What information should municipal engineering do?
First, the preparation stage documents.

1, project documents, construction drawing examination certificate, planning permit, construction permit and quality supervision.

2. Geological exploration report.

Second, the construction process documents.

Construction management.

Business license and qualification of the unit (laboratory, measuring instruments,), safety production license, application for the establishment of the project department and post certificates of relevant personnel.

Building technology.

1, construction organization design and approval, (overall, safety, winter and rainy season, temporary electricity consumption, roads, sewage, deep trench excavation and protection construction, rainwater, bridges, bored piles, bridge engineering hoisting scheme, pier column, capping beam construction scheme, prestressed tensioning scheme, pile foundation, etc. ).

2. Letter of appointment, task book, minutes of the blue prints.the design, commencement report and extension report.

3, technical disclosure records, work contact list and design changes.

Building records.

1, measurement class (pile delivery record, measurement review record; Construction survey setting-out record).

2. Rebound and deflection records, drilling records of bored piles, hole-forming records, underwater concrete pouring records of bored piles, prestressed concrete tensioning records, hole grouting records, concrete pouring records, temperature measurement records, settlement observation records, etc.

3, the construction log.

Third, the construction test documents.

Four, the construction quality inspection documents.

Verb (abbreviation of verb) construction acceptance.

Completion report, construction instructions and completion elevation.

6. As-built drawings.

Supervision notice and reply.

Inspection application and first article inspection of concealed works in quality inspection station.

Party A's documents.

Weekly plan, monthly plan.

Job description.

Standards and specifications.

Classification and storage of engineering data;

(1) Ensure the standardization, institutionalization and scientificity of engineering data management.

(2) The custody and preservation methods of engineering data should be determined according to the actual situation of the unit, and must comply with the relevant provisions of file management.

(3) The engineering archives shall be established according to the regulations and requirements of archives management, and submitted to the local archives management institution for archives management acceptance.

(4) The engineering archives must be safe and tidy, and achieve "six defenses", that is, fire prevention, theft prevention, insect prevention, mildew prevention, dust prevention and light protection.

(5) Engineering data shall be handed over and filed according to relevant regulations. After the project is completed and accepted, it shall be handed over to the archives according to the relevant regulations and time limit; Submit it to the owner within the time limit stipulated in the contract.

(6) When borrowing engineering materials, relevant procedures must be performed and shall not be damaged or lost.

(7) The recovery and destruction of engineering data shall be carried out in accordance with the relevant regulations of the unit and local archives management.

Extended data:

Municipal services include urban roads, bridges, water supply and drainage, sewage treatment, urban flood control, gardens, road greening, street lamps, environmental sanitation and other urban public utilities.

1, road traffic engineering. Such as roads, interchanges, squares, transportation facilities, railways, subways, etc.

2. River and lake water system engineering. Such as rivers, bridges, diversion (drainage) canals, irrigation and drainage pumping station, sluice bridges and other hydraulic structures.

3. Underground pipeline engineering. General water supply, drainage (including rainwater and sewage), power supply, communication, gas supply, heating, special underground pipelines, civil air defense passages, etc.

4. Overhead pole line project. Power supply poles, communication poles, trackless poles and overhead pipelines with different voltage levels.

5. Street greening project. Street trees, shrubs, lawns, green sketches (such as rockeries, verandahs, easels, pools, fountains, etc.). ), buildings and structures are the main components of municipal professional engineering fields (factories), stations and points.