Hefei South Railway Station was fully started at 20 12, 10, 14, 12, 20 19, 12.
Content of Hefei South Railway Station
From 65438 to 0996, the overall planning of Hefei Railway Hub established the positions of South Ring Road and South Station, and the Fourth Survey and Design Institute of the Ministry of Railways compiled and determined the layout framework of Hefei Circular Hub.
Construction course of Hefei South Railway Station. In 2003, according to the introduction of the Shanghai-Han Rong Passage, Shanghai, Wuhan and Chengdu, combined with the adjustment of Hefei master plan, the master plan of the hub was revised again, and the main passenger stations in the hub, Hefei Station and Hefei South Station, were determined. The city planning department has planned and reserved the land and sites around the South Ring Road, which also laid the foundation for the follow-up construction and avoided large-scale demolition and construction.