Demolition of abandoned hotels
Demolition of abandoned hotels requires environmental assessment, demolition scheme design, safety measures and material recovery. The following is the specific demolition process. Environmental assessment: It is necessary to investigate and evaluate the surrounding environment of the demolition site, including air, water and soil pollution, to ensure that the demolition will not cause too much impact on the environment.

1. Demolition scheme design: The demolition scheme needs to be designed according to industry norms. On the premise of determining the demolition time limit, demolition method and demolition sequence, the influence of noise and vibration on surrounding buildings and environment should be reduced as much as possible.

2. Safety measures: In the process of demolition, a series of safety measures need to be taken, such as strengthening surrounding buildings, setting up protective nets and setting up control areas. To ensure the safety of personnel, vehicles and equipment during the demolition process.

3. Material recycling: In the process of demolition, waste materials, such as steel, glass, wood, etc. It needs to be classified and recycled to contribute to the development of environmental protection.