Current location - Recipe Complete Network - Catering training - Dusty slogans on the construction site
Dusty slogans on the construction site
This paper introduces the establishment of civilized construction site, the implementation of dust control and the beautification of the construction site environment. I hope you will like the following propaganda slogans about dust control.

The first slogan 1, cool spring breeze, autumn wind blowing gently, dust-proof in the heart. Pay attention to development, pay attention to actual effect, wealth and health are very important.

2, fire, explosion and dust, peace of mind.

3. Create a civilized construction site, implement dust control and beautify the construction site environment.

Don't let the dust fly all over the sky. Cleaning the city is everyone's responsibility.

5. Care about dust prevention and return your fresh air.

6. Dust prevention is everyone's responsibility.

7. Care about dust control and build a beautiful environment.

8, care for the environment, do not create dust.

9. The site environment needs everyone, and dust control depends on everyone.

10. Advocate green travel and enjoy a low-carbon life.

1 1. Reduce coal use and promote clean energy.

12. Optimize the economic structure and improve the ecological environment.

13. Control air pollution and improve air quality.

14. Beautify the living environment and build a green home.

15. Clean up the pollution with heavy punches and realize the dream of blue sky.

16. Strengthen the supervision of construction dust and actively promote green construction

17. Control oil fume pollution and protect residents' physical and mental health.

18. Accelerate the elimination of backward production capacity and force industrial transformation and upgrading.

19. Carry out cleaner production in an all-round way and vigorously develop circular economy

20. Improve urban air quality and create an ecologically livable city.

The second part of the measures (1) to implement the effective dust prevention measures.

In the whole process of building construction, special attention should be paid to the control of dust control scheme, bare area coverage, dust control education, vehicle in and out washing, material stacking and coverage, etc. , focusing on the implementation of dust control and safeguard measures at all stages of construction, so as to achieve comprehensive management, combination of prevention and control, scientific management, treating both the symptoms and root causes, and ensuring that the impact of construction dust is controlled to a minimum.

1. For the exposed ground in the construction area of the building project, the construction unit shall take measures such as temporary greening, net and film covering to prevent dust.

2. The construction site of the construction project shall specially set up a centralized stacking site for construction waste and engineering muck, and complete the removal within 48 hours. Dust-proof measures such as enclosure and covering shall be taken for construction waste that cannot be removed on time, and dust-proof measures such as solidification, covering or greening shall be taken for earthwork that cannot be removed on time.

3. The construction site of the construction project shall be specially equipped with cleaning personnel, who shall be responsible for the washing, cleaning and cleaning of vehicles and sidewalks; The entrance and exit of the construction site should be equipped with vehicle washing tanks and high-pressure washing equipment. Two-stage sedimentation tanks must be set next to the washing pool, and washing sewage shall not be directly discharged into urban sewers and rivers. The rear fender of the transport vehicle should not be too high, and it must be cleaned before leaving the vehicle to ensure that the wheels and body are free of mud, and a vehicle cleaning account should be established; If it is verified by the supervision organization that it does not meet the conditions for setting up the washing table, other washing methods shall be adopted, and measures such as laying sacks and arranging cleaning personnel to clean them in time at the entrance and exit of the construction site shall be taken to avoid polluting urban roads.

4. The building materials and tools of the construction project must be placed in the position determined by the layout of the construction site, and the building materials that are easy to generate dust such as cement and lime should be covered tightly or stored in warehouses and pools; Dust-proof measures such as covering, sealing and sprinkling must be taken for materials that are easy to produce dust on the construction site.

5. The construction site of the construction project shall be provided with a continuous enclosure around the construction site, without gaps, with the bottom closed and without mud leakage; Fence enclosure should be firm, stable, clean and beautiful. The enclosure height of urban primary and secondary roads, scenic areas and bustling areas should be no less than 2.5m, and the enclosure height of general sections should be no less than1.8m. The enclosure should be made of hard materials such as masonry and metal plates. The outer side of the enclosure should be beautified or afforested with public service advertisements and publicity slogans. And all kinds of billboards that do not have the function of closed enclosure shall not be used instead of enclosure; It is forbidden to pile up bulk materials such as soil, sand and gravel and scaffolding steel pipes, templates, bamboo pieces, etc. Near the inside of the fence.

6. Ready-mixed concrete and ready-mixed mortar shall be used in construction projects. Bagged cement, on-site mixing of concrete and mortar are prohibited, and mixers shall not be used in construction sites, except for special cases filed with the municipal bulk cement management institution according to law.

7. During earthwork operation, in case of dust, water spraying and dust suppression measures should be taken to minimize the dust operation time. The weather forecast wind speed reaches 6 or above, and no construction shall be organized without taking dustproof measures.