Current location - Recipe Complete Network - Catering industry - 55 square meters store floor height of six meters, with what structure to change into two floors good, how much does it cost
55 square meters store floor height of six meters, with what structure to change into two floors good, how much does it cost
All business premises need to be filed to the local fire department before opening, apply for acceptance (commonly known as reporting fire).

The specific process is: to the fire department → record → review map → acceptance → pre-opening inspection → get fire certificate.

You mentioned the cost of public relations is not ah (may be the cost of gifts to put, this is not easy to say. Oh...) I don't know...!

But to the fire department to declare to find the appropriate qualifications, this will need to send money. *** counting four units of qualification: including 1. fire design qualification. 2. fire construction qualification. 3. interior design qualification. 4. interior construction qualification; (These you only need to send some money can be done, but it is recommended to find a professional design unit design, if the design is unqualified, the fire department may be penalized: the range of penalties is from ten thousand to one hundred thousand yuan, the penalty is: design units, construction units, Construction unit (refers to the investor))

You have other materials to prepare: a lot of it!

Preliminary pre-declaration of the materials you need to prepare: a copy of your ID card, the original building fire audit book (refers to the declaration of the civil construction of the fire (primary fire), you declare the fire belongs to the secondary fire.) Business name approval notice, purchase contract (real estate license). All of the above are copies.

Later declaration of the need for you to prepare the materials: decorative materials type inspection report, audit opinion (pre-fire brigade will give you after the end of the review stage), material sampling test report (you will get at the same time with the audit opinion, I do not know which place you are. Jiangsu are sent to the Nanjing Testing Center test: address 119 Xuanwu Lake Avenue, Nanjing) (sampling material samples from the construction unit to buy, sent to the fire department sealing (that is, paste the seal)).