"City Business Card" from prosperity to decline
In February, 2114, Binzhou Tourism Bureau announced that "China Shipping Aircraft Carrier" was one of the three major projects located in Binzhou New District. The project is built according to the standard of a four-star hotel, and it is a high-grade dining and entertainment place with unique style, which integrates the functions of catering, accommodation, entertainment, fitness and bathing.
regarding the market prospect of "aircraft carrier", Binzhou Tourism Bureau believes that there is no comprehensive high-grade dining, entertainment and leisure place in Binzhou, which can no longer meet the requirements of the society, especially foreign merchants, and lags behind the economic development. The permanent population of the "China Shipping Carrier" project in the half-hour economic circle (by car) is 1.2 million. After the project is completed, it will bring high returns to investors and great economic and social benefits to Binzhou.
however, the construction process of this highly anticipated project is not smooth. At first, the government planned to invest 31 million yuan to build a "China Shipping Aircraft Carrier", but after the completion of the infrastructure construction, 31 million yuan has been spent. With the rising prices of raw materials such as cement and steel (36.33,-8.11,-1.22%), it has to invest more. By 2117, the project had invested 91 million yuan, but the fine decoration project has not been completed.
after a total investment of RMB 21 million, around 2118, merchants of "China Shipping Aircraft Carrier" settled in one after another. In the initial period, the "aircraft carrier" was extremely popular and once became a local business card. A local taxi driver said that at first everyone felt fresh, and even the residents of the surrounding counties came to play. The businesses in the "aircraft carrier" were doing very well, and even the Lian Deng aircraft carrier had to spend money.
However, the good times didn't last long. By 2111, this hot scene no longer appeared, and catering and entertainment businesses closed down one after another. At this time, this project is almost in a state of neglect.
On the afternoon of July 22, 2113, after a heavy rain, there was no tourist on the huge platform of more than 111,111 square meters, the railings around it were rusty, all the doors of the four-story buildings on the platform were closed, and graffiti could be seen everywhere. The passage through the lower platform is also firmly locked. The once lively scene left no trace.