Simple contract for steel reinforcement team contracting
With the enhancement of people's legal consciousness, the legal effect of contracts is increasing day by day, and contracts coordinate the relationship between people and things. So do you know how to write a legal contract? The following is a simple contract template contracted by the steel reinforcement team, which I compiled. Welcome to reading. I hope you will like it.

Simple Contract for Steel Bar Team 1 Party A: (hereinafter referred to as Party A)

Party B: (hereinafter referred to as Party B)

The project of Hudai Industrial Park, Binhu District, Wuxi City (the workshop of Wuxi Huihong Thermal Treatment Co., Ltd.) undertaken by Party A will be contracted to Party B (no handyman will be involved in the construction). Through friendly negotiation between Party A and Party B, on the basis of equality, mutual benefit and friendly cooperation, in order to clarify the responsibilities and rights of Party A and Party B, this agreement is specially formulated for both parties to abide by. The specific terms are as follows:

I. Project name:

xxxx

Second, the project site selection:

Xinmin Road, Xushe Town, Yixing City

Three. Scope of contract:

All construction contents of steel bar fabrication and installation project within the scope of construction drawing (including steel bar fabrication and installation of all ancillary works such as outdoor septic tanks and structures). All drawing changes and technical changes during and before construction may be changed at any time, and these changes have been included in the contract scope.

Iv. contents of the project:

Yixing safety civilized construction site

1, steel bar batching lofting, calculation and material analysis, material storage, make full use of short steel bars over 800 mm

2. 170m and 80m round steel straightening, cold drawing and binding, horizontal transportation (incomplete here, modified according to the contract).

3. Installation and drawings include fabrication and installation of embedded iron parts (civil parts).

Five, the project contracting way:

This project adopts the contract construction form without materials (i.e. quality, progress, material saving, safe and civilized construction, and this project has no work).

Six, quality requirements:

Strictly require the construction according to the drawings, meet the design and specification requirements, and the quality grade must meet the qualified requirements. The quality acceptance and evaluation of steel bar works shall be based on the contents specified in the quality inspection and evaluation form of steel bar binding (welding) subentry works and the corresponding instructions (attached with the contract).

Specific requirements:

1, the specification, shape, size, quantity, spacing, anchorage length and joint position of reinforcement must meet the design and specification requirements.

2. The number of missing buckles and loose buckles in steel bar binding shall not exceed 10% of the number of tied buckles, and shall not be concentrated.

3, steel binding joint lap length is not less than the specified value, steel joints should be staggered, steel should be straight, no local twists and turns, plate steel binding must play line.

4. The cold-drawn rate of rolled steel bars shall be controlled below 4%, and the diameter of bending center shall be strictly controlled (the first-grade steel bar shall not be less than 2.5d, the second-grade steel bar shall not be less than 4d, and the bending center shall not be less than 5d).

5. The number of stirrups, hook angle and straight length meet the requirements.

6, reinforced row spacing deviation control in 5mm, reinforced bending starting point is only less than 20 mm. ..

7, stirrup, structural steel binding skeleton spacing control in 20mm, welding skeleton allowable deviation control within+/-65438 00 mm. ..

8. The center line displacement of welded embedded parts shall not exceed 5mm, and the horizontal height difference shall be controlled at 5 mm. ..

9. Allowable deviation of reinforced protective layer: the foundation is controlled at10mm, the beam-column is controlled at 5mm, and the wallboard is controlled at ±3mm. ..

10, steel welding must be crack-free, steel bar without obvious burns. Meet the requirements specified in the rebar welding specification.

1 1, strictly control the height of beam stirrup according to the relationship between primary and secondary beams, strictly control the height of horse stool according to the thickness of plate and the size of reinforcement, pay attention to the encrypted column hoop at beam-column joints, and control the clear distance between the first row of reinforcement and the second row of reinforcement with thick and thin reinforcement.

12. Rachel reinforcement, constructional column reinforcement and lintel reinforcement of the wall shall be embedded in strict accordance with the drawing requirements, and encryption hoops and steel hanger shall be set for the main beam at the junction of primary and secondary beams.

Seven, the construction period:

1, Party B's construction must meet the needs of flow operation, complete the progress plan of the project department on time, and shall not delay the construction time of other teams due to its own reasons.

2. The construction time for each layer of fabrication and installation of steel bars is 2 days (calculated by acceptance), and 200 yuan will be fined for each day of delay.

3. Party B must obey the arrangement of the site foreman, and if not, the foreman has the right to punish the team.

Eight. Payment method:

1. RMB will be paid by each person for the capping of the three-story roof of the main structure, and 70%-80% of the engineering quantity will be paid at the end of the year, and the workers' wages will be paid in full to ensure that there will be no trouble because the workers' wages are not in place, and the balance will be paid at the end of the following year.

2. If the project schedule and construction quality fail to meet the requirements of Party A due to Party B's reasons, Party B will automatically quit.

3. If Party B fails to fully perform this contract, which leads to the termination of the contract halfway, it will be settled according to 80% of the actually completed engineering quantity, and Party B will automatically quit.

Nine, project management responsibilities:

A. Party A's responsibilities

1. Provide effective construction drawings and joint review records, and timely send written materials of engineering contact list and design change notice as the construction basis.

2. Be responsible for providing Party B with detailed safety education on concealed objects disclosure, technical disclosure, technical specification guidance and construction safety disclosure, and timely solving the problems existing in the drawings.

3, equipped with vertical transportation-tower crane.

4. Be responsible for reviewing the list of reinforcement materials provided by Party B, and timely and quantitatively purchasing all kinds of steel to the construction site.

5. Provide construction water, electricity, night construction lighting and temporary accommodation for field workers.

6. Improve scaffolding and safety nets.

7, responsible for steel processing and binding quality tracking inspection, supervision, responsible for the quality evaluation and acceptance of steel subdivisional work.

8, coordinate other types of work, try to avoid rework and repair caused by poor cooperation.

9. Pay the progress payment as agreed in the contract.

B. Party B's responsibilities

1, before construction, you must be familiar with the mandatory provisions of drawings and specifications, and make safety technical disclosure to workers. Skilled workers should account for more than 80%, and special types of work must be operated with certificates, and workers should be well informed of construction quality and safety technology, and regular education and learning should be carried out.

2. Obey the command of Party A's construction management personnel and strictly abide by Party A's relevant project management system.

3. The person in charge of Party B must stick to the site, arrange the work, direct and manage, and lead its employees to carry out the construction according to Party A's requirements and relevant construction safety specifications, and ensure the quality and quantity according to the progress requirements. All losses and adverse social impacts caused by poor management shall be borne by the person in charge of Party B, and Party A has the right to terminate the agreement if it has not been improved after three times of pointing out.

4. Party B shall assign a full-time quality and safety manager to cooperate with the site construction.

5, responsible for the installation and debugging of steel processing machinery, cold drawing machine, butt welding machine, etc. , and send a licensed person to be responsible for the boot.

6. Read the drawings and related design changes carefully, calculate the bill of materials for reinforcement, formulate the preparation plan, and submit it to the reinforcement foreman of Party A for review before implementation. Assist the warehouse keeper and foreman of Party A to receive the goods after the materials enter the site.

7. Calculate the engineering quantity according to the drawings, strictly control the material consumption, use the bill of materials at the site of steel bar blanking, make reasonable ingredients and use materials reasonably. If waste of materials is found during construction, Party A has the right to punish the team and deduct it from the living expenses.

8, according to the optimization principle of long before short, long and short, carefully analyze the ingredients list before blanking, strictly speaking, the steel loss rate is controlled within 2%-4.5%.

9, each kind of processed steel bar must be hung up, and carefully stacked neatly according to the principle of convenient access.

10, during concrete pouring, arrange the steel bar worker to work on duty to ensure that the wall column steel bar does not shift.

1 1, in the process of construction, responsible for the construction quality, time limit for a project and the quality review of completed subdivisional work.

12. In the process of construction, if any design problem of drawings is found, it shall be reported to the builder of Party A in time, and the design shall not be changed without authorization, and the reinforcement shall not be replaced without authorization.

13. Cooperate with Party A in sampling and inspection.

14, closely cooperate with other teams for cross-flow operation, and do not deliberately make things difficult.

15, civilized construction, do a good job in construction organization and management, steel processing site and binding site must be cleaned after each layer of work, responsible for cleaning up the garbage transferred to the template, and the remaining waste should be collected in piles in time and classified according to the principle of orderly.

16. Protect the finished products before acceptance, and Party B shall be responsible for the damage and decoration expenses.

17. During the construction, Party B shall be responsible for all safety accidents (including third parties) caused by its own reasons or illegal operations.

18. If the project progress and construction quality can't meet the requirements of Party A due to Party B, Party A shall settle the accounts according to 80% of the actual quantities, and only pay the workers' travel expenses after settlement, and settle the accounts at the end of the year.

19. All construction contents of this project, as well as any agreement or contract signed between Party B and a third party, shall be the responsibility of Party B, which has nothing to do with Party A. ..

X. engineering change

1. If there is any design change or technical change, which leads to the increase or decrease of engineering quantity, Party B must report it to the project department in the form of on-site visa in time for review, and it will take effect after it is approved, signed and sealed.

2. If the original contract terms can't be described because of the increase of construction projects or the great changes in construction contents due to changes in drawings, a supplementary agreement shall be signed through consultation.

3. The construction period is postponed. If Party A fails to provide the site, construction conditions, drawings change information, water and power cuts and other irresistible natural disasters, it may apply for a time-limited extension visa.

XI。 Warranty liability:

During the quality and warranty period, if Party A notifies Party B not to make rectification within a time limit, Party A will ask others for warranty, and the expenses will be deducted from the balance.

Twelve, reward and punishment system:

1. Party B must obey the management system of Party A's site. When entering the construction site, it is required to wear safety helmet, and slippers are not allowed. The dormitory should have a sound system of safety, fire prevention, theft prevention and hygiene. Offenders will be punished according to Party A's relevant system and deducted from the project progress payment.

2. The construction quality of this project must be qualified. For example, a single project will be evaluated in stages according to the payment method, and can only be accepted after passing the third-level inspection and evaluation by Party A..

3, column wall beam slab reinforcement in formal concealment acceptance, failed to pass smoothly at a time, which led to the delay of concrete pouring time, and 200 yuan was fined for each floor and each water section.

4. On the basis of the steel bar clamp table, the steel bar is used reasonably and planned, and the steel bars of various models and specifications are not cut at will, resulting in excessive waste of materials. Offenders will be punished according to the seriousness of the case, with a fine of more than 100 yuan each time.

5. If the root of the lintel dowel of the building wall column runs out of the chalk line after pouring concrete, it will be fined 1 root 100 yuan. (that is, each steel bar is offset by 2/3)

6, civilized construction, use should be unified pile up, use in a planned way, shall not be casually misplaced, abandoned, offenders once found each fine 50 yuan.

7. In case of quality accidents caused by unauthorized changes or blind construction, Party B shall compensate for the economic losses caused by labor, materials and construction period, and impose a fine above 500 yuan.

8, after ripping, if there is a lack of protective layer exposed, 50 yuan will be fined every time.

9. After the completion of the project, when the total loss of steel bars exceeds 4%, Party B shall bear all the material costs of the excess.

10. Anyone who fights, fights, causes trouble or slanders others at the construction site will be fined 500-2,000 yuan each time, and those with serious circumstances will be handed over to the public security organs for handling.

1 1. In case of progress delay or quality problems of steel bar processing and binding, the project department will give a certain amount of fine according to the seriousness of the case and deduct it when paying the progress payment.

12, dormitory wiring is not allowed, use high wattage electrical appliances.

Signature of Party A:

Signature of Party B:

Date:

Simple Contract II for Team Contracting of Reinforcement: (hereinafter referred to as Party A)

Contractor: (hereinafter referred to as Party B)

Through negotiation between both parties, Party B is entrusted to construct the steel bar fabrication and installation project of * * Mountain Project. In order to clarify their respective rights, responsibilities and obligations, both parties have reached the following contract terms, which shall be kept by credit:

Article 1: Project Overview

1. Project address: Air Force Real Estate Administration.

2. Project name: guest house, comprehensive building and canteen.

3. Contract form: all machines, tools, wires, iron wires for binding steel plates, cutting pieces, electric welding, secondary handling, etc. from covered electrode and the steel bar processing plant to the installation site. A single contractor is required to produce and install reinforcement (electroslag pressure welding, flat welding and vertical welding are carried out at the same time).

Article 2: Method of settlement:

The production and installation of steel bars are priced by tons, in which the shear wall is used as the basement, with a 600 yuan per ton. More than 0 (including 0) is 750 yuan, including electroslag pressure welding.

Article 3: Method of payment:

Party B shall pay 80% of the completed project amount every month, 95% after capping, and the remaining 5% shall be paid two months after the completion and acceptance of all projects.

Article 4: Time limit requirements

The construction period shall be carried out according to Party A's requirements and relevant team procedures. Party B must complete the construction within the time limit specified by Party A. The installation time of foundation slab and ground beam in each construction section is days, and the column wall includes vertical welding days and beam slab days. Every time the above time exceeds 1 day, a fine of more than 1 ,000 yuan will be imposed (but the bottom and top of the first construction will be increased by 1 day).

Article 5: Engineering Quality Requirements

Party B must carry out the construction according to the requirements of design drawings and specifications, and the quality requirements meet the above standards. If Party B fails to meet the quality requirements, Party B shall be responsible for the cost of rework. If it is found that there are insufficient on-site personnel, Party A has the right to deduct 1000 yuan in cash and leave the site to do engineering work without settlement.

Article 6: Party A's responsibilities

Be responsible for the construction arrangement, cooperate and coordinate the construction work such as team connection and handover, and now provide the setting place of water, electricity and equipment, but the team must cooperate with each working procedure.

Article 7: Party B's responsibilities

1. Party B must abide by this contract, local construction discipline and safety operation regulations, and first conduct safety education for personnel entering the site. The expenses of safety accidents caused by Party B's illegal operation shall be borne by Party B, and Party A shall not bear any responsibility. If Party B finds any potential safety hazard, it shall report it to Party A in time .. Party A shall rectify it in time to ensure safety first and production safety.

2. The reinforcement materials used by Party B shall not be wasted, and the end of the surplus material shall not exceed 50CM, otherwise the waste of the extra-long part shall be borne by Party B (the covered electrode welding team shall be responsible for the excess of 50CM).

3. After the installation of each layer of steel plate is completed, the useless steel bars shall be cleaned at the production site, otherwise Party A has the right to send someone to clean them, and the expenses shall be borne by Party B. ..

4. It is forbidden to drink, fight, gamble and fight on the construction site. If similar phenomena are found, both parties will be fined 1000 yuan each time. Medical expenses caused by disability shall be borne by both parties (each person must have a copy of ID card. Send two photos to the project department).

5. If the relevant departments need all kinds of personal certificates, Party B must provide them, and Party B's construction personnel at the site must do their own "three treasures" safety protection work. If my sister is found wearing a helmet or slippers at work, she will be fined 50 yuan every time.

6. Party B must cooperate with Party A's on-site management mode, and all items on the site shall not be taken out of the site without consent. If it is found, it will be fined 100- 1000 yuan each time.

7. As for the workers' on-site electricity consumption, the company stipulates that only lighting can be provided, and cooking tools such as electric stoves, electric cookers, electric frying pans and electric boiling water are strictly prohibited, otherwise a fine of 100 yuan will be imposed each time, and it will be confiscated. Party B must abide by it.

8. Party B's on-site personnel must obey the command and arrangement of Party A's on-site management personnel and abide by the on-site rules and regulations.

9. If Party B withdraws during the construction, Party A has the right to refuse to confirm the completed workload and investigate the losses caused thereby.

Party A and Party B shall jointly abide by this agreement, which shall have legal effect from the date of signing by both parties. Matters not covered in this agreement shall be settled by both parties through consultation. This contract is made in duplicate, one for each party.

Signature of Party A: Representative of Party B:

Project supervisor: ID number:

Year, month, sun, moon, sun.