Economic Commitment Letter of Ningxia Branch of Industrial and Commercial Bank of China 1:
If we win the bid for the business office building project of China Industrial and Commercial Bank of China Ningxia Branch, in order to ensure the normal use of the business office building project of China Industrial and Commercial Bank of China Ningxia Branch within a reasonable service period, we promise as follows:
A, the scope and content of engineering quality warranty
During the quality warranty period, in accordance with the management provisions of relevant laws, regulations and rules, undertake the quality warranty responsibility of this project.
The content of quality warranty is the whole content in the construction drawing.
Second, the quality warranty period
1, the reasonable service life of the civil engineering as the main structural engineering as stipulated in the design documents; Other civil engineering for two years, roofing waterproof engineering for five years;
2, electrical pipeline, water supply and drainage pipeline installation project for two years;
3. Heating and cooling are two heating periods and cooling periods;
4. Outdoor water supply and drainage, residential roads and other municipal public works are/year;
5. Other agreements: (regarding the `extension' of the warranty period) shall be implemented in accordance with the Regulations on the Administration of Construction Projects.
Third, the quality warranty responsibility
1, which belongs to the warranty scope and content, we will send someone to repair it within 7 days from the date of receiving the maintenance notice. If we don't send someone to repair within the agreed time limit, the employer may entrust others to repair, and the warranty fee shall be deducted from the quality warranty fund.
2. In case of emergency repair accidents (such as leakage of running water and heating). ), we will
After receiving the accident notice, maintenance personnel will be organized to go to the site for emergency repair immediately. For accidents caused by reasons other than the contractor's construction quality, the repair cost shall be borne by the employer.
3. We guarantee the quality of foundation and main structure engineering within the reasonable use period stipulated by the state.
Four. Warranty guarantee measures. See "14". Engineering warranty measures and commitments "can be found in the construction organization design on page 289.
Verb (abbreviation of verb) economic penalty for breach of contract: If the contractor completes the completion acceptance of the project construction, our company promises that if we fail to implement the above warranty measures and commitments, we will accept an economic penalty of not less than 5‰ of the total project cost.
Hereby promise
Bidder: Ningxia Construction Engineering Group Co., Ltd. (company seal)
Legal representative or entrusted agent:
Date: September 20xx 13
Economic Commitment 2 Guangzhou R&F Construction and Installation Engineering Co., Ltd.:
We promise that the contractNo. ST002 is only used for data filing, not as an actual economic sales contract, and has no economic relationship with Guangzhou R&F Construction and Installation Engineering Co., Ltd., and all economic disputes related to this contract have nothing to do with your company, and all disputes and all legal and economic responsibilities arising therefrom shall be borne by us.
Beijing shengtong machinery equipment lease co., ltd
* * Year165438+1October 24th.
Economic Commitment 3 Commitment Letter
Chen Jianhua undertook the commercial center projects H 1, H2 and No.3 developed by Changsha Depp Real Estate Development Co., Ltd., the first phase of American Story, which was self-financing and independent accounting. Economic disputes arising from subcontracted projects in the construction process shall be borne by Comrade Chen Jianhua himself, and have nothing to do with Changsha Construction Engineering Group Co., Ltd. Minshang Branch.
Hereby promise!
Commitment:
20xx July 23rd
Economic Commitment Chapter 4 (Special Maintenance and Purchase)
Project name:
Project leader:
Project construction objectives and main construction contents (refer to the project task book)
Project budget: the total amount is 10,000 yuan.
Project start and end years: MM/DD to MM/DD.
I. The person in charge of the project promises to consciously abide by the national financial discipline, abide by the School's Measures for the Management of Special Funds and Projects of China Renmin University, accept the supervision and inspection of the School Project Management Office, and promptly correct the problems found.
2. The person in charge of the project promises to implement the project according to the project task book approved by the project management office. Be responsible for observing and implementing the construction objectives, construction contents, funding arrangements and construction progress of various projects. For the losses caused by non-compliance with the project task book, the project leader promises to accept corresponding administrative sanctions and economic penalties. The amount of economic penalty is 65438+ 0% to 3% of the project budget.
3. The person in charge of the project promises to consciously accept the inspection of the project implementation progress by the project management office.
Four, the person in charge of the project promises to strictly implement the approved project budget, earmarking, and shall not be withheld, misappropriated or misappropriated. In case of negotiation changes during project implementation, timely report the adjustment budget and implement it after approval.
Verb (abbreviation of verb) The person in charge of the project promises to strictly manage the project, strengthen the feasibility study of the project and make careful preparations.
Project budget. In the process of project implementation, the project leader promised to strengthen the project fund management, practise economy, strictly control the unreasonable use of funds, put an end to waste, and complete the approved construction project on time and with good quality.
If the amount of fee reduction (or cost overrun) exceeds 10% (including 10%) of the amount of the project submitted for review, the project leader promises to bear the corresponding administrative penalty and give the economic penalty of deducting his post performance salary from 1 to 10 months.
Commitment (signature):
date month year
Chapter V Economic Commitment of Hunan Screw Construction Co., Ltd.:
We promise that the elevator construction contract of Sanjinghua Yuxing Hotel is only used for data filing, not as an actual economic sales contract, and has no economic relationship with Hunan Screw Construction Co., Ltd., and all economic disputes and safety accidents related to this contract have nothing to do with your company, and all disputes and all legal and economic responsibilities arising therefrom shall be borne by us.
Xiangtan songqing machinery equipment lease co., ltd
20xx June 2 1
6 Changsha Construction Engineering Group Co., Ltd.' s economic commitment:
The commercial center projects H 1, H2 and 3 developed by Changsha Depp Real Estate Development Co., Ltd. in the first phase of American Story are self-financing and independent accounting. Economic disputes arising from subcontracted projects in the construction process shall be borne by me and have nothing to do with Changsha Construction Engineering Group Co., Ltd., and I hereby promise!
Commitment:
20xx July 23rd
7 Hunan Guangfu Construction Co., Ltd. Economic Commitment:
We promise that the tower crane contract of New Power Building No.5 is only used for data filing, not as an actual economic sales contract, and it has no economic relationship with Hunan Guangfu Construction Co., Ltd., and all economic disputes related to this contract have nothing to do with your company. All disputes and all legal and economic responsibilities arising therefrom shall be borne by us.
Wuhan Chen Yuan lifting mechanism installation co., ltd
* * Year Month Day
8. Economic commitment of Guangzhou R&F Construction and Installation Engineering Co., Ltd.:
We promise that the contractNo. ST002 is only used for data filing, not as an actual economic sales contract, and has no economic relationship with Guangzhou R&F Construction and Installation Engineering Co., Ltd., and all economic disputes related to this contract have nothing to do with your company, and all disputes and all legal and economic responsibilities arising therefrom shall be borne by us.
Beijing shengtong machinery equipment lease co., ltd
20xx165438+1October 24th
9 Hunan Screw Construction Co., Ltd. Economic Commitment:
We promise that the elevator construction contract of Sanjinghua Yuxing Hotel is only used for data filing, not as an actual economic sales contract, and has no economic relationship with Hunan Screw Construction Co., Ltd., and all economic disputes and safety accidents related to this contract have nothing to do with your company, and all disputes and all legal and economic responsibilities arising therefrom shall be borne by us.
Xiangtan songqing machinery equipment lease co., ltd
* * June 2 1 day,
Economic Commitment 10 In order to further strengthen the efficiency construction of government agencies, innovate the development concept, improve the service quality, optimize the service environment, and ensure the effectiveness of the construction of our bureau's political style, the Commercial Grain Bureau solemnly promises to all sectors of society:
First, strengthen service awareness and earnestly perform their duties. Earnestly perform the functions of managing and guiding the development of service enterprises, and strive to make great breakthroughs in service methods, service efficiency and service quality. Serve enterprises and the masses with a smiling face, a warm greeting, a chair, a cup of tea, a sincere job and a farewell.
Two, simplify the examination and approval procedures, improve work efficiency. Office staff should really improve their work efficiency and service quality, and handle matters that do not need to be studied at meetings within working days; For letters, visits and calls, immediately solve the feedback that can be solved immediately; Can not be solved, according to the time limit for serious, timely feedback; All administrative examination and approval items shall be completed within two working days; All audit items should be reported to the examination and approval unit the next day. All the staff of our bureau must bear the responsibility of first answer and reception when accepting calls and visits, provide warm service and give the parties an accurate and satisfactory answer.
The third is to do a good job in economic operation and ensure the smooth completion of the annual indicators. The main line of 20xx's work is: around the project to maintain growth, quality service to promote development, with the "Ninth National Congress" as the starting point, to promote the comprehensive transformation and upgrading of our county's industrial economy. Take effective measures to ensure that the total industrial output value of the above-scale industries in the county is 3.4 billion yuan, a year-on-year increase of 56.6%; Realized a profit of 300 million yuan; The tax revenue was 450 million yuan, a year-on-year increase of 55.2%, and the investment in fixed assets was 3 billion.
Fourth, strengthen energy conservation and consumption reduction to promote sustainable economic development. Change the growth mode, accelerate the elimination of backward production capacity, and actively promote the adjustment of industrial structure. Widely adopt advanced and applicable energy-saving technologies, strive to reduce the energy consumption of industrial output value of enterprises and improve energy utilization efficiency.
Five, strengthen the construction of a clean government, to ensure clean politics. Our bureau will fully implement the spirit of the Fifth Plenary Session of the Seventeenth Central Committee of the Communist Party of China, conscientiously implement the responsibility system for building a clean and honest government, establish and improve the working mechanism for preventing corruption, conscientiously implement the "Several Guidelines for Leading Cadres in members of the Communist Party of China (CPC)", and organically combine anti-corruption work with various business work in accordance with the requirements of the Guidelines. It is strictly forbidden to seek material benefits, reputation benefits or enjoy benefits by taking advantage of his position.
Sixth, do a good job in the construction of work style and insist on correcting mistakes. In the construction of professional ethics, the first inquiry responsibility system, the examination and approval officer system and the accountability system are implemented. Criticize and educate the staff who violate the relevant regulations and this commitment, order them to apologize to the parties, or give them an efficiency warning, or even dismiss them.
In order to facilitate supervision from all walks of life, xx County Economic and Trade Grain Bureau has set up a supervision telephone.