Power outage safety emergency plan (Selected 5)
In the reality of learning, work, life, it is not guaranteed that you will encounter some unexpected events or accidents, in order to minimize the hazards, pre-emptive emergency plan is essential. So have you ever understood the emergency plan? The following is my collection of emergency plans for power outage safety (selected 5), welcome to share.
In order to do a good job in the state of emergency treatment of power outages, to ensure that the normal operation of the school education and teaching work, to ensure that teachers and students in the school learning, work and life in an orderly manner, combined with the actuality of the school, the development of this emergency treatment plan.
First, the power supply system to arrange power outages
1, the school will be in advance of the power outage time to notify the whole school teachers and students.
2, the teaching office to arrange the power outage situation in the time of the work and rest signal.
3, the General Affairs Department in advance to arrange the following work:
(1) the cafeteria in advance to prepare the power outage time meals, to ensure that in the case of power outages in the state of meals supplied to teachers and students;
(2) plumbers and electricians to do a good job of preparation of the power distribution room, to start the power supply when the power supply in a timely manner;
4, the teachers adjusted to the teaching method, turn off the power equipment.
5, electricians ready to power generation equipment, ready for temporary power generation. Evening power outage situation hours, the leadership team members must all be in the school command and patrol the campus.
Second, the power supply system outside the arrangement of the emergency blackout situation state
(a) daytime blackout situation
1, the Office of the Secretary to arrange for blackout situation hours of rest and relaxation signal.
2, the General Affairs Office turned off
3, faculty and staff to turn off the power equipment.
4, the electrician to check the cause of the blackout situation, to the post ready to generate electricity.
(B) night sudden power outage emergency plan
(1) aisle, stairway emergency lights automatically open, electricians and duty personnel to open the school backup lighting appliances.
(2) students must sit in the original seat of the classroom on the evening study, no noise, coaxing or walking. Teachers are responsible for organizing and managing their classes.
(3) such as the end of class, before going to bed, students in the corridor, stairs, toilets, etc., the students should be in place to stand, and so that the eyes of the self has been adapted to the darkness, and then slowly back to the classroom or dormitory, and resolutely to prevent the students at this time to run, chasing, pushing and shoving.
(4) Organization of the relevant personnel to identify the causes of the power outage, and take corresponding measures. Electricians do a good job of overhauling the power supply equipment and generating electricity in a timely manner.
(5) If the power outage situation 20 minutes after the failure to restore normal power supply, then the evening self-study is suspended, the duty group to use the campus temporary broadcasting system to send out evacuation signals, faculty and staff members were to control the building, the stairway, the main channel, and to organize the orderly evacuation of students. Teachers on duty are responsible for directing students to evacuate and leave the school in the order of first floor, second floor, third floor and fourth floor. The teacher on duty turned off the power of the classroom.
(6) before the evening study hall students did not leave school, the school's administrative operations as usual.
2
1, in the case of a power outage notice, the management and operation of the Department should be in advance of the power lines, areas, time, elevator use and safety precautions required to notify each resident and business, and in the main entrances and exits of the power outage notices; at the same time, the Ministry of Engineering and Materials should be a good job of power outages before the strain.
2, in the absence of any notice, a sudden power outage, the Ministry of Engineering and Materials should immediately confirm that the internal failure of power outages or external power outages. If the internal failure of the power outage, should be immediately sent to find the cause of measures to prevent the expansion of the fault; if the external power outage, on the one hand, to prevent the sudden call to cause accidents, on the one hand, call the Power Authority to inquire about the status of the power outage, to understand when the power supply is resumed, and will be aware of the status of notification of the Ministry of Management and Operations.
3, the Security Department immediately together with the Ministry of Engineering and Materials to send people to each building to check the operation of the elevator, found that the elevator shut down immediately in accordance with the elevator trapped in the emergency plan to rescue.
4, the management of the Department of Operations immediately notify the power outage situation in the district residents and merchants, and in the main entrances and exits of the power outage notice, if necessary, to enable the emergency broadcasting system to notify the residents, and require residents to continue to calm down, take precautions.
5, if a sudden power outage, when the mall is open at night, the security department should help the mall to maintain order, and guide the commercial tenants to enable emergency lighting, candles and other backup lighting, evacuation of customers, and to pay attention to fire prevention to prevent fires.
6, the arrangement of staff to the community's main entrances and exits, elevator hall to maintain order, security to strengthen security measures, to prevent people from creating chaos, fish in troubled waters, turn off the door if necessary.
7, assigned to guard the office, duty room, patiently receive residents and business inquiries, do a good job of explaining and guiding the work, to prevent conflict with the residents and businessmen.
8, detailed records of the beginning and end of the accident, the cause of the incident, the response and the damage caused.
Preventive measures for sudden power outages:
1, the Ministry of Engineering and Materials should always check the emergency lighting and emergency broadcasting system to ensure that it is normal.
2, the Department of Management and Operations should remind the office building tenants, commercial tenants have some emergency lighting or candles, in case of power outages.
3, the Security Department, the Ministry of Engineering and Materials in addition to the configuration of patrol, maintenance of flashlights, should also be configured with portable emergency lighting, and when charging maintenance, continue to be intact.
Power outage safety emergency plan 3 First, the guiding ideology: The supply of water and electricity is the Ministry of Accommodation for the students to provide the normal life and activities of the security. In order to prevent the sudden water and power outages, to ensure that the Department of Accommodation in the case of water and power outages can take timely and effective . Emergency measures, to face the water and power outages, so that the Department of Accommodation normal, orderly work. Second, the emergency organization: by the principal, the director of the political education department, the director of the accommodation department, life teacher composition Third, emergency measures: (a) predictable water and power outages 1, the daytime blackout, does not affect the students to use, after the power delivery. The use of students, after the delivery of electricity in a timely manner to check each floor lighting electricity back to normal, found that the problem is timely excluded. 2, evening blackout, the usual ready emergency flashlight full of electricity, organized by the teachers on the evening study students escorted back to the accommodation department in an orderly manner, and then sent to the dormitory by the living teacher, into the dormitory, the students are not allowed to go downstairs after going out. 3, in the power outage before the boiling water, remind the students to their respective water bottles full of boiling water, do a good job in preparation for the water outage with a basin to store water. 4, life teacher will solar water tanks full of water, evening wash water from the manual solar system water supply. 5, strengthen the personnel patrol, to eliminate any form of open fire (B) sudden water and power outages 1, to the competent leadership to understand the situation and then explain the situation to the students, publicize the saving of water. 2, the use of solar energy system to provide students with washing water at regular intervals 3, water outage for more than 24 hours, the purchase of large bottles of pure water will be distributed to students to drink in quantities 4, water outage for more than 36 hours, will be contacted to request assistance from the fire department, however, to provide students with a daily supply of drinking water 5, the accommodation department of the terrain is high, the daily water supply must be pressurized pump work to ensure normal student water, therefore, when informed of the power outage notice must be ready to stop the water 6, evening self-study before the power outage, the students will rest in the residential department, increase part of the teachers to strengthen the management of each floor a remote emergency lights 7, evening self-study during the power outage, in order to determine the longer period of time when the outage, in the duty leader of the command, the students by the current classroom Teachers escorted by the class, safe and orderly return to the Department of accommodation, by the living teacher to arrange for students to return to the dormitory. 8, the students went to bed when the power outage, the emergency lights in the hallway automatically start, strengthen the personnel patrol. 1, purpose In response to the plant sudden power outage, rapid and orderly organization and recovery of power supply and production, to ensure the safety of life and reduce the loss of equipment and property, according to the relevant laws and regulations of the state, combined with the actual situation of the plant, the development of this plan. 2, the scope of application The whole plant production units 3, the responsibility To do a good job of the daily safety of the power supply, the implementation of the responsibility system of production safety, to prevent the occurrence of accidents and power outages, the occurrence of power outages, power outages in time to do a good job of emergency response, and restore power supply as soon as possible. The power supply will be restored as soon as possible. 4, emergency procedures 4.1 Planned power outage emergency procedures 4.1.1 scheduling duty personnel in the received the main call notification of power outages by phone or other forms of power outage notification, you must ask the time of the power outage, stop for how long and the reason for the power outage, make a good record, such as not in the shift, should be handed over clearly during the handover. If not in this shift, should be in the shift handover clear, and to the higher leadership and the workshop responsible for the report. 4.1.2, each department received a notice of power outage, according to the power outage plan formulated by the department, do a good job of power outage, cut power work. 4.1.3, after the power outage, in the shortest possible time, according to the generator safety operating procedures and stopping and feeding reverse operating procedures for power outage and feeding operation. 4.2, accidental power outage emergency procedures 4.2.1 in case of sudden power outage, first of all, should be identified as high and low voltage switch tripped, or utility power outage, such as switch tripped, then identify the causes, troubleshooting and resumption of power supply, such as utility power outage, according to the emergency procedures for accidental power outage implementation. 4.2.2, utility power supply lines outside the accident caused by blackout, this blackout is divided into a large area of blackout can not be restored and instantaneous flash two. 4.2.3, the scheduling duty personnel found that the power outage should be the first time to ask the general regulator the reason for the power outage, and promptly notify the person in charge of each workshop and the relevant duty positions. 4.2.4, after identifying the cause to immediately take measures to determine the treatment plan. 4.2.4.1, serious accidents and power outages can not be immediately restored to immediately according to the planned blackout emergency plan. 4.2.4.2, instantaneous flash blackout is due to a small failure did not form a trip caused by instantaneous loss of voltage, this blackout according to the normal blackout, power inversion operating procedures for the restoration of power supply. 4.2.4.3 power delivery is completed to telephone inquiries about the cause of the flash fault, to understand the details of the duty record on the record handover. First, emergency self-generation When the external power supply is suddenly interrupted, the Ministry of Engineering (or the Power Department) should urgently start (full-automatic) the emergency diesel generator set that has been in a state of readiness beforehand, and send the power into the low-voltage distribution system within 15 seconds. First of all, it should meet the demand for the use of guaranteed power (or accidental power) section. The scope of power supply includes: Guest room corridor lighting; guest room area of the channel lighting; The safety exits, evacuation staircase lighting; public **** part of the regional channel lighting; Important business places (reception, business center, catering booking, etc.) lighting; Important conference halls of the performance venues with electricity; The important machine room lighting (such as distribution). Important room lighting (such as power distribution room, security monitoring center, fire monitoring center, computer room, broadcasting room, telephone room, etc.); Important electromechanical equipment (such as power generation, power distribution system charging equipment, security monitoring equipment, fire alarm equipment, telephone program-control switches, computer mainframes, broadcasting mainframes, fire elevators, underground submersible sewage pumps, etc.). When the emergency generator load margin is large (reserved for fire pump power), discretionary restoration of part of the passenger elevator power supply. Gradually liberalize the use of various regional air supply and exhaust system equipment. When the load of the generator to the rated value of 80%, that is, can not add load. Leave a certain margin to ease the fluctuation of electricity load (e.g., elevator startup). When the self-generation situation is stable, understand the reasons for the interruption of external power supply in time to be able to restore. The hotel has a second municipal power supply, you can consider switching to the second power supply, but in advance, you should get in touch with the power supply scheduling department to obtain consent before switching to the power supply. Only one way of municipal power supply hotel, it should be self-generated, adhere to the municipal power recovery, can be converted to normal electricity. Second, the duties of each post 1. Engineering Department: the duty manager (the highest position), should be as soon as possible to arrive at the distribution room, to assist in the scheduling of electricity. The total scheduling power in the duty electrician, according to the generator operating conditions, in order to ensure the safety of power generation equipment under the premise of distribution of electricity. Other managers of each machine room should return to the machine room as soon as possible to monitor and cooperate with the equipment in the machine room for power conversion. 2. Security Department: The security officer on duty (or perhaps the supervisor), should arrive at the security monitoring center as soon as possible, to observe the operation of the monitoring equipment. Whether the equipment is affected by the conversion of electricity, the hotel's main entrances and exits (security exits) how the situation is, the automatic fire alarm system operation, whether the need for technical support of the Ministry of Engineering, or the deployment of security guards to strengthen the security of certain areas. After the power is restored to normal, the hotel will return to normal operation.