Current location - Recipe Complete Network - Catering industry - Tentative ideas on the development of Binhu New District in Hengshui City
Tentative ideas on the development of Binhu New District in Hengshui City

Hengshui binhu new district was formally established. The establishment of this area marks that the scientific protection and effective utilization of Hengshui Lake in this city has entered a substantive stage.

through three to five years' efforts, Binhu New District will embark on a road of sustainable development of "integration of lake and city, harmony between man and nature", and build the new district into a high-standard, high-level and high-quality ecological lake city demonstration area, a tourist resort and a pioneering area for coordinating urban and rural areas.

It is understood that this year, Binhu New District will adhere to the high-standard planning as the guide, supported by ecological leisure culture and modern emerging lakeside industries, and invest 2.5 billion yuan to speed up infrastructure construction and build a "three horizontal and one vertical" road framework. At the same time, we will focus on promoting the construction of 11 key eco-tourism projects and have initial reception capacity during the year. 1. Strengthen the construction of support capacity and build the strategic support for the development of the new district. Deepen the conceptual planning and regulatory detailed planning of the new district, and strive to cover every inch of land. Continue to promote the restoration and protection project of Hengshui Lake wetland, do a good job in regular protection and law enforcement, and promote the provincial legislation of Hengshui Lake wetland.

2. Strengthen the construction of eco-tourism environment and promote the rapid promotion from green to beauty. Do a good job in greening and beautifying key areas and improve the green corridors along the lake. Accelerate the construction of wetland park, lotus boutique garden and rose boutique garden, among which wetland park and lotus boutique garden were opened to the outside world on May 1; At the same time, continue to plant lotus in East Lake, and gradually form a 11,111-mu lotus landscape belt. Pay close attention to solving the problem of expropriation and resettlement of employees' houses in the former Jiheng Farm, and form a centralized contiguous building on the east bank of East Lake.

3. Strengthen infrastructure construction and build the development framework of the new district. Accelerate the construction of "three horizontal and one vertical" backbone roads. In June, the first phase of Hengyi Road was 2.4 kilometers, and the second phase of the project was started during the year, extending 3.6 kilometers eastward to Hengzao Road. In September, the first phase of Zongyi Road is 4 kilometers, and the second phase of the project will be started before the end of the year, extending 5 kilometers south to Hengsan Road. Cooperate with the Municipal Transportation Bureau, do a good job in requisition and demolition of the connecting line project of Hengshui Lake (Henger Road) of Daguang Expressway, and strive to build Yingbin Avenue in the new district. The planning, design, requisition and demolition of Hengsan Road will be completed during the year, and construction will start next year.

4. Strengthen the construction of tourism service facilities and cultivate pillar industries for the development of the new district. The first phase of the main dock of Hengshui Lake was put into use on May 1st, the theme square project was completed in October, and the mission center of the protected area was completed next year, making it a landmark building with Hengshui characteristics and representing the image of Hengshui Lake. The main project of Long Yuan International Peace Hotel was completed in July, and the initial installation, hardcover and peripheral landscape construction were started during the year, and the business preparations were started. The "Eleventh" project of the first phase of the hot spring health city project completed the main project and began to have the reception function. The "Eleventh" main body of the water sports base project under construction was completed. The outlet project integrates shopping, catering, leisure and entertainment, and was completed and opened at the end of the year.

5. Strengthen attracting large businessmen to attract huge sums of money to maintain the strong momentum of the development of the new district. Around the planning of the new district, the overall package investment promotion will be implemented. Focus on promoting investment in key sectors such as cultural parks, convention and exhibition centers, high-end industrial parks in the east, and islands in the lake. Strive to build a theme cultural park and a youth theme entertainment park.

6. Strengthen the construction of traditional characteristic industries, and make them organically integrated with the planning of the new district. Establish two characteristic industrial parks: engineering rubber and medical equipment.

7. Strengthen the work concerning agriculture, countryside and farmers and improve the happiness index of the people in the new area. Guide the development of characteristic economy along the lake, such as agricultural sightseeing, do a good job in social security for farmers in wetlands, and respect the wishes of farmers in the construction of new houses.