Current location - Recipe Complete Network - Catering training - How to draw the fire plan?
How to draw the fire plan?
Question 1: How to draw the fire control audit plan is basically the plan of the general plan, and the specific conditions of the project include fire-fighting articles, fire hydrant system, fire alarm, automatic sprinkler system, evacuation, emergency lighting and smoke control. Save all the pictures, bind them into a book and submit them for approval! Good luck!

Question 2: How to draw a fire family evacuation map? Requirements for drawing a road map for family fire evacuation and escape;

1. Draw the floor plan of your home, mark the name of each space, mark the exits and escape routes such as doors, windows, balconies and stairs;

2. If it is a high-rise building, mark the direction of evacuation stairs after going out;

3. Draw two escape routes in each room;

4. Focus on the location and escape direction of family members (disabled, sick, disabled, old, young, and other vulnerable members) who need help when the fire breaks out, and indicate which family member assists the vulnerable members to escape;

5. Mark the positions of flashlights, towels, sheets, ropes and fire extinguishers that can be used for escape, and determine a temporary assembly point outdoors;

Question 3: How to draw this fire sprinkler on the symbol diagram of fire sprinkler? On the plan view, it is circular, with the upward spray pipe passing through the circle and the downward spray pipe passing through the circle.

Question 4: How to draw the fire plan should follow the fire code to determine the number and distance.

Question 5: How to make a fire map? There are the following parts:

1. Personnel evacuation: including the determination of evacuation exit, safety exit, evacuation distance, evacuation width, fire door setting, etc. , must comply with the relevant provisions of the song and dance entertainment.

Second, emergency lighting and evacuation instructions: according to the corresponding specifications, and must meet the requirements. Now the standard requirements have become more and more humanized, and people's escape is the first. Third, fire alarm: usually includes detectors, manual alarm buttons, input modules, alarms, etc. These are fire forecasts.

4. Fire extinguishing facilities: usually including fire hydrants, automatic sprinklers, fire extinguishers, etc. , depending on the specific situation, whether it is necessary to add fire water tanks and fire pools.

In a word, we must analyze the specific problems according to the actual situation.

Question 6: How to draw a schematic diagram of fire evacuation? Draw only buildings, and then draw fire exits and exits (it is best to draw fire compensation everywhere). Really can't. Go to the hotel and see what's going on behind the door. Hmm. How interesting

Question 7: How to draw the fire safety plan and bring the building plan, and on this basis, mark the positions of fire extinguishers, fire hydrants, emergency lighting, evacuation instructions and safety exits, and it is best to mark the nearest evacuation route.

Question 8: How to draw the fire plan of the factory? All other pipelines are removed according to the pipeline plan of the outdoor general plan, and only the fire pipeline and the general plan are kept.