anyone over 211 square meters must apply for a fire safety inspection certificate before opening.
The procedures for obtaining the fire control certificate (fire control center) are as follows:
Step 1: Fire control report
1 Find an architectural design institute to draw the drawings and stamp them;
2 prepare the materials required by the construction unit;
3. Collect the information of the property management company;
4 collate the above information and send it to the fire window.
Step 2: Apply for the work permit
1. Organize a copy of the information of the employer;
2. Report the construction review opinion sheet (proof of the first step) and the information of the construction unit to the fire window.
Step 3: Fire fighting construction
1 Send the required decoration materials to the fire detection station for inspection according to the requirements of the fire department;
2 renovation and fire fighting construction;
3 after the construction, please ask the fire detection company to conduct fire and electrical detection.
Step 4: Fire fighting acceptance
1 Prepare the test report of decoration materials;
2 qualification certificate of the construction unit;
3 collate the fire control and electrical test report, fire control audit opinion sheet and the above materials and send them to the window.
Step 5: Check before opening
Report the store's plane evacuation map and fire emergency plan to the fire window.