Current location - Recipe Complete Network - Catering industry - How to stick the sealing strip of the tender?
How to stick the sealing strip of the tender?
Put a seal on the joint. It is best to cover the seal with a seal, and then stamp the riding seam between the seal and the outer packaging.

1. Seal: The bidder must submit the bid documents in a sealed manner according to the number of copies required in the previous schedule, and affix the seal of the bidder's legal person and the seal of its legal representative or its entrusted agent at the sealed position of the sealed bag.

2. Signs: The bidder shall correctly mark the words "original" or "copy" on the cover of the bidding documents, and all envelopes must indicate the name of the tenderer, the name of the project and the name of the bidder.

3. When submitting the bid documents, the tenderer:

(1) Special CD for xxx project bidding must be submitted at the same time;

(2) Adopt an electronic text format that conforms to the data standard of Intelligent Bid Evaluation System for Construction Bidding of Bill of Quantities of Housing Municipal Infrastructure Projects in xx Province;

(3) Make the original and copy of the CD-ROM containing such data as "total bid price", "total project price table" and "summary table of unit project cost" which reflect the group price and analysis, and submit them together after bagging, sealing and marking.

4. The tenderer has the right to refuse the bid documents that are not prepared, sealed and marked according to the above provisions.

The content of the tender document is 1. Generally speaking, bidding documents include three parts, namely, credit part, business part and technical part.

2. The credit part includes a series of contents such as company qualification and company introduction. , as well as other documents and other related contents required by the tender documents, including company performance, various certificates and reports, etc.

3. The technical part includes project description, design and construction scheme, bill of quantities, staffing, drawings, tables and other technical schemes and other technology-related information.

4. The commercial part includes the description of bid quotation, total bid price, price list of main materials and contract conditions (general and special), etc.