Current location - Recipe Complete Network - Catering industry - How to do Zhumadian decoration budget?
How to do Zhumadian decoration budget?
(A), the calculation of material costs

After the designer draws the drawings, the owner will calculate the material cost. Generally speaking, the materials that must be used for decoration include:

First of all, the living room and bedroom

1. Building materials: floor tiles, paints, skirting lines, floors, paints and plaster lines.

2. Lamps: main lamp, spotlight and floor lamp.

3. Fabric category: curtains

4. Hardware: curtain slide rail, door lock, door suction, hinge, switch panel, power socket, TV socket, air conditioning socket.

Second, the kitchen.

1. Building materials: floor tiles, wall tiles, ceilings and cabinets.

2. Lamps: main lamp, spotlight and cabinet lamp.

3. Electrical appliances: cooking stoves and range hoods.

4. Hardware: sink, sink faucet, floor drain, door lock, door suction, hinge, switch panel, power socket, angle valve III. Toilet.

1. Building materials: floor tiles, wall tiles and suspended ceilings.

2. Lamps: main lamp and spotlight.

3. Electrical appliances: ventilator, yuba.

4. Sanitary ware: toilet, bathtub and shower curtain.

5. Hardware: toilet paper rack, storage rack, towel rack, bath towel rack, soap rack, coat hook, bathtub faucet, door lock, door suction, hinge, switch panel, power socket, angle valve, shower head and basin faucet.

Owners need to make a rough estimate of the material cost according to their own economic ability, control the total price first, and then ask the market price. The owner lists the materials first, and then goes to the building materials market to calibrate the approximate price of each material. The host must not be afraid of trouble. He must visit at least three building materials markets, and basically the owners can understand the approximate price of materials, so as not to be fooled by building materials suppliers.

(2) Labor cost

The daily wage of each worker can be multiplied by the number of people and days to get the total labor cost, and the owner can bargain with the decoration company.

(3) Design fee

Some owners want to save money by not hiring designers. As we all know, the house design is not good, and it is easy to have problems in the construction process. If there are problems, it will cost a lot of money to rework. So it is very necessary to choose a good designer, and the design fee must not be saved. When the owner chooses a designer, don't be partial to the design drawings given to you by the designer, because you don't know whether he designed them or not. The owner can talk to the designer more about his design concept, past design cases and so on. From the dialogue, we can see whether the designer's basic skills are profound.

(4) Management fee

The management fee is the cost that the decoration company needs to pay for the car, help people buy materials, supervise the work and coordinate all aspects when decorating the owner. This fee can also be negotiated with the decoration company.

In fact, there are many things that need to be done to make a good decoration budget. Here are just some basic steps to make a decoration budget. Owners must read more materials and learn more decoration knowledge before making the decoration budget, so as to ensure that their decoration has both quality and will not waste money.