2. The contents filled in the declaration form are basically the main building materials, such as wall materials, floor materials and top materials.
3. It is necessary to prepare an overall fire acceptance drawing of the decoration site.
4. It is necessary to prepare the floor plan, electrical diagram and fire control reconstruction diagram of the specific construction site.
5. The local fire brigade will conduct on-site inspection within 10 working days and put forward written opinions. If you agree, you can start work; If you don't agree, you need to modify the office decoration plan.