A period of work ended inadvertently, and a lot of achievements have been made during this period, so we should sum up the work well. Do you know the format of work summary? The following is a summary of my work for half a year (5 general remarks). Welcome to share.
Half a year's work summary of the monitor of electrical operation 1 Under the correct leadership of the team leader and the monitor for one year, although I have done the above work and achieved certain results, as a new employee, compared with the achievements of other team members, there is still a certain gap. There are mainly the following aspects:
1, their professional level is not high.
High voltage test's later data analysis and judgment are more difficult, and sometimes experience judgment is needed, which is what I lack most. So I need to study more in my future work and pay more attention in the case of special faults. In the study class, the master looks for problems, analyzes problems and solves them.
2, the role change is not enough
I just think that I can complete the experiment, do my job well, and lack the study of organization and coordination. In addition, there is a certain inertia on safety issues, thinking that the person in charge can work boldly and safely after confirmation, and lacks self-protection.
For the above shortcomings, in the 20xx years of work, I want to sum up the experience and lessons, find out the gap and overcome the shortcomings, especially in the work of safety production. I want to keep a clear head in front of my grades and fully realize that unsafe factors may still exist. Only by adhering to the policy of "safety first, prevention first" and working carefully can we nip in the bud.
Time flies, I graduated from Hubei Urban Construction Vocational and Technical College in July 20xx, and worked for xxXXX Engineering Co., Ltd. in XX. In this short period of more than two years, I have not only deepened my understanding of what I have learned, but also gained a better understanding of what I have not touched or touched very little in books before. Since work, under the training and teaching of leaders and supervisors, through their own efforts, both study and work have made great progress and great gains. The work is summarized as follows:
In study, since I joined the work, I have been strict with myself, taking my work seriously and trying to improve my ability. At this point, the company gave me good conditions: a large number of practical engineering cases really have a good guiding role for our graduates who just worked; There are also a wealth of books and materials, which can give me a good opportunity to broaden my knowledge and get information and understanding of the development and changes of the industry in time. The design institute also has a positive working environment and a high-quality staff team, which can inspire me to keep learning, surpass myself and improve my self-cultivation.
At work, the first project I participated in was the garden design of Resettlement East and Guidong Gardens. In this project, I became familiar with the basic process of project design, applied the skills of Tianzheng Architecture and cad I learned in school to practical work, gained a lot of practical experience, and learned how to communicate with Party A and deal with problems encountered in design. Finally, the construction drawings of these two projects were successfully completed and delivered to Party A in June and July, 2008 respectively. During this period, I have been working conscientiously with my colleagues and following the instructions of my supervisor. During the project, I clearly understood the detailed process of the project from scheme-expansion-construction drawing, learned many specifications in design, and strengthened my ability to get along with others and deal with problems in work. Under the guidance of the supervisor and communication with senior employees, my professional knowledge and skills have been greatly improved. Later, he also participated in the landscape design of Li Mao, Bicui Hua Ting, Jinxiu Hua Ting and Beihuan Road. During this period, I paid a lot and gained a lot. After more than a year's work and study, I feel that as an engineering technician, I must be careful, do every step well, be familiar with the design process, drawings and specifications, continue to learn the knowledge related to design and specialty, arm myself with knowledge, learn to communicate with people at work, how to be a man, and establish a correct attitude.
With the development of society, people have higher and higher requirements for design quality. Quality is the solid foundation for the survival and development of enterprises. The improvement of quality depends on the overall quality of employees and the improvement of technical management level. In order to face more fierce competition, it is the focus of the company's work to cultivate high-quality, high-level professional technical and management talents. In the past year's work, with the care of leaders and the support and help of colleagues, through continuous efforts, I have adapted to the pace of work and have certain technical work ability, but there are still some shortcomings. In my future work, I will strengthen my study, overcome my shortcomings and strive to continuously improve my professional and technical level. At the same time, I clearly realize that in order to adapt to the new situation of landscape design, I need to constantly strengthen theoretical study, especially the study of new technologies and theories.
In the first half of the year, under the leadership of the superior, we cooperated sincerely with the workers in this workshop and successfully completed half of the tasks arranged this year. At the same time, I don't forget to recharge my batteries. I insist on studying for an hour every day and take part in different business trainings to improve my ability. Now summarize the work in the first half of the year and look forward to the work in the second half.
I. Management work
In order to let every employee participate in the management of the workshop, I assigned the equipment management to people, established a good form, and formulated a reward and punishment system at the same time, so that the workers in the workshop can ignite the psychology of competition, and at the same time change the maintenance objects every month, so that the workers can know more about the equipment in our workshop.
After working for a period of time, organize the workshop staff to overhaul the equipment, report to the superior in time when problems are found, and arrange time for maintenance to make the production of the workshop smoother.
At the beginning of the year, the company advocated making our working environment cleaner and dust-free. Our workshop actively responded to this call and set up an inspection team to rationally plan the time for personnel to clean up the working environment.
Second, personal work.
In the first half of the year, I was not distracted by other work, but fully planned my time. I didn't procrastinate in my work. I actively exercise my working ability in the production process, understand the problems that will occur in my work, record them in my notes, and think about solutions in my spare time.
Third, study.
To keep the passion of learning in the busy work, as the workshop monitor, I must set an example, never relax my requirements, learn from others' strengths at work, listen to others' work experience and make up for my own shortcomings; Subscribe to the professional magazines of life, understand the current emerging technologies and expand the theoretical knowledge reserve; Participate in other aspects of management training, so as to establish prestige in the workshop, let the workers in our workshop unite and build a stronger collective.
Fourth, shortcomings.
There will inevitably be mistakes in the process of work, but more or less. Reflecting on my experience in the first half of the year, there are still many shortcomings, especially in management, which is not strong enough to be implemented by every employee; Also, I often pat my head to decide one thing without careful consideration; And in the operation and management of equipment, it is necessary to strengthen training and so on.
I learned in the first half of the year that people are cultivated step by step. Now I am full of confidence in myself. After studying hard, I will definitely perform better. No matter what, it depends on my performance in the second half of the year.
It's almost a year since the monitor of electrical operation summed up his work for half a year. I am the electrician squad leader in the community, adhering to the working principles of meticulous and rigorous, safety first, and dealing with water and electricity. I have never had any dangerous accidents, which is very gratifying.
Below, I will talk about my understanding of safety work.
Every time I receive maintenance work, I always make preparations, including finding all necessary tools and necessary protection. Especially when repairing circuits and electrical appliances, I must be careful, distinguish the essence, and always remember safety first.
I remember that there was a power outage. With years of experience, I have successfully solved the mystery and solved the problem. The thing is, there was no electricity at home. At first, I took a cursory look at the zero line and fire line outside the user and saw signs of blackening at the zero line connection. I can't see the thread clearly I tried to connect and saw a purple-blue spark flashing and crackling, and then stopped. Then, I checked the socket on the wall with a multimeter and found that the voltage difference between the two ends of the two-hole socket is zero, and the potential at each end is 220 volts AC. Therefore, my preliminary judgment is that there is a "wiring" in the user circuit, that is, the live wire and the zero wire are connected, which leads to the ablation of the external zero wire connector due to excessive current. But there should be no voltage display in this socket. The biggest doubt is that the fuse is still good. Various phenomena show that the initial judgment is flawed. After careful analysis, I revised my original view and decided that this was just an open circuit, because the user's insurance may be connected to the zero line, and poor contact of the zero line will produce great resistance, which will gradually burn out and even open the circuit. At this time, the electrical appliance connected between the live wire and the neutral wire is equivalent to a wire, which leads to the potential and the neutral wire is charged, but the electrical appliance does not work. Oh, I see. A simple open circuit problem has been successfully solved.
Two heads are better than one. When you encounter problems at work, one more person will have one more idea and many more ideas, which is convenient for finding and solving problems as soon as possible.
At the end of the article, I would like to thank many masters and colleagues for their support and help, because with them, my work will be better and faster, and I will feel the unity spirit and the strength of mutual cooperation of our team. With this spirit and strength, I have reason to believe that our tomorrow will be better!
Half a year's work summary of the monitor of electrical operation 4 Time passed quickly, and in a blink of an eye, another year passed. Looking back on the work in the past year, under the direct leadership of the General Management Section and with the efforts of all members, the water, electricity, broadcasting, monitoring and other equipment in the whole market operated normally and safely, and successfully completed this year's work tasks, which are briefly summarized as follows:
First, unite sincerely, overcome difficulties and successfully complete the transformation of the market power supply network.
1. With the development of the market, this year's power supply transformation is the top priority. After hard work, the members of the whole group cooperated with the department to complete the addition of 1000KVA box transformer 1 at the beginning of the year; New and modified 10 kV line 2.4 12 km, new and modified 12.832 km low voltage project, laying 270 meters of high and low voltage copper core cable; Six new steel poles. At the same time, complete the construction of cooling facilities (roof insulation layer, water spray cooling) in the east-west distribution room in the market during the hot summer to ensure the smooth operation of power supply equipment.
2. Due to the prosperity of the market, the number of applications for installing air conditioners has increased sharply during the peak period of high-temperature electricity consumption in summer. Regardless of rest and morning and evening, the whole group completed the addition of each group of air-conditioning main lines and installed 167 air-conditioning household lines.
3 to ensure the normal operation of the street lamp system, monitoring and broadcasting system in the whole market, and timely adjust and install the street lamps in the area. Adjust the control of night monitoring light source, and the image achieves the expected effect.
4. Assist the construction unit to transform the shoe material market line in southern Zhejiang; Timely deal with the line and electrical equipment failures of the state, local tax, promotion office and other related units.
Second, implement the responsibility for production safety.
1, department leaders put safety in production first, and Wang told them repeatedly at the regular meeting every morning. In particular, Engineer Wang Heye personally inspected and supervised various production tools, and promptly destroyed tools with serious defects and damages. No personal injury, power grid, equipment, fire and other accidents occurred throughout the year.
2. In mid-June, in order to ensure the safety and quality of electricity consumption during the peak period of high temperature, the Ministry arranged a system of special personnel on duty for the east-west power distribution room and box-type power distribution room, promptly eliminated equipment failures, and recorded equipment operation every hour to ensure the reliable operation of each circuit.
Third, seriously carry out inspection work.
1. Conduct routine inspection of market water and electricity every day, and handle the situation in time if found. Daily maintenance of the market is more than 870 times.
2. Cooperate with the comprehensive management department to check the market production and fire safety day and night. Timely rectification of matters with hidden dangers of hydropower.
3. Cooperate with the management of the first branch and the second branch, and do a good job of checking the indoor meter box, electrical equipment and lines in the shopping mall. About 400 households without meter boxes and meter boxes have been rectified, effectively preventing potential safety hazards caused by aging meters, equipment and wires.
4. Regularly inspect the market timing power-off control system, street lamps and radio monitoring system every Friday, and make inspection records. Find abnormal situation, adjust and deal with it at any time, and report to the department leader in time.
5. Regularly check the market water supply pipe network, timely repair the aging and man-made damaged water supply faucet, fire hydrant and broken pipe to prevent the market from dripping and leaking. Cooperate with departments to test the pressure of fire pipes.
6. Before each typhoon comes, conduct a comprehensive inspection of the power supply network, telephone poles, cables, outdoor billboards, electric shutter doors and drainage pipes in the market. In order to plan ahead.
Fourth, fully cooperate with equipment maintenance and strengthen equipment maintenance.
1. In order to meet the needs of market development, the center invested heavily in adding 1000KVA box transformer, which was officially put into use on June 9. In the process of use, the corresponding rectification measures are given in view of the existing defects (low voltage, deviation of grounding wire resistance, line adjustment and shunt, etc.). ) to achieve performance.
2. Combined with the opportunity of market power consumption in the trough period, overcome difficulties and shunt power supply. In mid-June, 1 1, all equipment was overhauled, pre-tested and eliminated in turn. The equipment maintenance of the East-West Power Distribution Room cooperated closely with the construction personnel, and completed the switching operation, safety measures arrangement and on-site safety supervision and management of the power transmission equipment. Among them, three main transformers are replaced by aging high-voltage oil-resistant sealing rings, low-voltage end conductive tubes and insulating porcelain bottles. Replace 8 disconnectors (600a) for the low-voltage cabinets in the east and west power distribution rooms, the main cabinet DW 10 circuit breaker (200a)1set, 5 axial flow fans, 5 capacitor switching contactors and sporadic accessories. At the same time, the base, pull rod and box surface of some corrosion equipment in high pressure chamber were treated with anticorrosion. Operation of single equipment, power switching, cleaning and maintenance, and equipment acceptance after maintenance.
Five, do a good job in the work of the whole group, the establishment of water and electricity, radio, monitoring files.
1. In July this year, under the guidance of this department, the Hydropower Group conducted a thorough inspection of the hydropower meters in the whole market, and replaced the bad and dead meters in 198 households. It is required to copy the electricity (water) on the market once a month, and record the capacity, number of meters and each copy of each household in the file.
2. Copy the total water meter at 13 in the market, the active and reactive power meters of the east-west distribution room and the spacer transformer every month, and register and file the data every time.
3, completes the power supply equipment maintenance, annual inspection report. Establish a special account for major equipment, and record the maintenance items, models and quantities of replaced equipment and materials, and the operation of the equipment after maintenance.
4. Manage the electrician warehouse. Regularly declare the material consumption and list the materials in and out of the warehouse, ensure a certain inventory of commonly used spare parts, and register the materials in the place of use.
Sixth, the existing shortcomings.
1, need to strengthen safety awareness (especially their own safety).
2. Strengthen the sense of responsibility.
3. Strengthen the study of professional knowledge. The new members are not familiar with the operation process and market outlook of the distribution room, especially the distribution of branch lines and lack of daily maintenance experience.
4. Strengthen the management of commonly used tools and materials.
The above is the summary of the work of the electrician group throughout the year. In the coming year, I hope you can give us some valuable suggestions, so that we can improve ourselves in the future development and make some contributions to the development of the market.
Summary of six months' work of electrical operation monitor 5 Looking back on the past year, I have many feelings and gains. For me, 20xx years of work is unforgettable and deeply branded. The change of work content and responsibilities is accompanied by a series of adaptation and adjustment of work ideas and methods, including adaptation at work and adjustment in mentality. Stress brings a sense of fatigue, and fatigue melts into the joy of harvest. Under the leadership of two Wu Jingli Valley managers, with the support of the conductor and with the close cooperation of all comrades, I love my job, fulfill my duties, have a pragmatic style and a firm mind, and have successfully completed the work of the electrician class and other tasks assigned by the leaders.
Develop your own work guide:
1, so that every job is operated according to the safety standard process to prevent safety accidents;
2. Arrange personnel to patrol the equipment and find that the problems that can be solved on the spot can be solved directly, and the problems that cannot be solved can be fed back to the department leaders in time, so as to do the work that needs to be done in the shortest time, find it in advance and solve it quickly, and nip in the bud;
3. Plan and prepare materials in advance for the circuit transformation of large-scale equipment to ensure high-quality and efficient completion of the work without affecting production;
4, for sudden problems of power facilities, first telephone communication, preliminary estimate where there is a problem, arrange relevant personnel to prepare related objects and tools, so as to quickly troubleshoot after arriving at the scene;
5. Adhere to the principle of economy: try to repair the equipment that can be repaired, and don't replace it with a new one. Collect the replaced ones for reuse.
Strengthen the image and improve their own quality. We should correctly understand work and value, correctly handle the relationship between gains and losses, personal interests and collective interests, adhere to professionalism, honesty and dedication, strive to make progress in our work, study hard to look up information, earnestly learn the strengths of others, get rid of our own shortcomings, consult leaders and colleagues humbly, and improve ourselves and our team.
Strengthen study, be brave in practice, absorb all kinds of "nutrition" extensively, and strive to cultivate their own theoretical basis, thinking methods, correct ideological views and pragmatic work style. Strive to do a better job and establish a good image of the electrician team. )
In order to do a good job in team management and maintenance, our hospital adheres to strict requirements, sets an example, treats people with sincerity, loves their posts and respects their work, and strengthens team management. Carry out team work seriously every day, arrange the maintenance tasks and work of team members reasonably and humanely, and ensure the safe operation of equipment. The team members are required to strictly abide by the company's rules and regulations and strictly implement the correct safety maintenance operation procedures. In terms of daily training, our team strictly implements the spirit of departmental instructions, regularly organizes team members to summarize this week's work, and passes on, helps and leads new employees in the daily work of the team through training to improve the overall theoretical knowledge and practical technical level of team members. Form a good operation mode for team members to make progress together. Every month, we also organize various "safety learning materials" to improve the safety will and sense of responsibility of team members and ensure the safety maintenance of personnel and the safe operation of equipment.
Be strict with yourself, make a good maintenance plan, and constantly strengthen the construction of work style. Over the past year, I have been strict with myself, always taking plain, willing to pay and obscurity as my own criteria, and always focusing on rigor, meticulousness, sureness and hard work. In the work, regulate all your words and deeds with systems and disciplines, strictly abide by the company's rules and regulations, respect leaders, unite with comrades, be modest and prudent, take the initiative to accept opinions from all sides, and constantly improve your work; Insist on doing things that are not conducive to Yuchang and actively maintain the good image of the team company.
Strengthen functions and do a good job in service management. Strive to improve the management and maintenance level. Electricians are short of manpower and have a heavy workload, which requires the unity and cooperation of all our staff. In this year, no matter what difficulties we encounter, we actively cooperate with the equipment maintenance. Colleagues can think in one place, work hard in one place, no matter how much they do, and only hope to finish their work smoothly.
Shortcomings in the work and the direction of future efforts
Deficiencies. The degree of ideological emancipation is not enough, learning and service are not enough, and there is still a certain gap with our own goals. There is still a lack of extension of deep excavation in management, team management is not in place, and some equipment is not really known. As a result, the cable of No.2 bridge crane broke this year, which led to the main fall tripping. 20xx working prospect.
1, enrich yourself, improve yourself, continue to lead the team members to learn professional technical and cultural knowledge, check the equipment and facilities one by one with more professional technical knowledge and more serious work attitude, do daily maintenance and planned maintenance well, and avoid accidents caused by hidden dangers.
2. Cooperate with the user department to formulate the procedures for using electric energy more reasonably, and check and supervise; Continue to improve belt equipment.
3. Obey the leadership arrangement and do your job without hesitation. Finally, I thank the leaders for their trust in me and let me be the monitor of the electrician class. Next year, I will complete my job with more enthusiasm and full working status, and escort the safe operation of the company in return for the concern and support of the leaders.
;