Machine room: diesel engine, generator, frequency conversion machine room, compressor, gas cylinder, etc.
Drill floor: winch, rotary table, pneumatic winch, B-clamp, hydraulic disc brake station, hydraulic clamp, machine drilling room and various instruments.
Mud tank farm: storage tank, agitator, vibrating screen, desander, weighting pump, shearing pump, liquid level gauge, sand pump, etc.
Pump house: mainly mud pump and ground manifold.
In addition, there are well control equipment, downhole tools and drilling tools. If there are too many things, you can list them. You can search online.
As for the fastest and best time to finish drilling, hehe, it's hard to say. Generally speaking, as long as the underground accident is not complicated, it is generally possible. In addition, choose good tools. As for the choice of tools, except the drill bit, the company will match it according to the situation, and the drilling team can use it, because the choice of tools is related to the cost. Like abroad, it will benefit a lot, and the time may be twice that of domestic use. Finally, learn more about the situation of neighboring wells and see how others do it. They are psychologically confident. In this case, it is generally not slow.