So what are the conditions for declaring Huangshan Cup? The following is the content of Huangshan Cup registration conditions compiled by Zhong Da.
Declaration conditions
The project to declare the "Huangshan Cup" award shall meet the following conditions:
First, it conforms to the statutory capital construction procedures, the national mandatory standards for engineering construction and the provisions of joint, energy saving and environmental protection.
Two, the project design is reasonable and advanced, in line with the requirements of urban planning, special planning and relevant national technical standards, and complete supporting facilities;
Three, to declare the "Huangshan Cup" award projects should be included in the city or the industry (department) for the "Huangshan Cup" award projects. The process control should be strengthened for the projects included in the plan to create the "Huangshan Cup" award, and the quality supervision and inspection of the projects created by the "Huangshan Cup" award should be summarized according to the documentNo. [2004]4 1 of the Construction Management Department and reported to the Provincial Construction Industry Association.
The recommended units will submit the registration form (Annex 2) of the "Huangshan Cup" Excellence Award of the city or industry (department) to the Anhui Construction Industry Association for the record, and the Anhui Construction Industry Association will propose the recommended number of cities and industries (departments) to declare the "Huangshan Cup" Award according to the completion of the total output value of the construction industry in each city in the previous year, the excellence plan and implementation of each city or industry (department), and the number of award-winning projects in the past two years.
The construction site of the declared project should actively create safety and quality standardization demonstration sites.
The project to create the "Huangshan Cup" award should be evaluated as an excellent project according to the current national, industrial and local standards or enterprise standards.
Four, the project has been completed and accepted according to the relevant provisions of the state and this province, and the completion acceptance filing procedures have been handled in accordance with the regulations.
Five, obtain the municipal or provincial (inclusive) professional department quality engineering certificate, engineering quality reached the advanced level of similar projects in the province;
Six, the declaration of the project should be completed before the end of last year, after the use of winter and summer inspection, no quality defects and quality hazards and did not change the original design purposes without authorization, and the technical indicators and economic benefits reached the advanced level in the province;
Seven, engineering quality supervision units and provincial city quality supervision institutions (professional engineering quality supervision institutions recommended by professional departments) agreed.
The main organizer to declare the "Huangshan Cup" award shall meet the following conditions:
(a) Contractor means an independent legal entity that has entered into a contract with the applicant;
(two) in industrial construction projects, it should be the installation unit that undertakes the main production equipment, pipelines, instruments and meters, or the construction unit that undertakes the main factory building and the main buildings and structures related to production;
(three) the construction unit that undertakes the main project and the main part project in transportation, water conservancy, municipal administration, garden and other projects;
(four) in the housing construction project, it should be the construction unit that undertakes the foundation and the main structure.
Industrial, transportation, water conservancy, municipal and other professional projects are contracted by more than two construction enterprises, and different contracts are signed with the construction units respectively. The workload of the participating enterprises is above 20%, which can be declared by the construction unit or by the participating enterprises.
There shall be no more than three main contractors applying for the "Huangshan Cup" award, and the following conditions shall be met:
(a) housing construction projects, the main contractor refers to the unit that undertakes equipment, electrical installation or major decoration projects, and other projects refer to the unit that undertakes major supporting projects.
(2) For the project declared by the construction unit or all participating construction enterprises, the construction and installation workload completed by all participating construction enterprises shall exceed 20% of the total project investment; For the projects declared by the construction enterprises themselves, the construction and installation workload completed by the contractors shall not be less than 65,438+00% of the total project investment.
(three) the quality of the completed unit project or division project has reached an excellent level.
The supervision unit applying for the "Huangshan Cup" award should be a third-party supervision unit with corresponding qualifications selected in accordance with the relevant provisions of the Bidding Law.
If a quality accident with a loss of more than 654.38+10,000 yuan or a large-scale or above production safety accident occurs during the construction of the project, the "Huangshan Cup" award shall not be declared;
Construction enterprises punished by qualification degradation shall not declare (or participate in the declaration) the "Huangshan Cup" award within two years.
For more information about architectural awards and qualifications of construction enterprises, please visit the Zhong Da Consulting and Construction Link.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.