Current location - Recipe Complete Network - Catering industry - When will the opening of Wanrong Road and Pushan Road in Sanquan Road start?
When will the opening of Wanrong Road and Pushan Road in Sanquan Road start?
Dongfang. com February 2 news. Com: In order to alleviate the congestion of the north-south elevated roads and new roads, Zhabei District is preparing to build a second north-south passage. Recently, the reporter learned that the renovation project of Pushan Road-Wanrong Road-Sanquan Road (Phase I) has entered the stage of EIA publicity.

Due to historical reasons, two railway stations (Shanghai Station and Beijiao Station) and two parks (Zhabei Park and Daning Lingshi Park) in Zhabei District horizontally separate the north and south of Zhabei District, which reduces the traffic efficiency of roads.

At present, there are only * * and Xin Road running through the whole area, Huangpu District south of Suzhou River in Nantong, Baoshan District in the north, and the city's north-south traffic trunk roads. It is very busy. There is a north-south viaduct running through the city on the upper floor and a subway 1 line on the middle floor. The lower floor should not only accept the vehicles coming down from the elevated road, but also bear the vehicles coming from the inner ring road and the central ring road. Most north-south buses in this area are on this road.

The EIA report shows that the renovation project of Pushan Road-Wanrong Road-Sanquan Road starts from the intersection of Pushan Road-Zhongshan North Road in the south and ends at the intersection of Sanquan Road-Zhongchang Road in the north, with a total length of about 5.5 kilometers. The first phase of the renovation project of Pushan Road-Wanrong Road-Sanquan Road starts from the intersection of Pushan Road-Yanchang Road in the south and ends at the intersection of Sanquan Road-Zhongchang Road in the north, with a total length of about 4.3 kilometers.

The project includes road engineering, tunnel engineering, pipeline engineering, and ancillary works such as lighting, greening and traffic sign lines. Wanrong Road-Sanquan Road runs, and the width of road red line is 32-40m. According to the layout of two-way four-speed and two-slow sections, the tunnel is arranged at the intersection of Lingshi Park in Daning and Zoumatang-Nanhe railway branch line.

After the renovation of Pushan Road-Wanrong Road-Sanquan Road is completed, it will reach Shanghai Station in the south and Baoshan in the north, which can not only form a parallel shunt road on the west side of Hexin Road to improve the travel conditions along the line, but also add an evacuation passage in the North Square of Shanghai Station to promote the renovation of the old areas along the line.

Reference: EIA Publicity/DOCS/2014/20140820589.htm.