Fence billboard construction program
I have done 10 meters

6 meters high

Directly with the 110 round tube

You can

12 * 12 square tubes or

10 * 10 can also be a wall must be thick to reach a minimum of 0.28 millimeters, that is, how to say 3 of them.

3 meters or 4 meters a column

Columns under the soil mix 40 * 40 * 50 deep pier, and then welded above the iron plate is best to play directly into the buried parts. You can also hit the concrete when

6 meters under the column welding point of steel, directly loaded inside.

10 of the welded steel can be

Standing column

1.2 meters behind the column

In a pier

Windy

Pier on the big

Also in the middle of the two columns in the middle of the fight

Used to weld

The diagonal braces,

Finally in the middle of the diagonal braces flat

The diagonal braces,

Finally, a flat one in the middle of the diagonal braces

A flat one in the corner of the ground

At least you have to use angle iron

The one in the footer can be pressed against the earth with a forklift

If you use a 50 channel steel

The weld can be more solid.

Billboards with angle iron circle

In the middle of the number of 30CM within the welded square tube

4 * 4 can be, and then directly behind the 60-100CM directly long welding

Don't cut off the welded plane, that will be soft,

Finally, the color of the steel with a 16CM

Small screws directly on the kind of dovetail, 20CM interval can be.

Finally, the colorful steel skin will be put on the dovetailed screws directly with 16CM

.

Finally, the sign is lifted by a crane

Welding U-shaped card with angle iron

Welding

Quickly

Just welding fixed.

Inclined pull brace can be to the sign stand two

Hurry pull two. It is not cost-effective to use people to stand the sign

It takes 4-6 people to lift it

It is also not very safe.

Lastly

Square tube

There is a flat surface on the outside

The billboard is sandwiched between the posts. It can be

Or it can be welded to the outside. It seems to be better sandwiched in the middle

, I use round pipe

3 meters between the columns

welded to the outside, 2 years

still good.