Zizhong County is a county-level administrative unit managed by Neijiang City. It is an ancient cultural city with a history of thousands of years and the largest district (county) in Neijiang City.
Zizhong North Station belongs to the third-class station, and the directly affiliated unit is Chengdu Railway Bureau with the zip code of 64 1200. Passenger transport business includes passenger boarding, luggage consignment and parcel storage. It's not open to traffic yet.
20 10 1 1, Zizhong high-speed railway started site survey and was formally constructed. It is an important part of Chengdu-Chongqing intercity high-speed railway, a national key project, and was undertaken by China Railway 16th Bureau Group Co., Ltd.
After nearly two years of construction, Zizhong North Station has been basically completed, some internal facilities are being improved, and related supporting projects such as the square in front of the station and the bus hub station are being stepped up. It is expected to be completed by the end of September this year.
Zizhong North Station is mainly equipped with waiting hall, ticket office, exit hall, toilet, station hall, public security duty room, information signal communication room, power room and functional supporting room. The station building basically adopts symmetrical layout, with the waiting hall in the middle.
The equipment such as the security detector in the waiting hall has been installed and debugged. Go through the lobby, go through the ticket-checking passage, and take the 100 meter escalator to the "air platform".
The waiting hall and ticketing hall are located under the viaduct, with four floors on the first floor. The main building covers an area of 6,000 square meters, which can transport 9 100 passengers per day and118/person per hour during peak hours. Lu Guoqiang, chief engineer of Zizhong North Station Branch of China Railway Construction Engineering Group Co., Ltd., introduced that at present, the affiliated project of Zizhong North Station has been completed 100%. The renovation of the station building has been completed 99%, and the remaining landscape walls and outdoor drop-off platforms are being laid.
Supporting facilities of Zizhong North Station include station square, coach hub, bus hub, commercial building, Yuanyang Lake Park, etc. , with a total area of nearly 124000 square meters. Among them, the square in front of the station is about 38,000 square meters, and there are about 700 planned motor vehicle parking spaces. Long-distance bus hub and bus hub can meet the transfer needs of residents to and from Zizhong city and town. Commercial housing planning includes catering, hotels, special commodity areas, etc. According to the geographical features of the project site, Yuanyang Lake Park is located in a low-lying place on the south side of the square, with a certain terrain elevation difference. According to the existing topographical features, Zizhong North Station has built an integrated space coverage landscape network with the passenger platform of the railway station and the square in front of the station as the main landscape axis, and the transportation hubs symmetrically arranged, extending to Yuanyang Lake Park.