In the process of decorating the house, every owner will check the completion of each project one by one. After the renovation, we should also do an overall inspection to give the house a comprehensive experience. Then, let's introduce in detail how to accept the renovated house and the matters needing attention in the acceptance of the renovated house. Friends who want to know can come and have a look.

First, how to check and accept the renovated house

1, check the wall. I don't know when it started, but looking at the wall turned out to be the primary problem of house acceptance. Bian Xiao has seen a house and found that the windows are leaking in rainy days. Only after asking did I know that there was water seepage on the wall under almost every window in the whole building. When the typhoon comes, it is even more frightening. Therefore, it is best to inspect the house the day after heavy rain before handing over the house. At this time, if there are problems with the wall, it is almost inevitable. In addition to water seepage, there is another problem in the wall, that is, whether there are cracks. A friend of Bian Xiao once reported that there was a door-like crack in the wall of his house. Later, he asked the developer, only to know that it was the elevator cargo port left during construction. Later, when I closed the door, I handled it carelessly, leaving a future trouble.

2. Check waterproof. Waterproofing here refers to the waterproofing of kitchens and bathrooms. Of course, some of the houses currently delivered have already stated in advance that they are not waterproof and need to be done during renovation. If waterproof treatment has been done at the time of delivery, then the waterproof quality needs to be verified. If you don't try before decoration and find water leakage after decoration, the maintenance project will be big. You have to tear down the newly decorated floor to make a new waterproof layer.

3. Check the pipeline. The pipes referred to here are drainage pipes or sewage pipes, especially the sewage outlets of balconies. At the time of acceptance, take a water container and pour it into the drain to see if the water flows smoothly. Why do you accept this? Because in the process of construction, some workers often pour some cement slag into the drainage pipe when cleaning. If the cement is sticky, the elbow will be blocked, which will make drainage difficult. There is another situation, that is, to see if there is a water storage and odor-resistant elbow in the sewage pipe. According to experience, if there is no water storage and deodorization elbow in the sewage pipe, the overall quality of the house will be discounted.

4. Check the horizon. Checking the horizontal line is to measure the horizontal error between the indoor floor farthest from the door and the floor inside the door. Check horizon can also reflect the building quality of developers in many cases. I'll introduce you to a simple method: go to the hardware store to buy a transparent small water pipe about 20m long and fill it with water. Draw a sign at the door 0.5m or 1m above the ground, then adjust the water level of the water pipe to the height of this sign, and find someone to fix it in this position. Move the other end of the water pipe to the room farthest from the door. Then look at the height of the water pipe over there and make a sign. Measure the height of this sign from the ground with a ruler. These two height differences are the elevation difference of the house.

5. Check that the floor is very high. If your contract has this clause. Then you should measure the height of the building. The method is simple. Measure a ruler along the inner corners of two walls. You should measure many places indoors. Generally speaking, the height of about 2.65 m is an acceptable range; If it is lower than 2.6m, it will have to be considered. This kind of house will make you have to live in a depressed environment in the future.

Second, the house decoration acceptance matters needing attention

1. Check all sockets.

Friends who don't have a pencil can bring a charger and a three-phase connector plug. The charger can check the two-phase socket and the plug of the three-phase connector can check the three-phase socket.

2. Check all the windows.

Check the glass: there should be no scars on the glass. Everything we buy is a commodity, so we should check it carefully, or we will lose money. Don't think that it doesn't matter if there is a small scar on such a big piece of glass. Think about it. If you are buying a mirror, you definitely don't want a mirror with a scar.

Check the window screening. Many screens have broken screens or big scratches.

Check whether the window touches the wall when it is opened. It is easy to damage the wall.

3, check the telephone line, broadband interface Tianlun's telephone line and broadband panel quality is good, but also depends on whether it is fixed firmly!

4. Check whether the radiator and balcony guardrail are firm.

5. Check each light and switch.

6. Check each faucet.

7. Check the original acceptance form for the completion record and the actual measurement form of the house area when closing the house, otherwise it will be too late to raise the area issue once the key is picked up. In judicial practice, if no objection is raised when the house is closed, it is regarded as the fact that the purchaser gives up the right to dispute the area.