decoration sequence:
(1) main body modification →(2) hydropower modification →(3) pipeline wrapping →(4) bricklaying →(5) carpentry (pass, etc.) →(6) oil painting →(7) wall painting or wallpaper pasting →(8) socket panel installation →(9) kitchen and bathroom ceiling. Window rails →(14) floor →(15) land reclamation and cleaning →(16) furniture and household appliances →(17) curtains and bedding
Detailed steps:
Tools are in place and ready
1. Before renovation, several things that must be prepared should be put in the bag. Tape measure (buy 5m, not 3m), calculator, big board clamp (for clamping bills and receipts); In addition, it is best to prepare old towels (soft cotton ones, which are used to wipe bricks after sticking them) and plastic bags (wrapped around the pipe joints) in advance at the construction site to prevent dirt from blocking.
2. Choose an auspicious day and start shooting.
Before the workers enter the site, it is best to personally measure the corners of the house, take a pencil ruler and mark them clearly. Be sure not to be lazy. Clear the area involved in the decoration process. Especially the tile area, wall paint area, wallpaper area and floor area; Identify the main wall dimensions. In particular, it is necessary to design the wall size of furniture in the future.
3. Demolition and renovation of the main body to make the space more practical
Demolition and renovation of the main body is the first project, mainly including wall demolition, wall building, wall peeling, heating (north) demolition, plastic steel windows replacement and so on. The demolished garbage should be cleared out in time to ensure indoor cleanliness, and it is also for the convenience of construction. At this point, it's time to set the finished door. At this time, it is best to browse the cabinets, range hoods, stoves and water heaters and try to determine them.
4. hydropower transformation, arrange the use of each space
hydropower transformation, there is no regret medicine to eat. Brick on the wall, ceiling sealed, and then want to add a socket can be difficult. Therefore, we must determine the exact location of switches, lamps, basins, bathtubs, washing machines and so on. Before the hydropower transformation, the cabinet designer should make the first measurement at home to help you determine the transformation scheme of power supply and waterway. Water heater, it is also best to send someone to design the position of power supply and water interface according to the model you have determined. Reminder: On the wall below the basin, it is best to leave a power socket to facilitate the installation of kitchen treasures. The air conditioning hole and power supply should be placed on the wall of the bedside as far as possible to avoid air conditioning blowing directly at people in the future.
keep a distance of 21cm between strong current and weak point, for example, leave a distance of 21cm between socket and network cable.
5. Wrap the riser and wrap the ugly pipes
Considering the damp and damp environment in the kitchen and bathroom, wooden keel must not be used as the material for the riser! Be careful, even if the wooden keel is painted with anticorrosive paint. Remember, the light steel keel or red brick is used for the riser. Light steel keel saves space, but the most solid and easy to use is red brick. At this time, you need to buy tiles, jointing agents, etc. Furniture should be set in advance, and the construction period should be kept well, at least about 1.5 days, and generally a month is better. By the way, don't wrap the pipeline where there is a manhole, in case of water seepage, the reason can't be found.
6. Tiling, the first thing with solid texture
Before tiling, buy a floor drain. Note: the floor drain should be bought at the local supermarket. Buy a special washing machine or floor drain for shower, and it should have deodorant function. After waterproofing and napping, we are ready to stick bricks. Normal tiles should be soaked in water and dried in the shade before pasting; Broken tiles are left for cutting. Please leave plenty before buying bricks. At this time, the basin and faucet should be determined, and the cabinet designer should be invited to visit for the second time. At the same time, buy paint (mixed or clear), wall paint, nitrocellulose paint, diluted water, etc., such as wallpaper, you must also decide first.
7. The painter goes into battle, and brushes the wall.
There is nothing to say. The effect of leveling, grinding and rolling depends absolutely on the skill of your painter. Good adhesion of primer can make the wall smoother, make the top coat easier to brush, and reduce the use of top coat. Moreover, the excellent sealing property of the primer can effectively resist the penetration of alkaline substances in the wall, prevent the precipitation of water-soluble salts and prevent the wall from returning to alkali.
Reminder: If you want to paint the wall, you must pay attention to the color matching. The transferred color is lighter than the color card, and it must not be the same as or darker than the color card, otherwise you will regret it. Because when you paint the wall at least twice, and some even three times, the color of the upper wall will get darker and darker. Different people have different opinions on whether the painting method is spraying or roller coating. It is said that the spraying effect is better, but once it is damaged, it will become extremely difficult to touch up the paint. If you don't buy a finished door, let the worker master do it. Note: Any carpentry work, even if it's just a pass, must follow this step, the big core board sinks to the bottom, and the veneer is covered before painting. When mixing oil, it is absolutely wrong to brush oil directly on the big core plate. Don't believe the nonsense of selling large core boards. It's no problem to brush oil directly on them. Remember, brush the oil directly, and before long, it will all crack, remember to remember. Now, you don't have to brush the mixed oil, but you use spray. It's best for workers to spray the inside of the door and the meter box with white, which is beautiful without waste.
8. Wallpaper, a beautiful wall
After the wall paint is painted, the oil workers' union will brush nitrocellulose paint where the wallpaper needs to be pasted, and the paint will dry completely the next day, and then you can ask the master to paste the wallpaper. At first, I was worried that pasting wallpaper would make the painted white wall dirty, but later I realized that pasting wallpaper was really a very clean job! Worry is completely unnecessary. Note: Do not open the window for ventilation within 48 hours after wallpaper is pasted, and let it dry slowly in the shade. Tell the master that if some places are stuck, you should ask him to help fix them. At this time, it is time to buy panels, sockets and lamps.
9. Install the socket panel
The socket panel can be installed in about half a day.
1) It is best to buy sockets with switch function, especially in the kitchen, so that rice cookers and microwave ovens can be controlled by switches without plugging and unplugging the power supply.
2) The socket with switch is good, but it should be practical.
It is observed that all three sockets of a five-hole power supply with a switch are flat. Once your electrical appliance needs three round sockets, there will be a depressing situation in which the socket is empty and the plug board is used. Therefore, multi-purpose sockets must also be used, even if it has no switch control! At this time, you should buy the ceiling used in the bathroom and kitchen. At this time, if you need to install the Yuba, please buy and install
11. The kitchen and bathroom ceiling, and seal the last ugly part.
Install the water heater and Yuba first. After installation, the ceiling can be sealed to better half-wrap the water heater, that is, connect it more beautifully. It is best to buy aluminum gusset ceiling, even if it is removed after many years, it is worth a lot of money to sell waste aluminum.
on the other hand, pvc gusset plates look good, but the quality and performance are just so-so, and plastic things are not worth much even if they are sold as waste products. When buying a gusset plate, ask the price of the whole package, and don't buy the gusset plate and the corners separately. But the installation fee is extra.
11. Install the cupboard, and a beautiful whole kitchen will be born.
The cupboard is a coordinated project, and the range hood, cooker and sink should be arranged in advance. It is best to deliver it on the same day and install it together with the cabinet. Tell the cabinet factory in advance to bring the artificial stone countertops with the kitchen range and sink cut off. So much money can't be given to the manufacturer for nothing. It is very useful to pack a water meter and pipes.
12. Install the finished door
The finished door should be installed before the floor, mainly because the door installation steps are complicated, such as hinges, door locks, door suction, door frames, etc., and many tools are used. If the floor is installed first, it is difficult to avoid bumps.
13. It is suggested that before installing the floor, the items with scattered ash should be settled one by one.
14. Install the floor
Before installing the floor, it must be leveled. I saw that many neighbors' floors were useless for leveling, so I was careless. Unexpectedly, after the floor was paved, the aisle was flat and very depressed. I had to take it down, take it with quick powder, level it and resurface it. Prepare a little pepper in advance, don't buy the so-called insecticidal powder brought by the floor workers, just let them sprinkle it along the kick angle. Workers must not cut the floor in the house, cut it in the corridor, and finally clean the corridor.
15. Land reclamation and cleaning
I think the biggest embodiment of cleaning is cleaning the glass. It is a frightening thing to climb outside to clean such a high building. Secondly, floor waxing, you have to buy your own wax, which is cheap and easy to use, but you must use a cleaning waxing machine, which is dozens or hundreds of times faster than manual work.
For the rest, they don't need to rely too much on cleaning. They just scrape here and there with a small blade, which is not so clever. Therefore, after cleaning, it is best to do a detailed cleaning yourself. Go to the supermarket to buy a bag of "Wujie Powder" and get some old towels. Wipe the old towel with dry five-clean powder, from pass to door, from tile to kick corner, from house to house. Don't be lazy. The result will definitely make you proud.
16. Furniture and household appliances enter the market
In a brand-new home, furniture bears the brunt. Bed, mattress, wardrobe, shoe cabinet, sofa, dining table and so on.
before the furniture enters the site, the following items should be prepared: disposable shoe covers (don't buy poor quality ones, they will break when you step on them), several boxes of activated carbon, ladders, and floor protective film (it is best to protect the floor for carrying wardrobes and TV cabinets). If you buy a cloth bed, see if all the cloth can be taken off. Home appliances should be delivered quickly, and it is ok to wait until the money is tight or not in a hurry. Anyway, electrical appliances are getting more and more advanced and cheaper.
17. Accessories decorate the house, and the home will have a taste.
With decorative paintings and beautiful curtains, the gentle taste of the home will come out. Don't spend too much money on accessories for curtains. Curtains and lead pendants are necessary, but lace, cloth buttons and tassels, which cost eight yuan and ten yuan, cost twenty or thirty yuan more per meter, which is unnecessary and not beautiful.