The term "central heating enterprises" as mentioned in these Measures refers to enterprises engaged in the production, operation and service of central heating. Article 4 The administrative department of construction of the Municipal People's Government is the administrative department of central heating in this Municipality. Other relevant departments of the Municipal People's Government shall, according to their respective responsibilities and the provisions of these measures, do a good job in the management of central heating. Article 5 Central heating shall be implemented in urban heating, decentralized boilers that do not meet the requirements of environmental protection shall be banned, and existing heating methods with high pollution and high energy consumption shall be reformed in a planned way. Popularize and utilize the advanced technology, equipment and materials of central heating, and improve the scientific and technological level of central heating.
Encourage investment in the construction of urban central heating facilities and engage in urban central heating production and operation activities, and encourage fair competition among heating enterprises. Sixth central heating unified planning and management. Chapter II Planning and Construction Article 7 The municipal construction administrative department shall, jointly with the departments of development and reform, natural resources and planning, ecological environment and electric power enterprises, formulate a special plan for urban central heating according to the overall urban planning, and organize its implementation after being approved by the Municipal People's Government. Eighth new construction, expansion and reconstruction of urban central heating projects shall conform to the special planning of urban central heating, and the construction unit shall report to the municipal construction administrative department, and go through the relevant formalities according to the basic construction procedures after approval. Ninth in the built and planned construction of cogeneration central heating pipe network coverage, no new (renovation, expansion) of coal-fired thermal power plants and decentralized heating boilers burning highly polluting fuels.
The heating radius of cogeneration power plants of 300,000 kilowatts and above15km, boilers burning highly polluting fuels and backward small coal-fired power plants are all shut down and integrated. Tenth new residential areas, public facilities and enterprises need central heating within the scope of central heating pipe network, the central heating pipe network should be included in the supporting facilities, while designing, constructing and putting into use.
The construction unit shall apply for the use of heat to the heating enterprises before the design of the central heating project, and the design scheme shall solicit the opinions of the heating enterprises. After the completion of the heating project, the construction unit shall organize the heating enterprises to participate in the special acceptance of the heating project, and can be put into use only after passing the acceptance.
Heat users need to transform the thermal system, they should apply to the heating enterprise and the transformation plan, and the construction can be carried out only after approval. After the transformation of heating system is completed, the technical data of completion shall be submitted to the heating enterprise, and the heat can be used only after the heating enterprise has passed the acceptance.
New construction, reconstruction and expansion of urban roads shall reserve the laying position of central heating pipelines in accordance with the plan. Article 11 The design, construction and supervision of urban central heating projects must be undertaken by units with corresponding professional qualifications. Article 12 The design and installation of internal heating facilities for heat users shall be carried out in accordance with relevant national technical standards and technical parameters provided by heating enterprises. Chapter III Operation and Management Article 13 The establishment, alteration and termination of a heating enterprise shall go through relevant procedures in accordance with the provisions of the state. Fourteenth heating enterprises shall sign a heat supply contract with heat users according to law.
Heating enterprises shall provide heat users with the model text of "Urban Heating Contract" jointly formulated by the national construction administrative department and the industrial and commercial administrative department. Article 15 A heating enterprise shall provide heating for residential heat users in general years according to the heating period from February 5 of that year to March 5 of the following year, and the room temperature of residential heat users with heating facilities shall not be lower than 16 degrees Celsius.
If the heat metering and control device has been installed in the property management area as required, the heat fee will be charged according to the meter measurement; In the property management area where no heat metering control device is installed, the heat fee shall be charged according to the area.
If there are special requirements for heating period, temperature, pressure and flow rate, it shall be agreed by both parties in the contract.
Heating enterprises shall not stop heating without authorization; In addition to the emergency, if it is really necessary to suspend heating, it shall notify the heat users 3 days in advance. Sixteenth heating enterprises should implement standardized services, service content, standards and time to the public, accept supervision. Seventeenth units and individuals that need heat shall apply to the heating enterprise for opening an account. Eighteenth heat users need to change the user's name, address, heating load and need to stop heating, it should apply to the heating enterprise. Nineteenth new buildings that need central heating should install heating metering control devices to realize household circulation and household control, and implement metering and charging; The existing building heating facilities should be gradually transformed to realize household circulation, household control and metering.
When the existing building is renovated with heating facilities, the heating enterprise shall provide assistance, and the expenses required shall be borne by the heat users.