How to write a logistic support work plan
How to write a logistic support work plan1First, the guiding ideology:
The year 20xx is the most critical year for the development of the XX enterprise business, the Department of Logistics Management will be centered on the requirements of the enterprise 20xx, the implementation of the modern mode of operation of the enterprise, to strengthen the quality of survival, standardize the management of the tree image for the majority of employees to provide quality services to provide feasible logistics support for the business development. The majority of employees to provide quality services for the business development of enterprises to provide feasible logistical support.
Second, 20xx logistics work plan work objectives:
1, food hygiene and safety as the center, to strengthen food hygiene and safety management, to ensure that there is no case of food poisoning throughout the year
2, with the focus on the management of staff apartments, to complete the work of the new staff accommodation arrangements for the year 20xx, to ensure that staff apartments do not occur in a security incident. With the enterprise to do a good job of staff ideological and political work into the apartment, so that the management level of staff apartments on a new level.
3, to staff satisfaction as the goal, establish a new image of logistics services, and strive to staff satisfaction rate of logistics services than in 20xx have certain improvements. At the same time, the creation of civilized units for enterprises and business development assessment to provide better logistical support.
4, to deepen the logistics reform as the driving force, to ensure that 20xx enterprises according to the modern enterprise mode of operation, standardization and development of enterprise logistics business services market.
Third, 20xx year logistics work plan main work:
(a), to carry out integrity education as the theme, to strengthen the professional ethics education of logistics staff, improve the overall quality of the enterprise logistics staff, enhance the cohesion of logistics staff.
1, seriously organize the logistics of all employees to study the Pan 20xx year-end work conference speech points, so that logistics employees can understand the enterprise's "five one project" to further enhance the sense of responsibility and sense of urgency of the staff to do the love of duty, honest service, willingness to dedication.
2, in accordance with the work plan of the enterprise in 20xx, to grasp the enthusiasm of the logistics staff to serve the employees of the enterprise, and to improve the ideological and political quality of the staff and the level of professional ethics.
3, regularly carry out corporate culture, sports and recreation and other collective activities and labor competitions to enhance the cohesion of the enterprise staff, the formation of a positive atmosphere. Youth Day this year, the enterprise will engage in a sports competition, we have to purchase the necessary sports equipment to ensure the smooth implementation of this work.
4, do a good job in the preparatory work before the opening of the enterprise, to ensure that this work can be completed within the scheduled time as scheduled.
5, for the enterprise staff training work to provide strong logistical support work. Equipped with good training room equipment, each training after the end of the training room cleaning work completed to ensure that the next training staff can have a clean and comfortable environment.
(b), food hygiene and safety as the center, strengthen the management of the canteen, to ensure that no staff food poisoning occurs, do a good job of restaurant operations.
1, the safety of the work on the first food work, attach great importance to, layers of responsibility, interlocking, measures in place to ensure that there is no case of food poisoning of employees.
2, the establishment of the cafeteria three meal time department head inspection system to ensure that the quality and quantity of meals, found that the problem is handled in a timely manner.
3, regular dietary meetings, strengthen the kitchen staff's sense of responsibility and hygiene awareness, so that the quality of noodles and vegetables up to standard, do the process of standardization, quality and price match.
4, strengthen the inspection and punishment, and constantly improve the quality of food, improve the level of service.
5, efforts in the meal fancy varieties and the quality of meals on the efforts to make the vast majority of employees satisfied.
(C), to staff apartments and canteens as the focus of the workshop maintenance area as a leader, to the office building and the factory yard as the main line, once a month to carry out a full participation in the dust-free day cleaning activities.
1, the purchase of the necessary cleaning tools to ensure the smooth progress of cleaning.
2, set up by the director of administration as the leader of the administrative personnel and logistics departments responsible for members of the ` evaluation leadership group, each cleaning is completed after the completion of the cleaning work to be assessed, and the results of the assessment will be made public.
3, the development of the appropriate assessment standards:
a, regional health cleaning by the department or responsible person in accordance with the provisions of the implementation.
b, the yard and the yard channel often keep the ground free of cigarette butts, confetti, dirt, bricks and other debris.
c. Toilets must be kept clean and tidy on a regular basis.
d, indoor windows and clean, clean stairs to do clean, leaving no dead ends.
e. Clean the ashtrays at any time.
f. Workshops, office areas and dormitories, beautiful environment, orderly layout, no garbage pollutants, do not put personal belongings, no dust on the walls and walls.
(d), to staff satisfaction as the goal, to strengthen contact with various departments, often listen to the views of employees on logistics services and requirements, improve service quality, establish a new image of logistics services.
1, firmly establish the needs of employees began and ended up employee satisfaction of the corporate service concept, and constantly improve the quality of service and employee satisfaction with logistics services, to create a new image of logistics services.
2, regular staff seminars, the establishment of staff apartments, food service and other opinion boxes, often listen to the views of employees on the logistics services and requirements, and timely processing, to improve.
3, strengthen the contact with the relevant departments of the school enterprise, the development of staff canteens, staff apartments contingency plans, and organize drills.
How to write a logistical support work plan2
First, deepen the results of the performance appraisal
Second, a comprehensive response to the "all-volunteer marketing" work concept
With the company's marketing-related functions, the establishment of a set of logistical services to protect the system, the implementation of the commitment system, the relevant departments to assist in making a commitment, and written into the performance appraisal. Commitment, and written into the performance appraisal indicators to ensure the realization of the company's sales targets.
Third, grasp the savings, insurance targets
In next year's work, the Department of Administration must fully communicate with all departments, the introduction of a detailed system, vigorously grasp the savings, every day to catch, when catching the daily work of more supervision, inspection, improvement, from the "cost-cutting" level to ensure that the company's profit targets reached.
Fourth, pay close attention to safety production
Based on the existing safety standardization management platform, more safety inspections, more safety production management knowledge training, attention to hidden trouble detection, improve employee safety production awareness, to ensure that the safety production zero accident rate.
Fifth, the construction of corporate culture
For this weak link in the work of the Ministry of Administration, we plan to daily corporate culture construction, thematic activities as a complementary way, by absorbing the experience of others advanced corporate culture, in the next year to complete the construction of the company's corporate culture framework.
Six, innovation, ten initiative
As the head of the Department of Administration must spend time to think, for all aspects of the work of the unique improvement methods and ways to take the initiative, will be the innovative management of the next year's performance appraisal indicators for each month to break down, to cultivate their own unique way of thinking, with the spirit of innovation and awareness of the work of the added booster.
VII, perfect self, strengthen learning
In the work of xx year, I still have many problems. Management level is still not high, we must always pay attention to correct their own character defects, constantly self-denial, less talk more work, more practical things, cultivate their own active learning consciousness and habits, absorbing advanced experience, with knowledge to arm themselves, improve themselves.
How to write a logistical support work plan 3First, to improve the staff accommodation, bathing environment:
1, staff apartments and quadrangle lodging staff of about 800 people, the accommodation environment is relatively crowded, although borrowed from the closure of the Wanshan coal mine, organizing the room more than 10, but still can not meet the needs of the
Apartment building will be completed after the completion of the existing staff will effectively change the lodging environment. We are striving to make the 3# apartment building reach the service level of the existing apartment building. With the increasing number of employees, the corresponding supporting facilities are not perfect, the capacity of the staff bath can not meet the use of the next year, the Ministry plans to apply for a new layer of the staff bath, two **** to reach 1300m2, per capita to reach 1m2.
Second, to effectively improve the life of the staff, welfare and other logistical support work:
Employee dining room, the class in the meal continue to increase the pattern of the meal to improve the quality of the meal, and effectively achieve the staff to live, welfare and other logistics support work. Improve the quality of meals, and effectively achieve the satisfaction of the staff to eat, eat at ease.
Third, improve the mining environment
Further improve the mining environment, to reach the gardening standard: ① further improve the mine green zone, keep the mine environment clean and tidy; ② put into use motorcycle sheds, change the mine motorcycle parked haphazardly problem; ③ sewage treatment online monitoring of the commissioning of the sewage treatment to ensure that the sewage discharge standards, and the same reason for the new sewage utilization of the pool, to ensure that the mine water treatment after the secondary use as ground greening and other water. The secondary use of mine water treatment as ground greening and other water, to achieve the environmental requirements of the sewage zero discharge.
Fourth, the water wells and industrial plaza water supply network
The company's production and living water to do water meter metering, water conservation. Installation of water meters in all water pipelines, to achieve accurate measurement, to eliminate the phenomenon of running water, water leakage; and to increase publicity to enhance the awareness of energy saving workers.
Safeguard the safety of workers' living water, ① to solve the problem of drinking water workers, with the end of the deep well water iron removal and desalination desalination treatment project, the next year, the normal operation of deep well water, to ensure that the drinking water of workers to meet the standards; ② to consider the water pool storage of living water and production water to ensure that the safety of water for domestic use, and at the same time, increase the pool enclosure.
V. Boiler and field heating
Boiler room next year to achieve safety and quality standardization of the first level of standards to ensure the safety of the mine heating, gas supply. Specific plans are: ① increase over-temperature, over-pressure, high and low water level alarm chain device; ② strengthen from the boiler operator to the management of the business knowledge, responsibility and safety awareness of the overall education; ③ add a new heat exchanger to meet the use of the 3 # apartment building after the lack of water heating heating problems; ④ coal plant heating system to improve the transformation.
Six, increase the prevention and control of occupational diseases of workers
In order to prevent, control and eliminate occupational hazards, prevention and control of occupational diseases, in accordance with the "Occupational Disease Health Guardianship Management Measures" provisions of the periodic health checks of workers, sound workers' health guardianship files, and relevant departments *** with the establishment of occupational health management organization to establish and improve the management system of occupational health and operating procedures.
VII, engineering construction management
Ground engineering next year, the main projects are: ① continue to improve the 3 # single dormitory building; ② repair and renovation of the workers' bathhouse; ③ industrial plaza pipeline repairs (specifically including water supply and drainage and heat pipe network); ④ 800m3 living pool enclosure project; ⑤ ground floor building repairs; ⑥ maintenance of the industrial site.
Strengthen the implementation of the implementation of this year's introduction of the "project construction management regulations", "building maintenance project management regulations", from the application, approval, budget, construction, acceptance and so on must be carried out in accordance with the provisions of the program.
;