First, how to construct aluminum ceiling
1. First install the cover panel: Before installing the cover panel, all kinds of pipes in the ceiling must be inspected and accepted, and it is not allowed to install the cover panel until the pressure test is qualified. There are many kinds of ceiling cover panels, and the types, specifications and fixing methods should be clearly selected in the design documents. There are three ways to fix the cover panel and the light steel skeleton: self-tapping screw fixation of the cover panel and bracket fixation of the cover panel.
2. Secondly, the self-tapping screw fixing method of the cover panel: it is also necessary to pay attention to the light steel skeleton that has been installed and accepted. According to the specifications of the cover panels, drawn gaps and block elastic lines, a row of cover panels are installed from the middle of the ceiling with the long keel direction as the benchmark, and then extended to both sides. Cementing and cementing method of cover panel: Cementing material can be selected according to the design requirements and the variety and material of cover panel, and generally 4000 can be used.
3. Finally, each cover panel should be installed when it is bonded, and then glue should be applied to the bottom of the keel frame at the pre-installed position, which is also helpful for our construction. At the same time, glue should be applied around the cover panel within the range of 10 mm ~ 15 mm, and the cover panel should be glued to the pre-assembly position after 5 minutes. Each ceiling starts from the middle row and then sticks to two branches. Vertical to the long keel, block and block the keel line. The installation of the cover panel starts from one end of the row keel in the ceiling, and then the long-grade keel on the other side is installed. Finally, adjust the T-shaped keel with branch cables.
Second, the aluminum gusset ceiling matters needing attention
1, pay attention to the installation sequence when decorating, so as to ensure our effect. When installing the aluminum gusset ceiling, fix the hose flue of the range hood in the kitchen, determine the position of the range hood, and then suspend the ceiling; The bathroom should be equipped with a yuba and an exhaust fan first, and then the ceiling should be suspended. Be sure to line up the pipes of Yuba and gas water heater first.
2. There is also the need to pay attention to the size of installation. Before installation, tell workers the location and size of lights, yuba and exhaust in advance so as to fully understand. So as to determine the open position. Yuba keel should be installed by yourself, or a simple wooden frame made by yourself. It is necessary to pay attention to the depth of drilling. Light steel keel should be used for the square plate, aluminum keel or galvanized keel should be used for the slats, and the direction should be according to the survey construction drawing to prevent damage to the wire tube and waterproof layer.
3. Finally, it is necessary to pay attention to the keel spacing. It is also basic to arrange the keel according to the size of the gusset plate, with a spacing of 50 ~ 60 cm. The derrick is not more than 30cm away from the end of the main keel, otherwise it should be protected from falling. At present, we should pay attention to the thickness of aluminum ceiling. Many families have a misunderstanding about the choice of aluminum ceiling. Simply think that the thicker the aluminum is, the longer the service life will be, and too thick aluminum ceiling may also lead to unqualified aluminum ceiling.
The above content is introduced by Bian Xiao, the steps of aluminum gusset ceiling construction, so that when we decorate, it will be carried out in order to give us a good decoration.