Property Type: Commercial-Office Building
Property Fee: RMB1/ping/month
Decoration: Public *** Partially Finished
Building Type: High-rise
Parking Space: 1
Basic Information: The project's land area is 51,741 square meters, and the building area is 93,133.88 square meters. The plot ratio is 1.8, and the green area ratio is 35%, with a green area of about 50,000 square meters. The total height of the building is 151.5m, ***36 floors, 34 floors above ground, 2 floors underground, 1 to 5 floors are podium commercial, 6-34 floors are office buildings, and the underground is a two-storey parking lot. 50,000 square meters of landscaped area, multiple landscape groups, covering landscape and leisure corridors, sunken lawns, landscape walls, wooden palisades, terraces, walking paths, etc., and at the same time, using the high difference of vegetation to create a wide range of semi-private outdoor spaces, combining It combines sophistication and nature to unify ceremonial life, ecological greenery, and leisure exchanges. In addition, the park is directly connected with Hongguangshan Mountain to form a mountain landscape, and try to retain the existing trees on the mountain, utilizing the topography and terrain to better integrate with the mountain park. It also allows busy office workers to enjoy the ecological office of "looking at the park upstairs and strolling in the park downstairs". Hardware Configuration: The elevator uses ThyssenKrupp elevator, which is one of the world's top three elevator manufacturers. The elevator adopts CAN bus serial communication to control the new generation of TCM elevator control system, which ensures the elevator to run more stably and safely. At the same time, the elevator speed in the high area reaches 3.5m/S, the elevator speed in the VI area reaches 2.5m/S, and the elevator speed in the low area reaches 2.5m/S, which is fast** and multiplies the efficiency. The main building elevators*** counts 12, including 4 elevators in the high area, 6 elevators in the low area, 2 fire-fighting elevators, and is equipped with a VI elevator. Entrance security check at the entrance to the gate to install the DSC purpose of the layer selector, first, according to customer demand assigned elevators, saving owners time, reasonable arrangement of the elevator's operation, but also to reduce the internal consumption of the elevator swipe card into the elevator hall, the DSC selector in the automatic mobilization of ** convenient elevator to the hall to wait for the average marquee time of no more than 30 seconds, greatly reducing the waiting time. Secondly, it can be limited to external visitors, can only reach the registered floor, to ensure the safety of other owners. The glass curtain wall adopts full bright frame design with neat and clear lines; in order to save energy, the skeleton of the glass curtain wall uses 180 series of high-quality bridge-breaking heat-insulating aluminum profiles, and the glass is made of 6 (low-e) double-silver +12A+6mm hollow double tempered glass, filled with argon gas, which improves the heat insulation and thermal insulation effect of the curtain wall even more. The project is a pure steel structure building with good anti-seismic effect and high security. From the design point of view, the net height of the floor is improved as much as possible to increase the benefit gained by the investor. In addition, it is very important that the construction can effectively reduce the generation of dust, and it is an environmentally friendly building.HFC uses the steel structure produced by Zhongjin (Xi'an) Heavy Steel Structure Limited Liability Company, Zhongjin (Xi'an) Steel Structure is a domestic ** steel structure manufacturer, and it has a strict control and guarantee of the quality of the steel structure. Adopting one of the three major international brands - the United States York, the enterprise independent temperature control, new air system, constant temperature design, extremely comfortable, warm as new in all seasons. And the project has its own boiler heating, in the seasonal change of season, you can advance the heating, free to switch between cold and warm, not subject to the time limitations of municipal heating. At the same time, the project is equipped with **international standard intelligent system, OA (Office Intelligence), BA (Building Automation), CA (Communication Transmission Intelligence), FA (Fire Fighting Intelligence), SA (Security Intelligence), realizing intelligent modern office. Project Supporting Facilities: Commercial supporting facilities are also a major feature of the project. 1-5 floors are podiums, with a total area of about 25,000 square meters, and a single-floor area of 4,000-5,000 square meters, with a floor height of 5-6.5 meters (floor height of the main building: 6.5 meters for the 1st floor, 5 meters for the 2nd floor, 5.2 meters for the 3rd and 4th floors, 3.9 meters for the 5th floor, 3.9 meters for the 6th-34th floors); podiums: the 1-4 floors are the same height as the main building, and the 5th floor is 6 meters high, while the 5th floor is 6 meters high, with a height of 6 meters. (same height as the main building, 6 meters on the 5th floor) and is equipped with 5 separate elevators. The podium will be a boutique specialty hotel, banquet hall and restaurant. It is now in the stage of decoration and design. In addition, the park has built a 14,000 square meters of independent characteristic food style commercial street, which not only meets the owners' business banquet and usual dining, but also solves the problem of staff's usual dining. The project has 446 underground parking lots and 202 parking spaces above ground. With the independent underground parking of the commercial street, the overall parking space of the project is sufficient.
Click to view:HFC (Huifeng Building) details.