In July, 1990, Wenzhou Airport was officially opened to traffic.
In August of 20001year, Wenzhou civil aviation station was renamed as Wenzhou Yongqiang Airport.
In March 2002, Wenzhou Yongqiang Airport was officially listed.
On June+10, 2008, the new terminal of Wenzhou Airport was put into use. The new terminal building covers an area of 22,530 square meters, with 7 security check-in passages, 26 check-in counters, 4 new boarding bridges and expanded apron, which can meet the passenger throughput demand of 7 million years.
In September 2009, the municipal government formally submitted a request to the provincial government to expand the opening of Wenzhou Airport to foreign aircraft. On February 29, 2009, at 65438, the expansion project of Wenzhou airport flight area was officially launched. It is planned to build a new runway with a length of 3,200 meters and a width of 60 meters on the east side of the existing runway at the airport. At the same time, the existing 2400-meter runway will be extended to the south by 800 meters and transformed into a parallel taxiway. The new runway and parallel taxiway have been put into use.
wenzhou longwan international airport
On March 20 10, the Nanjing Military Region approved the opening of the airspace route of Wenzhou Airport.
On April 20 10, the provincial government submitted a request to the State Council for instructions on developing foreign business at Wenzhou airport.
On June 20 1 1, the State Council approved the upgrading of Wenzhou Airport to a first-class port, allowing foreign aircraft to open.
On 201111/the T2 terminal of Wenzhou airport and the comprehensive transportation hub project officially started, with a total investment of more than 6 billion yuan and a construction period of 4 years. The designed passenger throughput can reach130,000 passengers. It can meet the take-off and landing requirements of Airbus A340 and Boeing B747-400 series passenger planes. After the completion of Terminal T2, Terminal T 1 will be transformed into an international terminal.
20111February, the Supervision Department of the General Administration of Customs approved the establishment of an international mail exchange station at Wenzhou Airport.
20111February, direct passenger flights from Wenzhou to Taiwan Province Province were approved.
20 12 On March 25th, Huaxin Airlines opened a route from Wenzhou to Taipei Songshan, and Wenzhou became a direct cross-strait city.
On 20 12 1 month, the navigation information of Wenzhou Airport was released.
On February 20 12, Wenzhou airport was officially opened to overseas airlines.
20 12 On July 24th, Wenzhou Airport officially passed the national acceptance and was fully open to foreign aircraft.
20 12 On August 20th, Jeju Airlines opened the chartered flight route from Wenzhou to Jeju Island, becoming the first foreign flight to Wenzhou Airport.
On March 4th, 20 13, China Eastern Airlines opened a direct flight to Bangkok, Thailand, which was the first international scheduled flight in Wenzhou.
On March 20 13, the National Civil Aviation Administration approved the application for renaming Wenzhou Airport.
On May 20 13, Wenzhou Yongqiang Airport was renamed as Wenzhou Longwan International Airport and officially listed.
On 20 13 12.24, China Eastern Airlines opened a direct flight to Rome, Italy, which is the first regular intercontinental route in Wenzhou.
20 14, 14 On February 30th, the construction of three major projects, namely, Wenzhou Airport Transportation Hub Complex, S 1 Line Airport Section and New Freight Zone, was announced.
2065438+On May 20th, 2005, the general aviation base started construction.
Current equipment and facilities
Wenzhou Longwan International Airport currently covers an area of 4 182 mu, with a fire protection grade of 8 and a flight zone grade of 4E. It has a runway 3200 meters long and a parallel taxiway 3200 meters wide. It can take off and land 28 times during peak hours, which can guarantee the take-off and landing of A330-200 and below, and can meet the annual passenger throughput150,000 person-times. The total area of the terminal is 36,500 square meters, including 23,000 square meters for the domestic terminal and 1.350 square meters for the international terminal. The apron covers an area of/kloc-0.54 million square meters, with 25 parking spaces and 8 boarding bridges.
Medium and long-term planning
According to the master plan of 20 13, Wenzhou Longwan International Airport is planned to be a domestic trunk airport and a general aviation base airport in the near future. In 2020, the passenger throughput will be130,000 person-times and the cargo and mail throughput will be 300,000 tons. The long-term plan is to be a large international airport and a general aviation base airport. In 2040, the passenger throughput was 35 million passengers, and the cargo and mail throughput was 6.5438+500,000 tons. The recently planned land area is 989 1 mu, the long-term planned land area is 22,776 mu, and the long-term total control land area is 27,380 mu.