Current location - Recipe Complete Network - Catering training - Commitment letter of decoration company
Commitment letter of decoration company

Commitment letter of decoration company

In the ever-changing modern society, there are more and more occasions that need to use commitment letters, and in writing, commitment letters have certain writing norms. In order to make it easier and more convenient for you to write the letter of commitment, the following is the letter of commitment for the decoration company that I have compiled for you, for reference only. Let's take a look.

commitment letter of decoration company 1

In order to ensure the life and property safety of the owners and users of Hongfu Building, according to the relevant national fire safety laws and regulations, and combining with the actual situation of the building, a commitment letter of fire safety responsibility of any decoration and decoration company during the construction in the building is formulated:

1. Any unit or individual who needs hot work for decoration and decoration in any part of the building must go through the temporary hot work application procedures in the building property management department.

2. Before construction, the person in charge of the unit undertaking construction hot work must obtain the Temporary Hot Work Application Form from the building security department, fill in the hot work reasons, the starting and ending time and scope of hot work in the decoration construction of hot work parts, and the preventive measures taken, and obtain the Decoration Hot Work Permit with the approval of the building security department, and post this certificate in a conspicuous place outside the decoration unit or the owner's door.

3. Before hot work in decoration construction, carefully clean up the flammable and combustible articles on the site and around, and allocate a certain number of fire-fighting equipment (which can be rented).

4. Before hot work is started on the site, the fire prevention measures on the site must be checked and accepted by the fire chief of the security department of the building before construction.

5. All personnel on the construction site must abide by the Fire Safety Management Regulations of the building, and it is forbidden to use naked flame, smoke or use electricity illegally.

6, in the process of decoration construction, when an accident occurs, measures must be taken immediately to deal with it, and timely report to the building fire safety monitoring center.

7. Any unit or individual who violates the terms of the letter of commitment and causes losses shall be criticized and educated if the circumstances are minor, and fined; if the circumstances are serious, in addition to compensation for economic losses, the legal responsibility of the unit or individual shall be investigated according to law.

Signature of the promisee:

Commitment unit (signature and seal):

Tel:

Date: Letter of Commitment of Decoration Company 2

XX Technology Co., Ltd. hereby solemnly promises that during the maintenance period of this project, the construction coating will not crack (except structural), fall off, fade or powder, and during the maintenance period, the sales department and engineering department of our company will not do anything. In case of product quality or construction quality problems, our company is responsible for free maintenance, and only the cost maintenance is charged for reasons other than our products or construction quality.

The construction of the project and the use of products shall be carried out in accordance with the requirements of the construction plan or product manual, and our company promises that the following problems will not occur:

1. Falling off and cracking; 2. Uneven fading; 3, the famous line pulverization

Our company promises that Xiaguang products can provide good decoration and protective coating for the building surface. Under the premise of strict requirements, the base surface shall be treated correctly and constructed in the way specified by our company.

the quality accidents and losses caused by basic structure factors, human factors, irresistible factors and other abnormal factors (such as improper storage and use) and the users' unauthorized changes in construction methods according to our product construction requirements are not included in this guarantee, and normal wear and scrape outside the warranty should not be regarded as product quality problems. This warranty is valid for the time agreed in the contract.

1. Warranty period and warranty scope

Our company promises that the warranty period of this project is 2 years. In the paint construction of this project, the quality of materials and construction technology provided meets the requirements of relevant national quality and technical standards. In case of quality problems and other circumstances, our company will actively cooperate with you to provide solutions in time and complete the work that needs to be repaired until you are satisfied.

1. During the warranty period, if there are any problems (such as pulverization, serious cracking, peeling, fading, etc.) that are really related to the coating quality, a maintenance plan will be put forward within 14 days, and maintenance will be carried out free of charge.

2. for quality problems (such as interior decoration) not caused by the paint itself, the repair area is small, and the maintenance is carried out free of charge, and the maintenance cost is charged for the larger area.

II. Warranty measures

1. During the warranty period, store the same-quality exterior wall real stone paint so that the construction party and the tenderee can use it for maintenance in time.

2. Establish the project file, provide tracking service within 11 years from the date of completion, and store the selected color of the project in the computer for 11 years, so as to ensure that the color is the same as that of the original wall when repairing.

3. During the maintenance period, the sales department and engineering department of our company will provide you with perfect maintenance, maintenance service and consultation anytime and anywhere.

4. if our company fails to complete the repair work of defective projects within the specified time, or it is proved by the employer in writing that it is unreasonably delayed, the employer has the right to hire other institutions or people to repair and complete the remaining projects. The contractor will be responsible for compensating all the employers for the construction period and economic losses incurred as a result. Commitment letter of decoration company 3

Dear customer:

Hello!

I am the chief designer of xx Decoration Company, and I am glad to serve you. Home improvement is a simple and complicated project. Like you, I work to build your warm, healthy and beautiful home life.

here, I sincerely thank you for your trust in our company and myself. In order to let you enjoy the decoration results with low price, excellent construction and thoughtful service and a happy decoration journey, I would like to make the following commitments on behalf of the company:

1. If your time permits, I will give you a detailed explanation on the popularization of home improvement knowledge, so that you can fully understand the materials, processes, design styles and related decoration common sense of home improvement.

2. In the process of measuring the house on site, I promise that the measurement will be accurate and complete, and the drawing will be rapid and high-quality. I will record your detailed requirements one by one to ensure accuracy. After the measurement of the house is completed, I promise to do a good job of interpreting the house type and drawing for you within 24 hours.

3. After you sign the design agreement with us, I promise to produce a complete set of design renderings within one week.

4. If you are dissatisfied with the design scheme, I promise to make the most perfect adjustment until you approve the design scheme and are completely satisfied with it.

5. Before we sign the home improvement contract, I will explain the Decoration Construction Contract for you in detail until you fully understand it, so as to ensure that our agreement is just, fair and reasonable.

6. After signing the contract, I will provide you with a complete Home Decoration Solution, including a full set of floor plans, renderings, construction drawings, decoration instructions, a pre-arranged schedule of decoration period, home supporting materials, a full set of budgets, etc., so that you can easily handle home decoration.

7. On the day of commencement, I will go to your new residence site to make on-site disclosure with you and the construction workers. I promise to be there on time and make detailed disclosure, so that our project can start smoothly.

8. during the construction process, I promise to accompany you throughout the project acceptance and solve design doubts and construction problems.

9. If you need me to accompany you in purchasing related main materials, I am willing to fully cooperate and make time arrangements in advance, so as to be a good purchasing consultant for furniture, household appliances, lighting, window decorations and indoor accessories, so as to make you feel more at ease when shopping.

11. If you have any other requirements for me or our company, I will try my best to provide you with thoughtful and satisfactory service.

The service is unlimited, and the contents of the above commitments are still limited. To complete the above commitments, I need professional knowledge, good attitude and efficient service quality. I will go all out, please believe me! Let's create a relaxed and happy decoration journey together!

Decoration location:

When I decorate the living room, I and the hired construction unit will seriously abide by the decoration management regulations of the municipal government and the management office. At the same time:

1. Take full responsibility for the quality and safety of decoration, and undertake the responsibility of supervision and acceptance, so as to guarantee a one-year effective warranty period. Only after the renovated room is checked by the management office that there is no illegal decoration or leakage damage, can the decoration deposit be returned, and the employees who are hired will be fined for violation of regulations.

2. Be responsible for the safety of the decorated rooms, the safety of construction workers and the safety of related third parties.

3. Take full responsibility for the behavior of hiring construction personnel to enter the building, including: maintenance of public order and public health, compensation for damage to public facilities and public security responsibility.

4. Fire prevention measures shall be taken from the start of renovation. During renovation, one fire extinguisher shall be provided for every 51 square meters in the renovation room, and at least two fire extinguishers shall be provided for each household; Do not use power in violation of regulations, bury or change wires through pipes to ensure indoor and outdoor safety, and accept the inspection and guidance of management personnel.

5. Do not change the original appearance and public facilities of the house, and do not make holes in the external wall; Do not chisel the beams, columns and plates of the house; Do not dig holes in the load-bearing wall; Do not arbitrarily increase the floor static load (such as building walls indoors, overloading ceilings, installing large lamps, laying marble floors, etc.).

6. Do not change the functions of the kitchen, bathroom and balcony; Make sure that the kitchen and bathroom are waterproof (the owner who makes the waterproof should bear all the losses caused by the leakage of waterproof quality).

7. When the kitchen and bathroom ceilings are used as ceilings, a movable manhole should be left at the cleaning mouth of the sewer pipe; Do not discharge domestic sewage into rainwater pipes.

8. The decoration garbage shall be transported to the garbage station in bags at the specified time, and the stairwell shall be kept clean and hygienic. Do not pile building materials and garbage in public places (including public corridors).

9. Install anti-theft net and security window flower with uniform style, specifications and materials from the management office. And installed in the designated location of the management office; The installation of air conditioning should be approved by the management office.

11. Do not close the front balcony or change the intelligent circuit without authorization.

11. Do not change the gas pipeline without permission, and notify the gas company if it is really necessary to change it.

12. Close the door during the decoration construction to avoid noise and dust flying in the decoration.

13. During the renovation, bottled gas, electric heating rods, electric furnaces and other facilities are not used.

14. assume other responsibilities stipulated in the decoration management regulations.

15. In case of violation of the above provisions, penalties can be imposed according to the relevant provisions of the municipal government and the xx Decoration Management Regulations.

Decoration construction unit: Tel:

Person in charge of decoration: ID number:

Decoration owner/owner's client: Tel:

Letter of Commitment of Decoration Company on

To: Langfang Xinbeichang Market Service Co., Ltd.:

I/the company is a limited company with the brand.

We hereby apply for and solemnly promise as follows:

Our company has received the Decoration Manual of Shopping Mall Counter delivered by your company, and has conducted detailed communication with the relevant departments of decoration management of your company, and is familiar with the management regulations and procedures of the Decoration Manual of Shopping Mall Counter implemented by your company, and promises to abide by all the design and construction regulations and penalty clauses listed in this decoration manual; The related expenses will be paid according to the regulations.

in line with the principle of standardizing decoration management, ensuring construction quality, eliminating potential safety hazards and reducing environmental pollution, our unit promises to strictly abide by the relevant regulations of your company on the decoration management of shopping malls, obey the daily management of the decoration management personnel of shopping malls, accept the supervision of the decoration management and fire safety of shopping malls, and rectify the problems and matters that do not meet the regulations and requirements at any time; At the same time, during the decoration construction, the decoration technology shall be strictly enforced to ensure the construction quality, and the materials shall be environment-friendly and safe, and delivered on schedule according to the decoration completion time stipulated by the mall, and actively cooperate with the decoration acceptance work of the mall, and do well the later improvement and rectification matters, so as to give authorized merchants and your company a satisfactory decoration result. If the construction personnel of our unit violate the rules and disobey the management during the renovation, our unit will accept the handling opinions of your company, and give warning, punishment and even transfer to the relevant responsible persons.

at the same time, the company promises to be fully responsible for all actions of the contractor and its employees, and bear the responsibilities. I hereby promise

company name:

legal representative (or its authorized person):

contact information:

company seal:

date of signing: 21xx x x x

promisee:

letter of commitment of decoration company on 21xx x x x 5

According to the relevant laws and regulations on property management and the requirements of the office building property management office,

1. Do not change the building structure, design purpose and layout without authorization. Please ask for approval in advance if it is necessary to change the direction of water pipes and wires. The internal and external load-bearing walls, beams, columns, floors and balconies of the building are not demolished or built in violation of regulations.

2. Do not occupy or damage public places, places and facilities such as stairs, passages, roofs, platforms, roads, motor vehicle parking spaces and non-motor vehicle parking spaces. Do not damage, dismantle or transform public facilities such as power supply, water supply and drainage, gas supply, communication and fire fighting without authorization.

3. Don't build or paste pictures in disorder. Do not carry out projects that are detrimental to public facilities, and ensure the beauty and unity of property appearance and public decoration.

4. Do not use toxic and polluting decoration materials. Decoration garbage should not be thrown about, and removed from the site in time, and the cleanliness of the office building will not be affected during transportation. The scattered garbage should be cleaned up in time. Construction materials, equipment and construction personnel shall enter the site at the specified entrance and exit. Construction personnel should register for admission every day and do not stay at the construction site.

5. The normal office work of other enterprises will not be affected during the construction. Installation of air conditioners, security window, fans, etc., should first apply to the property management office, and construction can only be started after approval.

6. Bulk materials such as construction waste, yellow sand and cement must be bagged and transported. Passenger elevators are not allowed to transport decoration materials. Damaged public facilities should be compensated according to the price.

7. In case of pipeline blockage, water leakage, power failure, falling and fire alarm, etc. during the construction, public facilities, equipment and other people's interests will be lost, timely repair and compensation will be given.

8. The decoration site must be reasonably closed to reduce dust and noise. Fire and smoking are strictly prohibited in the construction site, and an application should be made to the property management office when welding is used in the construction.

our company has confirmed and guaranteed to abide by the above terms. If there is any violation, the property management office has the right to deal with it and make corrections within a time limit and make mandatory rectification. Including stopping water supply, power supply and even prohibiting admission. Construction can not be started until the shutdown and rectification are completed.

Signature of the promisee:

Commitment unit (signature and seal):

Tel:

Date: Commitment Letter of Decoration Company 6

In order to effectively strengthen the supervision and inspection of performance of duties, comprehensively improve the performance of duties and responsibilities of the municipal decoration industry management office, earnestly safeguard the interests of the masses, and strive to create a development environment with pragmatic style, high quality and high efficiency.