Ask for a shop in renovation contract?

renovation contract model house

Entrusting party (Party A):

Undertaking party (Party B):

Project:

After friendly negotiation and negotiation, Party A decides to entrust Party B to decorate the living room. In order to ensure the smooth progress of the project, in accordance with the relevant national laws and regulations, this contract (including its annexes and all supplementary contracts) is hereby signed for

compliance.

Article 1: General situation of the project

1. Project address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2.

2. _ _ _ _ _ _ _ hall, which is _ _ _ _ _ square meters;

3. _ _ _ _ _ _ Kitchen, which is _ _ _ _ _ square meters;

4. Toilet in _ _ _ _ _ _, which is _ _ _ _ _ square meters;

5. _ _ _ _ _ Balcony, which is _ _ _ _ _ square meters;

6. _ _ _ _ _ _ _ _ aisle, with a meter of _ _ _ _ _ _ square meters;

7. Others (specify location) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

total: the construction area is _ _ _ _ _ _ _ _ _ _ square meters.

3. Construction content: See Annex I "Home Decoration Construction Content List" and construction drawing for details.

4. Entrusting method: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

5. Engineering. P>

article 2: project price

project price (in words) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

1. The material payment is _ _ _ _ _ _ _ _ _ _ _; 2, labor costs _ _ _ _ _ _ _ yuan;

3. The design fee is RMB _ _ _ _ _ _ _ _ _; 4, construction freight _ _ _ _ _ _ _ _ yuan;

5. The handling fee is RMB _ _ _ _ _ _ _ _ _; 6. The management fee is _ _ _ _ _ _ _ _ yuan;

7. The tax is (3.41%) _ _ _ _ _ _ _ _ _ yuan;

8. Other expenses (specify contents) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Article 3: Quality Requirements

1. The varieties, specifications and names of the main materials used in the project shall be approved by both parties. For details, please refer to Annex (III) Final Account List of Decoration Engineering Materials for Home

Court of this Contract.

2. The two parties agree to refer to the Shanghai local standard DB31/T31-1999 Standard for Acceptance of Residential Decoration

.

3. During the construction, if Party A has special construction projects or special quality requirements, both parties shall confirm and sign a supplementary contract for the increased expenses.

4. Quality inspection and supervision department: Home Decoration Professional Committee of Shanghai Interior Decoration Industry Association.

5. All materials and equipment purchased by Party A shall be borne by Party A; Party B shall be responsible for the construction quality.

6. If Party A hires a project supervisor by itself, it shall notify Party B before the project starts, so as to facilitate the work connection.

Article 4: Material Supply

1. Party B shall clearly mark all materials used in this contract in strict accordance with the relevant national price regulations.

For details, please refer to Appendix (II) Budget Table for Home Decoration Engineering Materials. The materials provided by Party A shall be used for the decoration works specified in this Contract, and shall not be used for other purposes without the consent of Party A.. If Party B uses it for other purposes, it shall compensate Party A for the double price of the misappropriated materials.

2. If the materials and equipment provided by Party B do not meet the quality requirements or have different specifications, they shall not be used. If

has been used, all losses caused to the project shall be borne by Party B..

3. For details of the materials and equipment that Party A is responsible for purchasing and supplying, please refer to Appendix (IV) of this contract, which is the List of Decoration Materials Provided by Party A. They should be qualified products that meet the design requirements and should be supplied to the site on time. In case of delayed arrival,

the construction period will be postponed, and penalties will be imposed according to the delayed construction period. Pay

11% of the total amount of materials provided by Party A as the management fee to Party B.. After the materials are accepted by Party B, Party B shall be responsible for keeping them, and Party B shall be responsible for

compensation for losses caused by improper keeping.

Article 5: Payment Method

1. Once the contract is signed, Party A shall pay 1.111% of the engineering materials and 51% of the construction cost; When the progress of the construction period is over half (year, month and day), Party A will pay 41% of the construction cost for the second time. The remaining 11% shall be paid to Party A for settlement after the project is completed

. (Note: construction costs include labor costs)

For details, Party A shall pay off the project price in Appendix VII of this contract, and Party B shall issue

a unified invoice, hand over and issue a decoration project warranty card to Party A, for details, see Appendix VIII of this contract, Family Decoration Project Quality Warranty.

Party A's failure to pay on the due date is a breach of contract, and Party B has the right to stop the construction. If the project price is not settled after acceptance

, it shall not be delivered for use.

2. If there are any additions or deletions or changes in the project construction, please refer to Appendix (V) Project Change Form of Home Decoration Project

of this contract for details. Both parties shall sign a supplementary contract, and Party B shall be responsible for issuing a construction change order to inform the person in charge of the construction site

. Increase or decrease the price of the project and settle it on the spot.

3. If Party A fails to pay the project price in advance within the time limit stipulated in this contract, it shall pay 1% of the unpaid project price to Party B for each overdue day.

4. If Party A mortgages to the bank in the decoration of the living room, it must hand over the mortgage voucher and relevant documents (copies) to Party B

.

Article 6: Project Duration

1. If the completion is delayed due to Party B's reasons, Party A shall be paid a penalty of 1% of the work fee every day until the work fee is deducted. If the completion is delayed due to Party A's reasons, Party B shall be paid RMB

1% of the labor cost in the decoration project price for each day of delay.

2. If the unqualified materials and equipment selected by Party A affect the project quality and construction period, Party A shall bear the rework cost. If there is a quality accident due to Party B's construction, Party B shall bear the rework cost, and the construction period will remain unchanged.

3. In the course of construction, if work stops due to engineering quality problems and disagreement between the two parties, it will not be regarded as delayed work or delayed construction period.

Both parties should take the initiative to ask the relevant departments for mediation or arbitration to coordinate and handle the dispute as soon as possible, so as to continue the construction.

4. If rework is required due to Party A's reasons, or the construction period is delayed due to Party A's changes in construction contents, a visa is required, and Party A shall bear all the construction costs. If rework is caused due to Party B's reasons, Party B shall bear the responsibility, and the construction period will remain unchanged.

5. During the construction, Party A will inform the construction personnel to change the construction content without Party B's consent, which will cause quality problems and delay the construction period, and Party A will be responsible for it.

Article 7: Project Acceptance

1. For the project quality acceptance, please refer to Appendix (VI) Quality Acceptance Form of Home Decoration Project. Except for concealed works, which need to be accepted by sections, Party B will organize Party A to carry out the completion acceptance after all the projects are completed. Both parties shall go through the project settlement

and handover procedures.

2. After Party B notifies Party A of the process acceptance and completion acceptance, Party A shall come to accept it within three days. If it fails to do so, it shall be deemed that Party A will automatically give up its rights and be deemed as qualified. If there are any problems, Party A shall bear its own responsibilities. Party a moves in by itself, and

is deemed as qualified.

3. If Party A cannot come for inspection within the time limit specified by Party B, it shall notify Party B in time and set a new date. However, Party A shall

recognize the completion date of the working procedure or project, and bear Party B's custody fee and related expenses.

Article 8: Other matters

1. Party A

1. Party A must provide the house plan and water, electricity and gas circuit diagram approved by the property management department, or Party A shall provide the house plan and water, electricity and gas circuit diagram for Party B, and make on-site disclosure.

2. For the second decoration project, all or part of the house should be vacated, and obstacles affecting the construction should be removed. Necessary protective measures shall be taken for the furniture and furnishings stranded in the house that can only be partially vacated, and Party B shall

handle the formalities and bear the expenses.

3. If it is really necessary to demolish or change the original building structure or equipment and pipelines, you should handle the renewal with the local housing management department and bear the relevant expenses. If you need to use public parts temporarily during construction, you should say hello to the neighborhood.

2. Party B

1. Party B shall show its business license, membership certificate or construction qualification on its own initiative; If it is a subordinate branch, it must also have a certificate issued by the superior

company; The handling salesman must have the entrustment certificate of the legal representative.

2. Assign (name) _ _ _ _ _ _ _ _ as the site representative of Party B, be responsible for the performance of the contract, organize the construction according to the contract requirements, and complete the construction task on time with good quality and quantity.

3. Be responsible for the safety of the construction site, guard against fire, work with certificates and civilized construction, and prevent accidents such as pipeline blockage, water leakage, power failure and damage to articles caused by construction from affecting others. In case it happens, you must be responsible for repairing

or making compensation as soon as possible.

4. Strictly perform the contract and implement the credit period. If the completion is delayed, such as material withdrawal, slowdown or an excuse to induce Party A to pay

, it will be deemed as a breach of contract after investigation.

5. undertake the warranty responsibility within the scope of decoration construction, and the warranty period is

12 months from the date when the project is completed and accepted by Party A..

Article 9: Liability for breach of contract

After the contract comes into effect, during the performance of the contract, the party who dissolves the contract without authorization shall pay the other party 5% of the total contract amount as breach of contract

. If the actual loss caused by the other party exceeds the liquidated damages due to the unauthorized termination of the contract, compensation shall be made.

Article 11: Dispute Resolution

1. During the performance of this contract, in case of any dispute between the two parties, both parties shall settle it through negotiation

on the premise that the project progress will not be affected. Or lodge a complaint with the member of Shanghai Interior Decoration Industry Association's Family Decoration Committee

based on this contract and the unified invoice issued by Party B, and ask for a solution.

2. If the parties are unwilling to settle the dispute through negotiation or mediation, or if negotiation or mediation fails, they may apply to the-Arbitration Commission for arbitration in accordance with this contract. -the people's court brought a lawsuit.

article 11: modification and termination of the contract

1. after the contract comes into effect after being signed by both parties, both parties must strictly abide by it. If either party needs to change the contents of the contract, it shall

re-sign a supplementary agreement after both parties reach an agreement through consultation. If it is necessary to terminate the contract, the party who proposes to terminate the contract shall do so in written form, and shall p>

2. In the process of construction, any party who proposes to terminate the contract must submit it to the other party in writing. After both parties agree to go through the liquidation procedures, the contract shall be deemed to be terminated after the termination agreement is concluded.

Article 12: Contract comes into effect

1. This contract and its annexes shall come into effect after being sealed by both parties.

2. The supplementary contract has the same legal effect as this contract.

3. This contract (including its annexes and supplementary contracts) is made in duplicate, with Party A and Party B and the witness department holding one copy respectively.

Party A (owner): (signature) Party B: (signature)

Address: enterprise address:

Postal code:

Work unit: legal representative:

Entrusted agent: entrusted agent.