estimated area of the kitchen (㎡) 30 (including the kitchen area, the cashier area, dry goods room, manager room, staff lounge, garbage room). Estimated seating capacity (㎡) 60 Depends on the area and layout of the dining area.
Project amount description:
Equipment amount 220,000 (including kitchen equipment, stainless steel equipment, miscellaneous equipment, computer software fees, front desk POS machine and computer purchase and installation. (Equipment investment will be adjusted according to the actual operational needs).
Decoration amount: 150,000 (including design fees, ceiling, floor, wall, smoke, drainage, water and electricity installation, lighting, menu light photos, price list, air conditioning, tables and chairs, surveillance, fire systems, sound systems and other renovation (excluding the increase in the cost of the appearance of the structure and staircase remodeling). (Signboard production and installation).
Start-up costs: 20,000 (including pre-opening personnel training costs, travel expenses, license fees, utilities, communication costs, pre-opening, rent, and other miscellaneous expenses. In addition, depending on the demand for the preparation of the opening of a wide range of promotional costs, with the grand opening costs are calculated separately. (Due to regional differences, the restaurant lease contract is different, to the actual costs shall prevail)
The first phase of the store rent: 45,000 (estimated monthly rent = 15,000 yuan; estimated first phase of the store rent = three months rent.) Depends on the actual lease conditions.)
The first batch of raw materials: 30,000 (Estimated first batch of raw materials for the monthly turnover × 40% × 0.5 months; subject to the location of the store, the actual price of raw materials ordered.)
Publicity costs: 30,000 (dishes light film production, opening flyers, ribbon cutting, opening baskets, etc.)
Restaurant reserve: 12,000 (safe 10,000, two cash registers 2,000)
Miscellaneous expenses: 20,000 (various types of documents costs)
Total: 527,000
Total reserve 550,000 Including the total amount of investment, the first phase of the store Rent, the first batch of raw materials of the total amount of preparation.