Current location - Recipe Complete Network - Catering industry - Notice of rectification after inspection
Notice of rectification after inspection

Rectification notices after inspection (7 selected articles)

A notice generally refers to a notice, which is a kind of document circulated in written form to publicize relevant information, and the contents of the notice generally contain the notice object, main items, signer, date, etc. The following is my rectification notice after inspection, welcome to check it.

selected rectification notice after inspection 1

rectification notice of construction project

Building contracting team:

The law enforcement inspection team organized by the Municipal Housing and Urban-Rural Development Bureau conducted a comprehensive inspection on the safety and quality of our project department. After inspection, the 5# building project constructed by your team was due to the following problems.

There are main problems:

Formwork:

1. Formwork support system has no sweeping pole;

2. The stair step template is not supported by 3 leaves;

3. The formwork support system is connected with an outer frame;

4, template flat-fell seam is not tight.

5. It is too early to dismantle the stair tread.

steel bar:

1. The key parts of steel bar binding are not strictly controlled;

2. The thickness of protective layer is uneven, and there are too few protective layer pads.

concrete:

1. The elevation control is out of control;

2. The concrete surface of the cast-in-place slab and the stair tread are uneven;

3. Serious slurry leakage and great waste.

Issuer:

Signed by:

Construction Engineering Group Co., Ltd.

Project Department

Selected rectification notice after inspection

2

Xuzhou Engineering Co., Ltd.:

Our steel structure workshop project undertaken by your company, Upon inspection by our personnel, it is found that your company did not carry out the construction of the foundation according to the requirements of the construction drawings recognized by us, mainly because the label of cement was used too low, and the proportion of cement and gravel was not operated according to the construction requirements, so that the poured cement foundation could not meet the requirements of the quality standard < P >, which would bring serious security risks to the steel structure to be built later and it would be difficult to guarantee the engineering quality. To this end, we strongly demand that you immediately conduct a comprehensive inspection of the poured foundation according to the requirements of the construction drawings, and dismantle and rebuild the finished products that fail to meet the quality requirements, and all the losses arising therefrom shall be borne by you. Please take the time to complete the rectification and inform us of the rectification.

Tel:

-Selected Notice of Rectification after Inspection by Factory Construction Inspector Group

3

____ _ _ _ _ _ _ _ _ _ Owner:

In order to strengthen the use safety management of residential buildings, safeguard the safety and public interests, we find you. According to the Regulations on the Safety Management of Urban Houses in Ningbo, you have violated the second paragraph of Article 1: [It is forbidden to dig holes in the external wall, dig doors and windows and change the color of the external wall]. On June 24th, we sent you a rectification notice to restore the original state within 11 days, but it has not been rectified yet. According to the relevant regulations, we will send you a rectification notice again, and you will be restored to the original state within 7 days, and you will bear the consequences if you don't change it within the time limit.

__ _ _ _ Property Management Co., Ltd.

____ Management Office

Selected rectification notices after inspection 4

People's governments of all districts and cities, _ Demonstration Zone Management Committee, Xixian New Area Management Committee, _ Municipal People's Government, and relevant departments directly under the province:

According to the Notice of the State Council General Office on Strengthening Environmental Supervision and Law Enforcement, In order to consolidate the effectiveness of the inspection, with the consent of the provincial government, we hereby notify you of the rectification of outstanding environmental problems found in the inspection as follows.

1. Overall goal

By carrying out rectification of outstanding environmental problems, we will continuously strengthen the main responsibility of environmental protection in various localities and departments, establish and improve a long-term mechanism for environmental supervision and law enforcement, solve a number of outstanding and difficult problems found in environmental protection inspections, do a good job in preventing serious environmental pollution incidents, and promote the continuous improvement of the ecological environment quality in our province.

II. Key tasks

(1) Clean up illegal construction projects. In accordance with the requirements of "eliminating and closing a batch, rectifying and standardizing a batch, and perfecting a batch for filing", all localities should set up rectification ledgers for illegal and illegal projects of "building before approval" and "investing before inspection" respectively, speed up the supervision and rectification, and ensure that the rectification task is completed before the end of October 21.

(2) severely crack down on illegal sewage enterprises. All localities should focus on investigating and dealing with illegal enterprises such as abnormal use of pollution prevention and control facilities, smuggling, forgery and tampering with environmental monitoring data, and strictly implement rectification measures. Those who refuse to correct and are suspected of committing crimes should be seriously investigated for the responsibility of relevant personnel and enterprises.

(3) rectify the problem industrial park. All localities should earnestly do a good job in the rectification of problem industrial parks, especially for problems involving mass relocation, environmental emergency plans, planning environmental impact assessment, incomplete or abnormal operation of environmental protection infrastructure, etc., it is necessary to formulate a letter of responsibility, clarify the timetable, and complete the rectification as required.

(4) eliminate backward production capacity. All localities should continue to eliminate the "fifteen small", "new five small" and production processes that do not conform to industrial policies in light of the actual industrial development and environmental quality, and force industrial transformation and upgrading.

(5) supervising the ecological environment. All localities should carry out special supervision and rectification of illegal sewage outlets and illegal development and construction in drinking water sources and nature reserves.

III. Work measures

(1) Strengthen leadership and pay close attention to implementation. All localities should earnestly fulfill the responsibility of territorial management, strengthen the organization and leadership of the rectification of outstanding environmental problems, formulate rectification plans for problems and hidden dangers that have not been rectified in major inspections, clarify rectification measures, objectives and time limits, and increase supervision to achieve "three don't let go" (tasks are not clear, responsibilities are not implemented, and measures are not in place); For the environmental problems and hidden dangers that have been rectified, it is necessary to "look back" through enterprise self-inspection, special inspection by environmental protection departments and comprehensive supervision by the government, and the rectification situation will be announced to the public in a timely manner. At the same time, it is necessary to strengthen daily supervision and inspection, and timely investigate and rectify the environmental problems that have not been investigated in the major inspection.

(2) severe punishment and serious accountability. All localities should strictly implement the "Environmental Protection Law" and other environmental protection laws and regulations, focusing on cracking down on malicious illegal sewage discharge and data fraud. For enterprises that violate the law seriously, they should be severely punished according to law and rectified within a time limit. During the rectification period, production and discharge should be limited, and those that still fail to meet the requirements after rectification should be closed down according to law; For enterprises listed in the "blacklist", it is necessary to suspend the examination and approval of new, modified and expanded projects. It is necessary to improve the system of investigating and handling major cases, and improve the mechanism of linking administrative law enforcement with criminal justice. For suspected criminal cases with serious nature and bad influence, the environmental protection department should jointly supervise and supervise the judicial organs, and resolutely overcome the phenomenon that the case is fixed, the case is difficult to move, and the punishment is replaced by punishment. At the same time, it is necessary to warn the responsible units and supervision units that are ineffective and slow in rectification; If the circumstances are serious, such as practicing fraud and committing crimes against the wind, we must seriously pursue the responsibility.

(3) Strengthen dispatching and smooth information. All localities should strengthen information statistics and analysis, do a good job in information disclosure and submission, report the Schedule of Rectification of Outstanding Environmental Problems (including construction project cleaning) every month, and report quarterly work development. According to the principle of "who fills in the report, who sells the number", all localities are responsible for the sales number of the list of environmental problems step by step. Before the end of 11, they report the rectification of environmental problems (including the clean-up of construction projects) to the provincial government, and send a copy to the Provincial Environmental Protection Department. The problems that cannot be rectified and sold should be explained one by one. The provincial environmental protection department will report the development of various places every month according to the reporting and supervision of the sales number of the inventory system of environmental protection inspection, and conduct warning interviews for serious problems, and make public exposure in the major media in the province.

Contact: Zhu _

of the Provincial Environmental Protection Law Enforcement Bureau. Tel: (Fax:

Box:

_ Selected rectification notice after inspection by the Provincial Environmental Protection Department on June 21th, 2115

Meijiali Property Management Co., Ltd.:

Property services have existed since the community was used for 21 years. The confusion of property management has caused a bad influence among the owners. For this reason, after discussion and deliberation by the owners' committee of the residential area, we hereby put forward a rectification notice to the residential property company. The problems that need urgent rectification are summarized as follows:

1. Safety management problems

1. Unclear security responsibilities, unclear processes and chaotic personnel access management. Security guards chat with idlers during working hours. Entry personnel do not register, and outsiders do not ask, so that all kinds of advertising leaflets are spread all over the community.

2. The security etiquette is not dignified (no security clothes).

3. The security work arrangement is unreasonable, and there are too few people in the same position. Usually patrol and night patrol are insufficient. It is rare to see security guards patrolling.

4. The fire extinguisher was damaged, and some public facilities were damaged and not repaired.

5. Some street lamp wires are exposed and not treated in time, which has great hidden danger to the personal safety of the owner.

Second, vehicle management problems

1. The owners' vehicles in the community were not counted.

2. The parking management of vehicles in the community is poor, some vehicles are parked in the green belt, or some garage vehicles are blocked.

3. When foreign vehicles enter the residential area, the doorman does not register and never follows the arrangement, which causes foreign vehicles to occupy the roads of the residential area at will and crush the green space of the residential area, resulting in damage to the greening of the residential area.

4. There are many dead ends of garbage, and the problem of littering affects the community environment. It is necessary to clean up the garbage in the community in time and remove the garbage and sundries piled up at will.

4. Small advertisements can be seen everywhere in the community, which seriously affects the beauty of the community. We should strengthen the inspection work of cleaning staff and remove small advertisements in time. Third, the cleaning problem

1. Life, the pool garbage can not be cleaned in time.

2. The sanitary corner in the corridor cannot be cleaned in time.

Fourth, the greening problem

1. The greening of the owner's residential area and some public * * * areas was severely trampled, and it was not repaired in time, which reduced the landscape and greening level of the community.

V. Financial problems in the residential area

1. The property should publicize various charging standards.

3. The financial disclosure system should be established for the * * * property with financial income in the residential area. Publicize the financial revenue and expenditure of the community. Financial openness and transparency.

the above-mentioned contents that need to be rectified require your company to complete the rectification before April 6, 21__, when the members of the community industry committee will accept the rectification on behalf of all the community owners.

this is for your information.

it is ordered that Meijiali Property Management Co., Ltd. must come up with written rectification measures before April 1, 21__. In the next six months, we will solicit the opinions of all owners according to the rectification of the property and consider whether to pay the property management fee for the coming year; And whether to sign a property service contract with Meijiali Property Management Co., Ltd. in the coming year.

___

Year, month and day

Selected rectification notice after inspection 6

Construction rectification notice

Project name:

No.:

Project manager:

Dongli scaffold

Person in charge:

Full-time security officer:

Date:

.

2. The lap joint of steel pipe supported by scissors in the north facade does not meet the specification requirements. (insufficient lap length of steel pipe scaffold and fasteners, etc.)

3. There is no sweeping pole connected and fixed inside the corner of the pedestrian walkway along the street.

4. There is a lack of fasteners in some parts of the scaffolding in the north facade, the fasteners in some parts are not fastened firmly, and the number of wall supporting connectors is insufficient.

5. The pedestrian protection shed of the main building passage in the hospital is only equipped with a single protective ceiling, but not with a double protective ceiling as required by the specification.

6. The location of the bar, the west facade of the podium and the springboard erected by the pedestrian walkway shed are not tied and fixed with steel wires, which poses a safety hazard.

7. The cantilever scaffold at the bar location should be dismantled before (212) at the request of the supervision company, otherwise the site construction cannot be resumed.

8. For the pedestrian walkway protection shed on the west facade, the distance between the hard protection springboard on the top floor is not tight, and the springboard and the steel pipe rack are not tied and fixed with steel wires, which has certain security risks.

9. After the pavement of the west facade street-facing buckle scaffold protection net is completed, it is loose, and some of it has been opened, which affects the image of our civilized construction on site, and it is ordered to complete the maintenance before June 4, 21__. Attachment: on-site photos (11 photos)

Signature of person in charge:

Signature of full-time safety officer:

Signature of project manager:

Selected rectification notice after inspection 7

No.:

In order to promote the overall improvement of rural appearance, according to the requirements of new urban areas,

after receiving this notice, please make a comprehensive rectification around your unit and the range to the center line of the highway before 21_ _ _, and implement the "three guarantees in front of the door" to ensure a clean and tidy environment and orderly parking of vehicles.

if your unit fails to complete the rectification within the specified time, the township government will order it to suspend business for rectification, and it is not allowed to start business before the environmental sanitation reaches the standard.

after the completion of this centralized rectification, if it is found that domestic garbage is piled up at will, sewage is turbulent and business is conducted outside the store, 511 yuan's sanitation and cleaning fee will be levied.

this is for your information.

__ People's Government (official seal)

21_ _ _ _