pasted on the lobby floor, 61*61 tiles are pasted on the master bedroom, the second bedroom and the guest bedroom, and the tiles on the balcony are subject to the purchased tiles. The doorstone paving of the main bedroom, the second bedroom and the guest bedroom in the hall is included at this price. If the corridor of the hall is paved with wave lines, the wave lines will be calculated according to 211 yuan, and the area of the wave lines will not be included in the tile area. (This sentence needs to be changed, and it needs to be clear how to paste it, whether to use tiles or not, and how to measure the size. I think it should be calculated according to the square meter of 28 yuan, and the route of the channel is not difficult, or 211 yuan includes the footwall line of the aisle.) The specific area shall be subject to measurement. Requirements: First, the horizontal < P > line should be laid before the floor tile is laid. Before the floor tile is laid, it is necessary to check and measure the height of the surrounding ground, including conduit, water pipe, door crack, etc., to confirm the laying height of the floor tile, so as to ensure the overall level of the laid floor tile and keep the distance from the door crack at 1.5-1CM. Second, the ground should be cleaned before the bottom of cement mortar is laid, and the raised mud should be leveled. Third, the problem of thermal expansion and cold contraction of floor tiles should be taken into account when paving. Space should be reserved around the wall, and the brick joints should be kept at a distance of 1 mm. After paving, white cement should be hooked on the brick joints. If Party A asks for caulking agent and caulking agent, Party B needs to agree to hook it. Fourth, floor tiles, threshold stones, etc. must be smeared with cement slurry before paving, and the surface should be fixed with a hammer. At the same time, level detection should be carried out, and the cement on the brick surface should be wiped off with a wet cloth to detect whether it is empty in time. The effect of laying the whole tile is that the ground is flat, the angle is accurate, the interface is aligned, and there is no empty drum. Fourth, the brick surface should be knocked for inspection after 12 hours of paving. If there is any knocking, it should be laid again. After the floor tile is paved, it should be covered with cardboard to prevent the brick surface from being scratched by sand, and keep the brick surface clean, at least not with piles of cement mortar. You can't walk on the brick surface until at least 24 hours after paving.

3. Kitchen: The muddy water in the kitchen is calculated at RMB 1,811. Scope: The kitchen scope consists of Party A's small kitchen and small balcony. Party B is responsible for the waterproofing of the kitchen, the paving of floor tiles and wall tiles, and the installation of floor drains. Requirements: First, the kitchen floor is waterproof and painted twice after leveling, and the surrounding walls are painted with a height of 151CM; Second, the wall must be vertical before tiling, which meets the national standards. Third, the kitchen floor tiles are laid, and the wall tiles are laid to 2.8 meters high; Fourth, the installation of kitchen floor drain must meet the lowest standard in the kitchen; Five

refers to the matters needing attention and requirements for laying floor tiles and wall tiles according to the requirements in the second point above (tile laying); Sixth, the wall brick needs to be soaked for one hour before it can be put on the wall; Seventh, do a good job in meeting other standards stipulated by the state.

4. Toilets: the muddy water in the public bathroom and the master bathroom is calculated at RMB 1,511 per bathroom. Scope: wall tiles on the wall, waterproofing, floor drain, toilet installation and other matters involving muddy water. Requirements: First, lay waterproof mortar for the sink, and paint the wall with waterproof paint (the sink floor is painted with three layers of waterproof, and the waterproof layer and mortar layer are painted in layers. The walls around the bathroom must be painted twice, and the sink floor is 2.5 meters high, and other walls must be painted twice until the floor is 1 meters high). After each painting, it needs to be dried in the shade before painting. After painting waterproof, be careful not to damage the waterproof layer during toilet construction. Secondly, the sedimentation tank is paved with drainage pipes. The drainage pipes are made of large-diameter pvc plastic pipes, which are bonded with adhesives, and there are water traps in the pipes. The third is to level the toilet floor with fillers such as cement mortar; Fourth, before sticking the magnetic sheet on the wall, it needs to be immersed in water for 1 hours before sticking, and the height of the ceramic tile is 2.8 meters from the wall to the floor; The fifth is to lay the ground, including installing squatting pans, toilets and floor drains. The squatting area is 5-7CM higher than the shower area. When there is a water pipe opening on the wall, the magnetic disk should have corresponding holes, etc. The punched holes should be appropriate in size and beautiful. Sixth, the bathroom should ensure smooth drainage and smooth ground, and the requirements for paving floor tiles and wall tiles should be carried out according to the above requirements for paving tiles.

5. Bulkhead: Mud and water matters of the Bulkhead in the kitchen, public toilet and master bathroom shall be calculated according to each item in 211 yuan. Scope: pipe lining of kitchen, public toilet and master bedroom

bathroom, including brick-sweeping and rough swinging.