Current location - Recipe Complete Network - Catering industry - What materials does Nantong need to decorate the house?
What materials does Nantong need to decorate the house?
What materials do you need to prepare for the decoration? If we are all-inclusive, these materials are prepared for us by the decoration company, and we don't need to prepare them ourselves. If we are half-package, we can only prepare the main materials. If we are packing cleaners, we need to know more about them in case of emergency.

Ok, I will list the specific materials for you now.

Materials needed in the early stage of decoration

Light bricks, red bricks, cement, sand, fiber mesh, garbage bags, sledgehammers, electric hammers, shovels, brooms, faucets and buckets are mainly needed in the early stage of decoration.

In hydropower stage, PVC conduit, conduit straight pipe, conduit clamp, information box, switch box, leakage switch, air switch, electric wire, network cable, cable TV cable, telephone line, electrical tape, socket bottom box, switch, socket, network cable socket, telephone line socket, floor drain, temporary switch, faucet, light bulb, lamp holder, yellow wax tube and telescopic tube need to be prepared.

For water, it is necessary to prepare stop valve, pre-filter, water pipe, water pipe elbow, water pipe tee, water pipe straight-through, inner wire tee, bridge crossing, double elbow, hose, raw material belt, water pipe plug, PVC glue, 50 elbow, 50 trap, 75 to 50 direct, 75 elbow, 75PVC pipe, 50PVC pipe and 65438+. 1 10 to 50 tee, 1 10 trap, 1 10 elbow, 1 10 straight pipe, floor drain, floor heating, central air conditioning.

In the bricklayer's stage, rigid waterproof materials, flexible waterproof materials, bathroom backfill ceramsite, floor tile, wall brick, skirting line, caulking agent, marble, cement, sand, steel bar, tile glue, cooker, light brick, red brick, fiber net, garbage bag, security door, aluminum alloy window, background wall material, bathroom, protective film are solid and firm.

Wood square, wood board, ceiling hardware, gypsum board, cabinet door hinge, edge sealing, paint paste, nail shooting, paint-free board, backboard, side keel, auxiliary keel, 9mm board, large core board, steel row nails, gypsum board screws, nail-free glue, woodworking glue, styrofoam, handle, wire drawing guide rail and expansion screw need to be prepared in the woodworking stage.

In the painter stage, prepare putty powder, plaster line, grid cloth, internal corner strip, external corner strip, white latex, kraft paper, antirust paint, 90 1 glue, plaster line, wood board, gypsum board, latex paint, color powder, color essence, paint brush, paint bucket and protective film.

In the soft-fitting stage, it includes all kinds of furniture, televisions, washing machines, refrigerators, range hoods, exhaust fans, toilet mirrors, wooden floors, wooden doors, bathroom door, lamps, beds, sofas, coffee tables, dishwashers, yuba, clothes hangers, water heaters, curtains, clothes dryers,

This is basically the material. The situation is different, and the materials needed are different. You'd better communicate with the decoration master before deciding which materials to buy, otherwise the materials you bought may not be used, and you have to return them, wasting time and money.

List of decorative materials