What are the renovation processes of ordinary restaurants in Tianjin?
1. On-site inspection: After the decoration company is determined, the person in charge of the decoration company is required to conduct on-site inspection and propose the overall renovation plan for the restaurant to investors.

Reasonable suggestions, such as predictive problems in the construction of some places, must be communicated in advance.

2. Decoration scheme: Before signing the contract, the person in charge of the construction party is required to list the construction progress, personnel arrangement table, protection measures at the construction site, etc.

And communicate with the property in three aspects.

3. renovation contract: Before signing the renovation contract, investors should go to the decoration company for on-the-spot investigation and consultation to verify the salary of the decoration company.

Quality and business license.

4. Decoration preparation: After the preliminary preparation work is completed, we are ready to start construction. First decorate the equipment, machines, tools and materials, and get the entrance and exit certificates of the decoration personnel.

, the establishment of construction project card, completes the construction site fence and safety tips.

5. Phased construction: The initial stage mainly includes infrastructure construction, hardware underpinning and basic pipe network layout.

6. Acceptance by stages: the construction supervisor will follow up the on-site decoration and supervise and coordinate the on-site construction.

7. Completion acceptance: The decoration of the tea restaurant has taken shape, reaching the effect of the design drawing.

8. Business review: Check whether the engineering facilities are normal after the tea restaurant opens for one or two months.

9. Termination of the contract: after the investor's business review, if there is no problem, both parties will settle the balance and the contract will be terminated.