Current location - Recipe Complete Network - Catering industry - March 5 work available at DCH site
March 5 work available at DCH site
There is.

Early March to late April is the peak of the construction site to start resumption of work, but also a construction site epidemic prevention and control of the critical period, the city's housing and construction system as well as the relevant industries need to plan ahead and do a good job of resumption of work to return to work epidemic prevention and control of personnel.

The epidemic period as little as possible contact with wild animals, birds and their feces, but also as little as possible to go to the seafood market, live poultry market or farms, if you have to go, be sure to do the appropriate protective measures. At the same time go out and return to be sure to use soap or hand sanitizer hand wash, to reduce the possibility of contact with pathogens.