prepare relevant information on fire protection requirements and go to the fire protection window of the administrative examination and approval center.
1. Materials to be submitted for the record of building fire protection:
(1) The following materials shall be provided for the construction project submitted for review:
1. Application Form for Fire Prevention Audit of Building Fire Protection Design;
2. Application Form for Fire Prevention Audit of Automatic Fire Fighting Facilities Design;
3. The approval documents of the planning commission, planning, land and other competent departments and other relevant documents (land ownership certificate or lease agreement and its copy, meeting minutes, leadership approval, etc.);
4, 1∶511 general plan and outdoor fire water supply map;
5. Plan, vertical and sectional views of the building;
6. Design drawings and design calculations related to fire control (including fire water supply, power supply, ventilation, air conditioning and automatic fire alarm system, automatic sprinkler system, smoke prevention and exhaust system);
7. For industrial projects, the production process flow chart and instructions shall be submitted separately (indicating the variety, quantity, specification, flash point, ignition point, explosion limit and storage mode of raw materials and products).
(2) The following information shall be provided for the project of building interior decoration for approval
1. Application Form for Fire Prevention Audit of Building Interior Decoration;
2. Qualification certificate and copy of the construction unit;
3. Property right certificate or lease agreement of the renovated building and its copy;
4. The original Fire Prevention Audit Opinion of Building Fire Protection Design for the renovated building;
5. Plan, vertical and profile of decoration;
6, central air conditioning system diagram and design calculation;
7, fire control system design and design calculation.
Second, the materials submitted for the record of fire control acceptance:
The following materials should be provided for the construction project inspection:
1. Application Form for Fire Control Acceptance of Construction Project;
2. The original Opinions on Fire Protection Design Audit of Building Engineering;
3. Design changes approved by public security fire control institutions, meeting minutes and other documents;
4, project completion drawings;
5. Copies of relevant materials and purchase and sale contracts of various fire-fighting products;
6. Copies of relevant materials and construction contracts of various fire engineering construction units;
7. Construction records (including concealed engineering acceptance records and relevant test reports);
8. Power of Attorney for Technical Inspection of Automatic Fire-fighting Facilities in Building Engineering and relevant debugging and inspection reports of fire-fighting facilities;
9, the construction unit and the self-inspection report of the construction unit;
11. There is a fire control facility inspection report issued by a testing institution with fire control facility inspection qualification.
3. (1) Fire safety inspection needs to be declared under the following three conditions:
1. Public entertainment places such as song and dance halls and theaters; Hotels and restaurants; Shopping malls and bazaars; Stadiums (gymnasiums), auditoriums and other places that can be used or opened only after passing the fire safety inspection according to law.
2. The site where large-scale mass activities with fire risk are held, such as large-scale assembly, fireworks party and lantern festival.
3. after being ordered to stop construction, stop using, stop production and business or stop holding, the unit proposes to resume construction, use, production, business or holding when the unit meets the fire safety conditions after rectification.
(II) Submission materials
1. When applying for the use or opening of public gathering places, the following materials shall be attached when submitting the Declaration Form for Fire Safety Inspection:
a. A copy of the fire design review and acceptance opinions of public security fire control institutions;
B. Fire safety management system;
C. Fire fighting and evacuation plan;
D. fire safety knowledge training of employees, and working certificates of electricians and automatic fire control system operators;
e. fire control facilities and equipment;
F. Other materials that need to be explained.