Construction scheme for kitchen renovation:
Kitchen renovation 1: demolition
If it is the renovation of an old house, it is necessary to first remove the original tiles on the wall and ground, remove the ceiling, and remove the original kitchen utensils and lamps; If the new house wants to change the pattern of the original kitchen, it must first face the task of tearing down the wall.
Kitchen renovation II: Waterway circuit renovation
Most people are willing to make waterways and circuits into concealed pipes, because it is more beautiful. Water circuit is a hidden danger project, so it must be safe. Provided by the cabinet designer, sockets should be reserved during the hydropower transformation.
Kitchen reconstruction 3: wall plastering and leveling
After the ground and wall are removed, cement will level the uneven position of the wall, which is beneficial to the next waterproof.
Kitchen renovation 4: waterproof
After the cement is dry, brush waterproof coating on the wall and ground for 2-3 times, and test the water for 24 hours.
Kitchen renovation 5: Tiling
Bricklayer must step on the waterproof ground. Stepping directly on the waterproof layer may damage the waterproof layer and make the waterproof ineffective. When the ceramic tile is pasted to the standard, the empty drum is not more than 5%, and the gap at the diagonal of flat-fell seam between two bricks is not more than 2mm.
Kitchen reconstruction 6: install ceiling, cabinets, lamps, etc.
After plastering the wall tiles and floor tiles, you can ask relevant personnel to install ceilings, cabinets and lamps. .
Matters needing attention in kitchen decoration:
Matters needing attention in kitchen decoration:
Old houses usually have one-way water supply, so it is best to add a hot water pipe when decorating the kitchen. In addition, the general family bathroom is relatively small, and the washing machine can only be placed in the kitchen, which requires an additional water supply pipe and a ground drainage pipe. Need to be reminded that due to structural restrictions, waterway changes can only be changed to water, not water.
Matters needing attention in kitchen renovation 2:
The internal structure of the old kitchen is complicated. In addition to asking cabinet manufacturers to measure the kitchen, it is also necessary to see whether the original positions of various pipes are suitable. If it is not suitable and needs to be changed, a drawing will be submitted to the decoration company, and the construction team will make the necessary transformation according to the drawing.
Matters needing attention in kitchen decoration:
Do a good job of closed water test. Before the renovation of water supply and drainage, it is suggested that the space be tested for water closure before acceptance by the relevant property. If you find water leakage, you can find a property to solve it. In order to avoid leakage after transformation, the responsibility is not clear.
Matters needing attention in kitchen decoration:
Care should be taken in the reconstruction of gas and natural gas pipelines in old kitchens. These two kinds of pipes are generally not allowed to be changed at will. If it must be changed, it must be approved by the property company. When making changes, it is usually a professional company designated by the gas and natural gas company or the property management company, because it is professional and convenient for future maintenance.
Matters needing attention in kitchen decoration:
In the renovation of the old kitchen, it is necessary to move the gas meter from its original position to another wall, and that wall has already installed cabinets, and there is no place to install the gas meter. At this time, you can only make a hole in the bottom plate of the cabinet and hide the gas meter in the cabinet, but in this case, it is difficult to find the problem in time and it is easy to leave a safety hazard.