1. If a store needs to install and use natural gas, it shall submit a written application (including store name, kitchen facilities, number of gas heads, etc.). ) reported to the operation department for approval.
2. With the approval of the engineering department, the engineering department is responsible for contacting the natural gas company and installing and debugging equipment at the designated place until it can be used normally. Equipment includes cookers, meters, valves, natural gas alarm devices, etc. Among them, stoves and hoses must be qualified products with flameout protection devices; The natural gas alarm device must be linked with the fire control room. Otherwise, it shall not be used.
3. According to the size of the natural gas meter approved by the natural gas company, the merchant shall pay the deposit of the corresponding fee; After the expiration of the business period, if the natural gas meter is not damaged, the deposit will be returned without interest.
Generally speaking, when a shop applies for natural gas, if it is pipeline installation, there are connection points near the shop. If gas tanks are used, they must meet the fire protection requirements. In a word, stores must pass the fire inspection when using natural gas.
Legal basis:
Regulations on the Administration of Town Gas
Article 27
Gas users shall abide by the rules for safe use of gas, use qualified gas burning appliances and gas cylinders, promptly replace gas burning appliances and connecting pipes that have been explicitly eliminated by the state or whose service life has expired, and pay gas fees within the agreed time limit. Unit gas users should also establish and improve the safety management system, and strengthen the training of gas safety knowledge and operation skills for operation and maintenance personnel.
Twenty-ninth session
Gas users have the right to inquire about gas charges, services and other matters from gas operators, and gas operators shall give a reply within 5 working days from the date of receiving the inquiry application. Gas users have the right to complain about gas charges, services and other matters to the price departments, gas management departments and other relevant departments of the local people's governments at or above the county level, and the relevant departments shall deal with them within 15 working days from the date of receiving the complaint.
Article 30
The installation, renovation and demolition of indoor gas facilities shall be carried out in accordance with the relevant national engineering construction standards.