Current location - Recipe Complete Network - Catering training - Typhoon emergency plan
Typhoon emergency plan

About Typhoon Emergency Plan (General 6 articles)

In the school or society, sometimes there will be some unexpected accidents, in order to avoid things worse, always inevitably need to prepare an emergency plan in advance. How to prepare an emergency plan? The following is my collection of emergency plans on typhoon (general 6), welcome to learn and reference, I hope to help you.

Typhoon emergency plan 1

In order to effectively do a good job in the town of xx xx hazardous rock body unstable slopes and half of the mountain hazardous rock body unstable slopes of geologic disaster point prevention and control, maximize the reduction of accidental disasters, to avoid the masses of personal safety and property losses, now combined with the actual situation of our town, we have developed the following emergency rescue plan.

A disaster point situation

(a) xx dangerous rock body unstable slope

xx dangerous rock body unstable slope is located in the town of Liyang Longshan Temple back of the mountain, the top of the mountain there are a few bumps of dangerous rock, affecting the safety of the Longshan Temple people and property. In the event of prolonged heavy rainfall may occur landslides, in the event of prolonged heavy rainfall timely notification of the evacuation of people in the Longshan Temple.

(B) half of the mountain dangerous rock body unstable slope

half of the mountain dangerous rock body unstable slope is located in the town of Liyang Xiaolongshan south, the half of the mountain is almost vertical, the surface of the surface of a lot of raised rock, very easy to fall, dangerous rock near the Huangshan City Special Police School and residential houses. In case of prolonged heavy rainfall may occur landslides. The first thing you need to do is to get a good look at the color of the skin and the texture of the skin, and the color of the skin.

Second, the emergency work leading group

Leader:

Deputy Leader:

Members:

Third, the response and action of the emergency

(a) Emergency personnel

Detecting people:


Contact person:

Transfer personnel:

(B) emergency response team:

(C) emergency material reserves

The town's main flood control and disaster relief materials: 12 sets of raincoats, 12 steel helmets, folding rechargeable recording shouting microphone 4, shovels 10, sacks 100, a number of sand. The above flood control materials stored in the town apparatus room, by comrade Lin Tianyou unified deployment.

(D) Emergency Response:

1, the town flood control and disaster relief leading group held a meeting to urgently inform the jurisdiction of the disaster and relief work, analyze and predict the possible emergence of larger disasters, the deployment of the jurisdiction of disaster relief work. Immediately the jurisdiction of the disaster and disaster relief work reported to the district people's government and the district flood control and drought relief headquarters, requesting support from the district government.

2, the organization of the town staff according to the degree of urgency of the flood season, the use of telephone, cell phone text messaging, shouting microphone and other means of flood information to inform residents in a timely manner; special emergency situation or power supply, communication interruptions, divided into households to notify the residents of disaster-prone points, especially at night when the relevant disaster may occur, to ensure the reliability of information transfer, so as not to omit a household, not to omit a person.

3, emergency personnel according to their respective job duties and tasks, received a disaster weather forecast, to be on standby at all times, not to go out, received a collection of orders, should be rushed to the designated location within 15 minutes, in accordance with the command of the rescue organization.

4, the release of the disaster. The town command office to summarize the disaster, reported to the district flood control and drought relief headquarters.

Fourth, the post-disaster relief work

1, timely production and life of self-help work conference, quickly organize the restoration of production, life and other work.

2, seriously organize the work of disaster investigation and verification, focusing on the verification of the disaster caused by the collapse of the house, especially the total collapse of households and other special victims of the loss.

3, according to the verification of the disaster, the development of disaster relief programs, step by step implementation.

Fifth, the basic requirements of flood control and rescue work and work discipline

1, the leading group of flood control and disaster relief office in the implementation of flood control during the twenty-four-hour duty system. Strict work discipline, conscientiously make a good duty record, timely reporting down. Command members in the flood control period, if there is something out of the need to leave the local, must be approved by the unit principal, and arrange for their own responsibility within the scope of the flood control work.

2, the person in charge of flood control and disaster prevention work is responsible for, must ensure that the phone is open 24 hours a day, the arrangements for the jurisdiction of the duty duty, supervise the duty record, duty handover and other work, found that the danger should be reported within 30 minutes, shall not be delayed rescue work.

3, where the flood duty and flood rescue and relief work, negligence, irresponsibility, reporting delays or personnel are not in place in a timely manner, we must seriously investigate the responsibility of the relevant personnel; caused serious consequences, the main responsible person shall be held accountable according to law.

Typhoon emergency plan 2

A rainy season construction emergency plan

1, the organization of the establishment of the rainy season construction organization

In the rainy season construction time, the Ministry of the project and the project's various construction sections of the sub-district organization to set up a leading group of flood control and rescue and relief team. Pay attention to the weather forecast and take precautions. If there is any danger, immediately organize rescue, try to minimize the loss, and can resume production in the shortest possible time.

Flood control leading group is headed by the project manager, the rescue and relief team is headed by the deputy project manager, and the members include personnel from various departments and offices of the project department.

2, flood control system during the rainy season

(1) Strengthen the contact with the weather station, pay close attention to the weather conditions during the rainy season.

(2) During the rainy season, the work shift is set up on duty, 24 hours on duty, and found that the unexpected situation immediately reported to the members of the leading group of flood control.

(3) during the rainy season construction, strengthen the inspection of various flood control facilities and equipment, timely detection of problems, and immediately deal with them, to eliminate hidden dangers before they occur, to ensure construction safety.

(4) when it rains, set up a person to monitor the construction site and the surrounding pipeline, drainage system, found that the problem must be immediately reported to deal with.

3, rainy construction pre-control measures

(1) rainy construction should be done to prevent rain, lightning, electricity, flood control and other work.

(2) Before the rainy period construction should be based on the rainy period construction project to prepare rainy period construction measures, the required materials should be prepared before the rainy period construction.

(3) to do a good job of construction personnel of the rainy construction training, organize the relevant personnel to carry out a comprehensive inspection of the construction site preparation, including temporary facilities, temporary power, machinery and equipment and other items of work.

(4) check the construction site and production and living base of the drainage facilities, dredge all kinds of drainage channels, clean up the rainwater drainage outlets, to ensure that rainy day drainage.

(5) anti-rainstorm measures: after receiving the rainstorm forecast, promptly cover the construction materials and materials, machinery and equipment, electrical equipment, etc., in order to ensure that they are not drenched and soaked by rain. When the rainstorm occurs, immediately stop all concrete construction, lifting operations, welding operations and other dangerous construction operations; construction vehicles suspended; cut off high-voltage power supply, shut down the site power generation, electricity equipment.

(6) rainy season lightning protection measures: the field area power station, power house and other mechanical equipment in the lightning strike area are installed lightning protection facilities to prevent lightning damage to equipment, injury to personnel. Lightning protection facilities should meet the requirements of relevant regulations and be inspected regularly. When lightning appears, immediately stop the field electrical equipment operation, welding operations and other dangerous construction work.

Second, the typhoon construction emergency plan

1, be prepared

typhoon season at any time to be ready to prevent typhoon attacks. Set up a person to pay attention to the weather forecast, make a record, and keep in touch with the city weather station, in case of weather changes in a timely report, in order to start emergency measures in a timely manner.

2, the establishment of the typhoon team

The establishment of the typhoon rescue and relief team, personnel and division of labor in principle with the leading group of typhoon storm prevention, and equipped with about 20 people of the rescue team, all members pay close attention to the scene of the dynamics of emergencies, immediately put into the scene of salvage, so that the loss of the minimization of losses.

3, reasonable arrangements for construction during the typhoon

scientific, reasonable arrangements for construction during the typhoon, when the wind is greater than 6, stop the outdoor construction operations, advance arrangements for the rainy period of construction of the various sub-projects, so as to be prepared.

4, temporary facilities typhoon measures

The construction site offices, canteens, warehouses and other pro-establishment works should be a comprehensive and detailed inspection, such as tie not secure, poor drainage, leakage, subsidence, deformation and other conditions, immediately take measures to strengthen the treatment, the problem is serious suspension of use. After the typhoon, the organization is ready to check, found problems, focus on repair.

5, the construction site typhoon measures

Before the arrival of the typhoon, the towering independent machinery, scaffolding, and unloaded steel, templates, etc. with cables, rebar, wire, etc., temporary reinforcement, stacked on the floor, the roof of the small machinery and equipment, sporadic materials stacked and reinforced, and can not be fixed all the things to be moved to the building.

6, hoisting machinery typhoon measures

Hoisting machinery to stop working before the typhoon, tower crane hook, and will turn the brake release, so that it is in a free rotary state; working at height in a timely manner withdrawn to the safety zone.

7, after the typhoon in time to deal with measures

Immediately after the typhoon, the organization of personnel sub-specialty, sub-parts of the template, steel, especially scaffolding, power lines for careful inspection, found that the problem is dealt with in a timely manner, agreed to by the person in charge of the site and reported to the A party, the supervisor of the site engineers to approve the resumption of work.

Typhoon emergency plan 3

First, the guiding ideology:

Typhoon, rainstorm prevention work is related to the lives of teachers and students and national property safety is an important work, in order to effectively protect the safety of teachers and students and property safety, to enhance the kindergarten flood control and typhoon prevention ability, in line with the "prevention-oriented, safety first" principle, the development of this plan.

Flood and typhoon prevention and control

These measures are designed to prevent flood and typhoon damage.

Second, preventive steps:

1, the leading group list and contact phone number

Leader: the head of the school

Members: logistics team leader

nursery school director

union chairman

Kindergarten started the Taiwan flood control plan, the implementation of the 24-hour leadership, 24 duty system. 24 duty system.

Third, emergency measures:

1, to strengthen information communication, to do the top of the situation, the bottom of the report.

In the event of a major flood, all the leaders into place, the flood control work leading group began to operate; the leaders in charge of the flood control work leading group to report on the flood; the full deployment of anti-Taiwan flood control work.

2, prevention-oriented:

Clear corridor. Before the typhoon landed, the balcony, corridor debris, flower pots, etc. should be cleaned up to prevent the typhoon landed, was blown down by the wind to hurt people.

Close the doors and windows. When a typhoon or rainstorm comes, the wind and rainfall are large, so you should close the doors and windows to prevent the wind and rain from damaging the doors, windows, furniture and causing casualties.

The janitor of the whole school sewer and the main catchment well to carry out a comprehensive dredging.

Unclogging of gutters and downpipes on school buildings and houses, and pruning and strengthening of large trees throughout the school.

A comprehensive safety check of lightning protection facilities and outdoor wiring on all school buildings.

Comprehensive safety inspection of outdoor antennas, air conditioning outdoor units, and external hangings.

Indoor power supply, sockets, doors and windows of all departments to do a comprehensive inspection.

When circuits and wires are interrupted due to a typhoon, power switches should be turned off and emergency lights, torches or candles should be activated.

Fourth, safeguard measures:

After the plan is activated, the kindergarten to do a good job of early warning and information records. Convene an emergency meeting, in the shortest possible time, by telephone and other forms of kindergarten flood control and Taiwan work deployment, inform the Taiwan flood dynamics, the arrangement of flood control and Taiwan, rescue and relief requirements and tasks.

At any time with the higher departments and units to maintain close contact, strengthen information communication, to do the upper situation, the lower situation reported.

Typhoon emergency plan 4

First, the establishment of anti-gale, rainstorms and other inclement weather emergency leading group

Second, the guiding ideology:

In order to establish the school safety emergency response mechanism, rapid, timely and actively carry out the work of all dispositions, minimize the Losses, effective protection of teachers and students and school life and property safety, and effectively maintain educational stability and social stability.

Third, the emergency plan

(a) typhoons, thunderstorms and other inclement weather before

1, pay attention to the weather forecast, always pay attention to typhoons, thunderstorms and other unusual weather trends, at any time to the whole school teachers and students released typhoons, thunderstorms and other unusual weather conditions (Xu Jia responsible).

2, strengthen the inspection to eliminate potential safety hazards (Ma Dongyun responsible).

3, close the doors and windows, balconies, window sills, roofs and other high places easy to fall off or reinforced

① supervised by Yu Fang, ② teacher's office by the week administrative duty is responsible for supervision, ③ teaching building by the Chen Mei is responsible for supervision.

4, classroom teachers to strengthen the education of students against typhoons, rainstorms, lightning and other abnormal weather knowledge (each classroom teacher is responsible for).

(B) specific measures to prevent typhoons, thunderstorms and other inclement weather

1, encountered the end of class, should be delayed, by the then classroom teachers to contact the classroom teacher **** with the responsibility to maintain order in the classroom students, when determined that the weather improves before the end of class.

2, if the end of the school day, typhoons, thunderstorms and rain still do not stop, the school allows parents to enter the class to pick up their children in an orderly manner, the classroom teacher should be in the class and do a good job of signing the parents. (Administrative duty and duty teachers are responsible for supervision)

3, students encountered thunderstorms and other inclement weather on the way out of school or on the way out of school, they should look for shelter nearby, and wait for the weather to improve before going home or going to school, and, if possible, contact their parents or classroom teachers beforehand (reminded of the students in advance by the classroom teachers).

4, at home when not in school, such as typhoons, thunderstorms, students can postpone the school time until the weather improves, parents can contact the class teacher specific matters (class teacher phone number so that each student knows), the class teacher and the students to school situation reported to the school safety and security office. (Yu Fang is responsible for)

5, if there are students in school, the administrative duty week to arrange for the care of students to school. Let the students enter the house to take refuge and limit the activities of the people in the safe area.

(1) Students should follow the principle of sheltering in the vicinity of the nearby shelter.

(2) Each classroom teacher is responsible for maintaining the order of the students in their respective classes.

6, buildings in typhoons, rainstorms and other inclement weather tilting, cracking, should immediately organize the evacuation of people to safety (school playground), Li Jianliang is responsible for the staff of the cafeteria.

7, in the event of a holiday typhoon, thunderstorms, school team members immediately in place to do a good job of school buildings and the surrounding exhaust and other work.

8, rainstorms and other inclement weather coming throughout the period, the school administration on duty and duty teachers, security should be constantly patrolling the campus, dredging drains, if found dangerous, immediately report to the commander-in-chief for emergency treatment.

9, in torrential rain and other inclement weather there are dangerous, to immediately cut off all power supplies in the school (Ma Dongyun is responsible for).

10, if someone is injured, immediately sent to the health center for treatment or call 120 hospital (Tao Yueqin is responsible for).

11, not scheduled for the task of the teacher should be in the office standby, not to leave the school.

(C) after the typhoon, thunderstorms and other severe weather

1, further inspection of the campus, timely detection of potential safety hazards, and to be timely eliminated (Yu Fang, Chen Mei is responsible for).

2, statistics of damage (the director's office is responsible for) reported to the relevant departments.

Fourth, the work requirements

1, the ideology should attach great importance to the spirit of responsibility for all teachers and students, to overcome paralysis and laxity, the thought of carelessness, seriously make all the preparations;

2, the work should be implemented, the division of labor responsibilities are clear, the material reserves in place;

3, the organization should be Coordination is strong, to ensure the smooth flow of orders.

Typhoon contingency plan 5

In order to do a good job of typhoon prevention, now the "Grand Hotel typhoon contingency plan" re-revised issued, please follow the implementation of the hotel.

First, the organization and responsibilities

The hotel set up a flood and typhoon emergency command, the typhoon came when the command of the various organizations members must immediately do a good job in the hotel flood and typhoon response and duty. The organization is as follows:

Commander-in-chief: hotel executive general manager

Deputy commander-in-chief: the hotel in charge of security work of the chief assistant

Member units: guest rooms, catering, front office, engineering, security, finance

Second, typhoon procedures

(a) Typhoon before the self-inspection Preparation

1, the front office: the collection of the main entrance banner and the main entrance of the lanterns and other decorations and POP notice boards; lobby or elevator entrance placed typhoon information notice boards, and ready to typhoon reminder card to the Department of Rooms with the room; ready to prepare umbrellas and rain gear, every employee in the front office should be aware of the typhoon information, and timely answer the guests inquires, ready to the front desk emergency lighting, the lobby associate should be fixed in the lobby The lobby assistant should be stationed in the lobby, do a good job of customer inquiries and pay attention to the door and the lobby of the situation reported in a timely manner, to ensure that the normal business order of the front office.

2, Rooms Department, Food and Beverage Department, Finance Department: check the closure of each room, box, aisle and hallway doors and windows; do a good job on the guests of the typhoon notification Rooms Department should be the typhoon reminder card into the room; prepare emergency lighting;

3, switchboard: responsible for understanding the typhoon situation in a timely manner to report to the leadership of the hotel and the relevant departments responsible for the preparations of the emergency lighting, walkie-talkie, and to check the switchboard Backup power supply is normal operation, and under the guidance of the department manager to do a good job in the power outage emergency services, and do a good job of the guest's inquiry service.

4, each department should be prepared 1 day in advance to report the loss of fabrics, in order to emergency use.

5, by the Engineering Department of the hotel perimeter, platforms, neon lights, billboards, satellite receivers, business departments and tenants of the doors and windows of a comprehensive inspection with wire, rope, stakes and other reinforcement of the unsound suspension should be temporarily removed. Check the underground electric room machine room and other important parts, do a good job of reinforcing the hotel door, and cut off the possibility of short-circuit triggering a fire in the circuit, the pool should be filled with water to ensure that the hotel's normal supply of water, electricity and gas, ready to prepare enough . Sandbags.

6, the general office is responsible for the typhoon information conveyed to all employees in all departments, and arrange for all department heads to stay on duty.

7, the security department notified the dormitory security guards to prepare for duty, and with the engineering department to check the hotel periphery, roof and other key parts of the sewer, gutter is smooth, prepare lighting appliances and rain shoes and raincoats, safety helmets, flashlights, emergency lights, and so on.

(b) Review: by the General Office, the Engineering Department, the head of the Security Department in accordance with the above provisions of the preparations for the review of the various departments.

(C) when the wind is strong should start emergency procedures:

1, the security department, the engineering department responsible for the hotel should stay at the hotel at any time to deal with emergencies, to ensure that enough manpower and material resources to do a good job of repair and remedial work.

2, guest rooms, private rooms, cloth, liquor, food warehouse if there is water seepage, the department should immediately transfer the contents of the room to a safe place, the Ministry of Engineering to do a good job of plugging the leakage and drainage work.

3, the front door of the rain may backflow into the lobby, the security department, the engineering department will sandbags piled up at the door to prevent the inflow of PA class is responsible for additional manpower to remove the water.

4, the back door of the rain may be backed up into the staff elevator, the security department, the engineering department will be sandbags piled up in the back door to prevent the inflow of the back door post security guards are responsible for the removal of water, such as rain has been backed up to the elevator, the engineering department should immediately control the elevator in the floor above the 1F, prohibit elevator operation to -1F-2F.< /p> 5. /p>

5, the wind is very strong, the front door and the back door should take wood plugs, boards reinforcement, in order to prevent the glass door is blown by the wind, reinforcement should be appropriate to retain part of the glass door open, in order to reduce the resistance of the wind on the glass door, the glass of the front door by the baggage handlers and the security department foreman *** with the care. The back door glass is guarded by the security guard at the back door.

6, when the wind is very strong, the gate post security guards baggage handlers should pay attention to falling objects and guide the guest vehicles parked in the underground garage, if necessary, wear a helmet, the front office should be placed on the front desk desk lamps, flower pots, etc. put away, so as not to be blown over.

7, if there is water in the elevator, the engineering department should immediately start the drainage system to remove the water, in order to avoid if the wind is strong, resulting in the passenger elevator can not run, the restaurant screen should be pushed to the elevator entrance to cover.

8, when encountering a power outage, the Engineering Department immediately contacted the property office to generate power to restore lighting. The Security Department maintains the hotel security order during a power outage. When the power outage restaurant cashier by the restaurant management personnel responsible for in place to guard, the main desk cashier by the Security Department front door post and 02 or 01 guard. Lobby assistant, 01, 02 should do a good job of passenger elevator service, check whether the guests were off the ladder, do a good job of being off the passenger elevator guests to appease the work of the floor workers and managers of various departments should be dispersed to the various floors, restaurants to guests to do a good job of explaining and appeasing the work.

9, gutter blockage, by the Ministry of Engineering, the Ministry of Security *** with the people to be sent to unblocking, unblocking personnel should pay attention to their own safety, must wear a helmet, if necessary, should be tied to the safety rope, by two people a front and a back *** with the operation. Attention should be paid to the roof equipment layer of electrical equipment whether there is a leakage phenomenon.

10, the wind is very large, the office should be responsible for notifying the dormitory employees are prohibited from going out, in the store outside of the staff should be arranged to stay in the hotel, the office and the departments responsible for the office should be dissuaded from leaving work employees are not allowed to leave the hotel, the office should be a good arrangement for food and accommodation for the employees who are stranded.

11, the switchboard is responsible for understanding through the TV, timely report to the head of each department of the typhoon situation, such as airports, highways, bridges closed information should be reported to the front office in a timely manner, the front office should be timely to the guests of the hotel notice.

12, the typhoon larger hotel executive general manager, engineering manager, security manager, should stay in the hotel to make emergency preparations, other department managers whether to stay in the hotel should be based on the hotel arrangements, such as leaving the hotel should be reported to the hotel executive for approval.

(d) After the typhoon has caused the loss of the hotel, each department should be summarized within two days to report the loss.

Typhoon contingency plan 6

The coastal belt is a typhoon prone areas, I construction unit to ensure the safety of the construction workers, to ensure that the enterprise's property is not lost, so the construction site to make the following measures to prevent the typhoon:

a. Early deployment:

1, in the receipt of the typhoon forecast to deploy immediately to prevent the typhoon measures;

2, timely communication to all employees of the superior typhoon prevention notice, so that employees understand the movement of the typhoon and the arrival time.

Second, the organization of the inspection:

1, organized by the project department of the typhoon prevention team to carry out a comprehensive inspection of the construction site, to ensure that nothing is wrong;

2, each team carefully check the stacking of all kinds of construction materials solid, slightly doubtful place to clean up and rectify;

3, the frame workers class the overall performance of the outer frame and the rigidity of the outer frame and the building. Performance and rigid connection between the outer frame and the building to carry out a thorough inspection, and immediately rectify the existence of places with potential safety hazards.

4, the construction site professional protection team on the protection of the shed reinforcement treatment, specific reinforcement measures for the setting of scissor braces and wire pulling the corners of the protective shed fixed to the ground.

5, tower crane operators in the typhoon before the arrival of all lifting work to stop, the position of the boom and fixed point according to the crane's operating procedures.

6, the electrician in the typhoon notification, immediately after the construction site laying circuit wires to check the placement of the electric box is firm and reliable, there are hidden safety hazards in the place of immediate rectification, and in the typhoon before the arrival of cut off all the construction of electricity, typhoon, after the typhoon, first of all, the circuit wires of the construction site inspection, to confirm the normal before sending electricity.

7, when the typhoon comes, living quarters closed all doors and windows to ensure the safety of workers.

Third, the leadership attention:

The project organized by the Ministry of leadership team members on duty all night, configure the necessary communication equipment (such as walkie-talkies), to facilitate emergency mutual contact.

Fourth, emergency rescue:

1, emergency rescue personnel should be trained and necessary drills, master the rescue action methods and skills and precautions, familiar with the unit's safety production, master emergency rescue equipment, equipment performance and use.

2, equipped with the necessary emergency rescue equipment, equipment.

3, the rescue team during the typhoon 24 hours a day standby, the occurrence of accidents in a timely manner to deal with.

V. Start the plan:

The establishment of the typhoon emergency response team, to facilitate the timely handling of the problems arising in the process of typhoon prevention, to reduce unnecessary losses.

;