What is the basic process of hotel decoration and what are the main points of hotel decoration?
First, because hotel decoration is a big project, it is not easy to determine the hotel design scheme and construction project. Therefore, it is necessary to conduct a detailed interview with the decoration company in order to determine the construction drawings and main samples, and confirm whether they are the drawings required by the owner in the middle of design, and at the same time understand the detailed design scheme of each project of hotel decoration and the materials and specifications of the early decoration materials.

Second, first of all, excellent managers and daily management teams need to be selected on site, and the post responsibility areas of personnel must be clear. Secondly, there are enough decoration workers, including people in different positions such as water, electricity, bricklayer, wallpaper worker, coolie and security guard, and they need to try their best to meet the decoration project of the whole hotel. In addition, to be equipped with good construction tools. Generally, the construction tools for hotel decoration are used by decoration companies.

Three, because the hotel decoration project has two different classifications: the guest room part and the public part, the difficulty, material supply and the sequence of construction personnel entering the site are considered according to its characteristics. In order to shorten the construction period of the whole project, reduce logistics and labor, and complete the decoration project with high quality and efficiency. Therefore, it is necessary for managers and professional foremen to unify their thinking and coordinate their pace. The general construction process is from top to bottom (that is, after the flowers fall to the ground, the wall falls to the ground), and the pipes are first followed by sanitary ware, lamps and furniture, which need to be processed centrally in different places.

4. Foundation decoration includes four projects: hydropower project, carpentry, bricklayer and oilman, among which hydropower project is the main stage in the whole hotel decoration project. As a hidden project in the whole hotel decoration, the owner must supervise whether the construction personnel strictly follow the construction drawings. Secondly, the woodworking stage, because the hotel decoration project is large, the woodworking project should be carried out in layers and rooms, and at the same time, it can ensure the normal completion of the project. The bricklayer and oiler stage is also the foundation construction stage. After the carpentry is finished, the bricklayer can enter the field, and then the painter stage.