Current location - Recipe Complete Network - Catering industry - Introduction of Yancheng Bidding Network?
Introduction of Yancheng Bidding Network?
Yancheng Bidding Network belongs to Yancheng Public Resources Trading Network, which is a professional website for trading services in the fields of project bidding, government procurement and information management of construction project bidding of various construction enterprises in Yancheng area. Yancheng Bidding Network actively performs the corresponding duties of the provincial bidding network (Jiangsu Bidding Network) and maintains the order of all kinds of engineering procurement projects.

General situation of Yancheng public resources trading network;

Yancheng Public Resource Trading Center was formerly Yancheng Bidding Trading Center. In order to effectively promote the reform of the city's public * * resources trading system, in July 20 12, with the approval of Yancheng Municipal Party Committee and Municipal Government, Yancheng Public * * Resources Trading Center was renamed as Yancheng Public * * Resources Trading Center, Yancheng Construction Bureau, Municipal Economic and Information Committee, Municipal Finance Bureau, Municipal Transportation Bureau, Municipal Water Conservancy Bureau and Municipal Government. After the integration, Yancheng Public Resource Trading Center is a deputy-level financial subsidy institution. Yancheng is one of the first prefecture-level cities in Jiangsu Province to start the reform of public resources trading system. In the absence of mature examples in the province, a set of reform models of public resources trading system with its own characteristics and in line with its own reality has been explored.

In order to further promote the development of bidding informatization of Yancheng Tendering Network, Yancheng Tendering Network has formulated relevant systems. In order to further manage the design and construction of highway projects, Yancheng Tendering Network has formulated relevant general contracting management measures for highway engineering design and construction, which includes the following contents:

Article 15 A project legal person shall, in accordance with the contract, strengthen the general contracting management, urge the general contracting unit to fulfill its contractual obligations, strengthen the management of engineering survey and design and geological survey and acceptance, and strictly control the quality, safety, progress, investment and environmental protection of the project. If the project legal person neglects or deviates from the performance of the contract by the general contractor, which may cause heavy losses or seriously affect the realization of the contract objectives, it shall interview the legal representative of the general contractor and terminate the general contract according to the contract when necessary.

Article 16 In the preliminary design of a general contracting project, the design depth should be increased, the geological survey should be strengthened, the major technical schemes should be defined, and the quantities and budgetary estimates should be strictly examined and approved.

The preliminary design unit is responsible for the survey and design in the preliminary design stage of the general contracting project, and consulting and verifying the construction drawing design or design change according to the requirements of the project legal person. Seventeenth general contracting units shall, according to the provisions of the contract and the needs of engineering construction, submit detailed survey data and construction drawings and design documents in stages, and modify and improve them according to the examination opinions. The design of the construction drawing shall meet the requirements of the approved preliminary design documents, and meet the mandatory standards and relevant regulations of engineering quality, durability and safety. After the project legal person agrees, it shall be reported to the competent department of transportation for examination and approval in accordance with relevant regulations. After the construction drawing design is approved, it can be organized and implemented.

Eighteenth general contracting units in accordance with the general contract, the construction drawing design and project quality, safety and progress are fully responsible. Responsible for the survey and design of construction drawings, engineering construction and engineering repair during the defect liability period, and cooperate with the project legal person to complete land acquisition and demolition, local coordination, project review and completion acceptance.

Nineteenth project legal person according to the scale of the construction project, technical complexity and other factors, according to the relevant provisions of the program to choose social supervision to carry out project supervision. The supervision unit shall supervise the survey and design, engineering quality, construction safety, progress, environmental protection, measurement and payment of the general contracting construction drawing and the engineering repair during the defect liability period according to the relevant regulations and contracts, and review the survey and design scheme, procurement and construction organization implementation scheme, construction drawing design documents, special technical scheme, project implementation progress, quality and safety assurance measures, measurement and payment and engineering changes prepared by the general contracting unit.

Twentieth general contracting projects shall be organized and implemented in accordance with the approved construction drawing design. The general contractor shall, according to the characteristics of the project and the contract, refine the design and construction organization plan, and formulate the design and construction progress, project quality and construction safety objectives, environmental protection measures and investment completion plans.

Article 21 The general contractor shall strengthen the coordination between design and construction, establish a project management and coordination system, improve and optimize the design in time according to the actual project, improve the construction scheme, rationally allocate the design and construction forces, and improve the quality assurance system. Twenty-second bulk materials, key equipment and main components permanently used in the project can be purchased by the project legal person according to law or by the general contractor according to regulations. The tenderer shall specify the procurement responsibility in the tender documents. Where the procurement is conducted by the general contractor, centralized procurement shall be adopted, and the procurement plan shall be approved by the project legal person and subject to the supervision of the project legal person.

Twenty-third general contracting units should strengthen the management of subcontracted projects. The selected subcontractors shall have corresponding qualifications, and send the subcontract to the project legal person with the consent of the project legal person.

Twenty-fourth general contracting projects shall be measured and paid in accordance with the measurement and payment methods and procedures stipulated in the tender documents.

When adopting bill of quantities management, the general contractor shall adjust the bill of quantities according to the construction drawing design documents approved by the competent department of transportation and the principle that the total price of each sub-project is consistent with the total contract price, and it will be used as the payment basis after being audited by the project legal person; In the process of project implementation, measurement and payment shall be made according to the list and contract terms; After the completion of the project, the general contractor shall prepare the project completion documents and final accounts according to the adjusted final bill of quantities.

Twenty-fifth general contracting projects need to make design changes in the implementation process, and major changes or major changes shall be reported to the transportation department for approval in accordance with relevant regulations. General changes should be informed to the supervision unit and the project legal person before implementation, and the project legal person has the right to refuse unreasonable changes. Any design change shall not lower the quality and safety standards approved by the preliminary design, and shall not lower the quality, durability and safety of the project.

Engineering cost changes caused by design changes shall be handled according to the principle of risk division. Among them, the design changes (including design improvement) falling within the risk scope of the general contractor shall be paid by the general contractor for the part exceeding the original quotation, and the part lower than the original quotation shall be paid according to the provisions of Article 24. Design changes that fall within the risk scope of the project legal person shall be adjusted and implemented after the bill of quantities and the total contract price are submitted for approval according to regulations.

The project legal person shall, according to the design change management regulations, formulate a management system to encourage the general contractor to optimize the design and save costs.

Twenty-sixth general contracting units shall, in accordance with the relevant provisions and contract requirements, be responsible for the project repair during the defect liability period to ensure that the technical conditions of highways meet the specified requirements.

Twenty-seventh general contracting units to complete all the projects agreed in the contract, meet the quality and safety standards, and fulfill their obligations during the defect liability period, the project legal person shall complete all payments in accordance with the contract.

Twenty-eighth general contracting units shall, in accordance with the relevant provisions of delivery and completion acceptance, prepare and submit the completion drawings and related documents.

Yancheng public resources trading network website:/front/default.aspx.

Contact person of Yancheng Bidding Network: 05 15-866635 17

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.