Job responsibilities of the project manager
Part of the job responsibilities of the project manager 15

In our daily life, we gradually realize the importance of job responsibilities. Job responsibilities refer to the specific work content, the responsibilities of workers, reaching the standards required by superiors and completing the tasks entrusted by superiors. There are many points for attention in formulating job responsibilities. Are you sure you can write it? The following are the job responsibilities of the project manager that I have sorted out, which are for reference only and I hope to help you.

Responsibilities of project manager: 1 1. Responsible for the overall work of the engineering department, organize and supervise the personnel of this department to complete their jobs.

2, responsible for establishing and perfecting the corresponding system and process of project management.

3. Be responsible for the early operation and bidding of the project.

4. Be responsible for the preparation work before the project starts, formulate the work plan of the development project from the start to the completion, and organize the implementation.

5. Guide the project implementation, supervise and inspect the project quality, progress, payment, acceptance and other work in the whole process of project site construction, and coordinate the external working relationship among the construction unit, supervision unit and design unit.

6. Be responsible for drafting agreements, contracts and reports on customs clearance projects.

7. Cooperate with all procedures required for the project.

8, complete other work assigned by the leadership.

Responsibilities of Project Manager 2 1. Formulate departmental workflow and management system, and be responsible for the internal affairs management of the engineering department.

2. Organize and implement the training for project managers and all kinds of workers, and make training plans to ensure the effect.

3. Be responsible for the engineering quality, time limit for a project, increase or decrease projects and safety management of the company and all its construction teams.

4. Be responsible for the implementation, supervision and management of the company's engineering marketing.

5, responsible for the company's engineering complaints, to ensure that customers are satisfied with the project.

6, master the decoration engineering construction technology, technology and operation method, the construction project inspection, monitoring and acceptance methods, in strict accordance with the national and local decoration engineering quality acceptance standards for engineering construction and inspection of each link.

7. Assist in the archives construction of all projects, so that all projects are well documented.

Responsibilities of the project manager 3 1. Be fully and specifically responsible for the work of the engineering department and participate in the decision-making on major issues of the company.

2. Be responsible for the overall planning of the project, and manage the construction and quality of the project.

3. Be responsible for guiding, training, supervising, organizing and managing the engineering team of all employees in the Engineering Department, so as to improve the quality, ability and work efficiency of engineering personnel.

4. Be responsible for monitoring and approving the related expenses of the engineering department.

5. Deal with the relationship with the contractor and do a good job in the later stage of construction.

6. Hold a departmental meeting once a month to conduct PDCA management for the department; Hold an engineering situation analysis meeting once a month to formulate and adjust the construction plan.

7. Responsible for solving major problems within the department, make a written report on each work every month, and draw up the work plan for next month.

8. Assist the general manager to achieve the current business objectives of the enterprise.

Responsibilities of project manager 4 1. Under the direct leadership of the general manager, lead all employees of the engineering department to implement the rules and regulations related to engineering energy management and strive to complete the annual objectives and tasks.

2. Establish and improve the operation and operating procedures of engineering equipment, ensure the normal operation of the equipment, and provide quality services and a good working environment for the guests.

3. According to the operation requirements of the hotel system in different seasons, formulate and modify the operation budget of the engineering department, and strictly control the operation and maintenance costs of the project.

4, according to the requirements of the hotel, establish and formulate a comprehensive maintenance plan, so that it can be carried out successfully.

5. Analyze project quotation, organize discussion and decision-making, inspect, evaluate and accept completed projects, and make daily maintenance work satisfactory.

6. Regularly check the energy consumption of water, electricity, gas and hot water in each system of the hotel to ensure that the energy consumption index does not exceed the maximum limit, and propose rewards and punishments to the Human Resources Department.

7. Closely track and control energy, make consumption records and statistics, and provide energy-saving measures.

8. Be responsible for the performance evaluation of engineers (supervisors) and foreman in the engineering department; Work with human resources department to select and interview new employees for engineering department.

9, responsible for the establishment of engineering responsibilities.

10, responsible for establishing and perfecting the departmental training plan to ensure that the employees of the engineering department master the necessary technologies and skills.

Job responsibilities of the project manager 5 1. The project manager is the authorized representative sent by the enterprise legal person in the construction project, and is fully responsible for the project on behalf of the enterprise.

2. Abide by the policies, laws and regulations of the state and local governments, implement the company's rules, regulations and instructions, and be responsible for inspecting labor service companies. Perform the project contract and written commitment on behalf of the company, and strive to complete the business contract signed between the project department and the company.

3, set up a project management team, determine the scope of responsibilities of each post, and formulate assessment tasks to ensure the realization of the goal. Put an end to eating and getting cards, and be fair and just.

4. Organize the preparation of the construction organization design, determine the safety and quality objectives and corresponding control measures, and formulate the general schedule and phased schedule.

5, according to the contract requirements and instructions from superiors, to ensure that the construction personnel and equipment in place in time, to do a good job of material supply.

6, in-depth construction site, found the problem, solve the problem, deal with all kinds of contradictions in time.

7. Do a good job in the basic management of the project, ensure the accurate and timely transmission and feedback of all kinds of documents, materials, data and other information, and make the project settlement in time.

8, do a good job in talent training plan and talent echelon construction.

9, pays special attention to the safety in production, to ensure that the enterprise assets intact, to ensure the personal and property safety of employees.

10, organize on-site regular meetings and related meetings.

1 1. Do a good job in site management and spiritual civilization construction of the project, and strengthen democratic management and ideological and political work.

12, after the completion of the project, do a good job in asset liquidation and liquidation of creditor's rights and debts in time.

13. Within the total salary set by the company, formulate the income distribution plan for the employees of the project department.

14, within the scope of the main materials used in the construction project and under the premise of engineering quality assurance, formulate the specific performance salary distribution scheme for the employees of the project department.

15, the project payment shall be paid by the project manager according to the completion of the construction project.

16, organize the signing of labor contracts and submit them to the company for approval and filing.

17. according to the quantity analysis sheet provided by the operation department, sign a contract for material supply plan with the company to specify the supply quantity, specification, model and date.

18. Supervise the labor service company to pay workers' wages on time every month, and give feedback to the company in time.

19, responsible for the training and education of project personnel and workers of labor service companies.

20. Sign a lease contract with relevant leasing companies on behalf of the project department, specify the lease materials, the standards for using the lease materials, the lease term, and determine the payer of the lease fee.

Responsibilities of the project manager 6 1. Responsible for the preparation of the project implementation plan, the formation of the project team and organize the implementation;

2. Be responsible for the whole process control of quality, schedule, cost, safety and risk during the project implementation;

3. Be responsible for training the engineering personnel in the company's relevant project management system;

4. Go deep into the construction site, master the quality, progress and image of the project, be responsible for supervising the implementation of contract standards, and strictly implement acceptance specifications and quality verification standards;

5, responsible for the performance appraisal and evaluation of the engineering department; Coordinate the internal and external affairs of the project department, including the inspection and evaluation of suppliers and outsourcing teams.

Project manager 7 job responsibilities 1, responsible for the overall management of the work of this department, conscientiously implement the instructions of the general manager, conscientiously implement the post responsibility system, supervise subordinate employees to strictly implement operating procedures and employee codes, formulate work standards, supervise the quality of subordinates' work and improve work efficiency.

2. According to the overall requirements of the company and the annual budget target of the department, carry out target management and cost control to ensure the reasonable and economical operation of equipment and facilities. Make an energy management plan and do a good job of increasing revenue and reducing expenditure.

3. Be responsible for formulating various management systems, operating procedures and emergency plans of various systems of this department and conducting drills.

4, responsible for the preparation of equipment and facilities monthly and annual maintenance plan and organize the implementation as planned.

5. Be responsible for communication and coordination with relevant departments and contract review of related businesses of this department.

6. According to the technical status and ability of subordinate employees, formulate training plans and organize training and assessment; Pay attention to the professional ethics education of employees, and improve their awareness of property service and service skills.

7. Do a good job in the management of technical files, and classify and file technical data and documents for easy reference.

8. Be responsible for the early intervention of property projects, handover and acceptance of equipment and facilities, and data collection and verification.

9. Responsible for the examination and approval of the operator's secondary decoration scheme and the supervision, management and acceptance of the decoration project.

10, responsible for engineering renovation, equipment renewal, scheme and budget preparation within the jurisdiction area and submitted to the property general manager for review.

1 1. Cooperate with relevant departments to submit and record the owner's housing facilities and equipment according to the occupancy process.

12. Participate in the supervision and construction quality acceptance of major reconstruction projects, and track the rectification of construction defects.

13, responsible for supervising and evaluating the management and construction quality of outsourcing units and putting forward rectification opinions.

14, responsible for the management of maintenance construction orders, making departmental maintenance material procurement plans, and submitting them to superior leaders for review on a regular basis; Record the replacement of spare parts, analyze and report monthly.

15, responsible for organizing and managing the whole use process of equipment from use, maintenance, innovation and transformation to scrapping, so that the equipment is always in a good technical state.

The project manager's job responsibilities are 8 1, and he is responsible for making the overhaul and maintenance plan of the team equipment and reporting directly to the project manager;

2, responsible for the inspection and evaluation of staff maintenance quality and equipment operation;

3. Before coming off work, patrol the safety and fire control of the equipment in charge, and make work records;

4. Check the use and storage of various spare parts and tools of ZDS BZX _ 6-4 team;

5. Be responsible for the training and technical assessment of employees in this system.

Responsibilities of the project manager 9 1. Participate in demand analysis, cost budget and business negotiation of decoration projects, assist in determining business terms such as project implementation and delivery, and coordinate internal resources;

2, according to the project plan, organize supervision, construction units and engineering personnel to review the construction drawing, and put forward relevant opinions;

3. Organize on-site construction management, implement the quality plan, schedule control and cost control of the project, and ensure the smooth progress of the project construction;

4. Grasp the progress of the project, communicate and negotiate with relevant parties of Party A in technical and commercial aspects, report to the management of the company in time, and coordinate and solve it in time;

5. Handle objections and complaints in construction in time to continuously improve service satisfaction;

6. Supervise and manage the construction site and conduct daily safety disclosure;

7. Establish, collect, sort out, summarize and hand over the construction project files, and coordinate the construction progress contract payment with finance.

Responsibilities of engineering manager 10 1. Accept the leadership of the general manager and manage the employees of the whole engineering department.

2. Formulate the organizational structure and management operation mode of this department, so that it can operate quickly and reasonably, and effectively ensure the safe and economic operation of hotel facilities and the integrity of buildings and decorations.

3. Summarize the operation and maintenance, formulate and review preventive maintenance plans and renovation plans, and supervise the implementation of equipment, facilities and building decoration, so as to ensure that the hotel facilities are constantly improved and always in a normal and intact state.

4. Formulate and assess employee training plans, regularly train employees in business skills, service awareness and basic quality, and strive to build the Engineering Department into a team with high standards, high efficiency and high service quality.

5. Be fully responsible for the cost-saving operation and tracking of the engineering department, and control the consumption of all water, electricity and oil. And strictly control the maintenance costs to ensure the maximum energy saving and consumption reduction of the hotel.

6, according to the business situation and climate and market energy prices, put forward energy-saving operation plan and operation and maintenance cost budget.

7. Be responsible for coordinating the relationship with the municipal engineering and other business departments related to the hotel, so as to obtain a good external environment.

8. Preside over departmental work meetings and coordinate team work.

9, analysis of engineering project quotation, major projects should organize personnel to discuss on-site inspection of construction quality and progress, to evaluate and accept the completed project organization personnel.

10, cooperate with the administrative security department to do a good job in fire control and safety.

1 1, directly and indirectly evaluate supervisors and employees, and guide and evaluate their work.

12. Establish complete equipment and facilities, technical files and maintenance files.

13. Accept and organize the completion of work instructions issued by superiors at any time.

Expansion: How to effectively manage the hotel engineering department?

1 equipment management

There are many kinds of hotel equipment, so it is necessary to do a good job in daily equipment management. Equipment management includes: equipment inventory, equipment cleaning and equipment testing. Make an inventory of fixed assets once every six months, check and register the equipment regularly, and maintain it in time when problems are found. For some spare equipment, such as generators, air conditioning hosts, etc. It is necessary to start testing every half month to ensure good performance.

2 technical management

Technical management mainly includes: maintenance technology of engineering maintenance personnel. With the increase of service life, the breakdown of hotel equipment will become more and more frequent, and the engineering department should adopt different technical maintenance according to different problems during maintenance; For some newly purchased equipment, we should constantly learn and improve the maintenance technology. Maintenance lies not only in performance guarantee, but also in technical improvement in aesthetics.

3 Maintenance management

Elevator, generator, air-conditioning mainframe, high and low voltage power distribution and other large hotel equipment, in addition to fault maintenance, but also to strengthen daily maintenance, sign maintenance contracts with professional maintenance companies, according to the use of equipment, make maintenance plans. When carrying out maintenance work, the engineering department shall arrange special personnel to follow the whole process and keep maintenance records. The implementation of maintenance management will prolong the service life of equipment.

4 Maintenance management

Maintenance is: the social professional company is responsible, and the daily maintenance of the hotel is an important work of the engineering department. The engineering department should formulate relevant systems: engineering repair reporting system, engineering material acquisition system, engineering maintenance specification, etc. , so as to standardize the engineering maintenance process, improve the quality and effect of maintenance, and minimize the material cost. Guests should also pay attention to manners and the cleanliness of the maintenance site when they are in the room for maintenance, which are all aspects to show the quality of hotel employees to the guests.

5 energy consumption management

Energy consumption management is an important way to improve the economic benefits of hotels. The engineering department is responsible for the management of all energy sources such as water, electricity, steam and oil in the hotel. Skill consumption reduction management includes technical energy saving, management energy saving and system energy saving.

1, technical energy saving: adopt new energy-saving materials, install LED lights in public areas, change oil into steam, and replace oil-fired boilers with steam with lower unit price.

2. Energy-saving management: strengthen the management of equipment use, make it in the best state, avoid running with diseases, increase energy consumption, and formulate relevant management systems.

3. System energy saving: Energy saving is not only the work of the engineering department, but all departments should attach great importance to energy saving and consumption reduction. The hotel set up an energy-saving committee to stipulate the specific operation of energy saving in the system.

6 data management

Management is: the engineering department starts with basic work such as measurement and statistical analysis, independently installs meters for each business place, counts energy consumption, and does a good job in data collection and management. Strengthening the accumulation and analysis of energy and material consumption data, accounting with room opening rate, operating income and per capita energy and material consumption, can also achieve the purpose of saving energy and reducing consumption.

7 safety management

Safety management includes: equipment management safety, employee maintenance operation safety and fire safety management.

1. Safety of equipment management: There are many electrical equipment in the engineering department, especially in the high and low voltage distribution room. It is necessary to clean the equipment to prevent small animals from entering the power room, install air conditioners to avoid excessive temperature in the power room, and be waterproof.

2. Maintenance and operation safety of employees: electricians should be certified for maintenance, and safety precautions should be taken for aerial work. Employees' awareness of safe operation should be improved through training, and maintenance should be carried out in strict accordance with regulations.

3. Fire safety management: comply with fire laws and regulations, put fire extinguishers in the machine room and other places, report to the safety department when there is an open flame during maintenance, and prohibit smoking in the maintenance factory. And strengthen the management of daily fire safety inspection.

8 health management

Hotel living pool is generally managed by the engineering department, and the pool door is closed. The engineering department conducts inspections every day and has inspection records. According to the regulations of the health department, the swimming pool should be cleaned once every six months to ensure the safety and hygiene of the swimming pool.

9 Transformation management

In order to keep the hotel facilities and equipment in good condition, there will be some improvements every year, which can be completed by the engineering department or constructed by a professional decoration company. Either way, the engineering department must participate in the design scheme, project cost, material selection and construction management.

10 training management

The training of engineering department mainly includes: maintenance skills training, service etiquette training, energy saving and consumption reduction training, etc. In the daily maintenance work, we should constantly improve our skills through training and establish the service consciousness of "second-line service and first-line service".

The hotel concentrates on the latest equipment provided by modern science and technology, and becomes an important guarantee and necessity for luxury, style, comfort, quality service, environmental protection and energy saving. The task of the engineering department is to absolutely ensure the normal and benign operation of these facilities and equipment, so that guests can try their best to control energy consumption and cost on the basis of enjoying the feeling of comfort, warmth, intimacy, convenience, safety and home, and realize a win-win situation for the hotel's economic and social benefits.

Responsibilities of project manager: 1 1 1. Be responsible for formulating and improving various rules and regulations and workflow of the engineering department.

2. Be responsible for the transformation of feed factory and the construction of new factory.

3. Be responsible for the construction application: preliminary scheme application, planning permission, construction permission, supervision, filing by the construction unit, fire control audit, construction drawing audit, etc. And the later stage also includes fire control acceptance, completion acceptance and secondary installation acceptance.

4. Be responsible for the scheme, capacity expansion and construction drawing design of each major of the project, and control the professional and technical work.

5. Be responsible for the formulation of technical and quality standards of the project.

6. Complete the calculation of budgetary estimate, budget, settlement and final payment, and review the tender, contract payment and change contact list.

7. Be responsible for countersigning engineering and design contracts (technical and settlement terms).

8. Be responsible for the bidding of equipment supplied by Party A, and organize the preparation of all kinds of bidding documents.

9, responsible for the bidding work of engineering construction units;

10. Participate in the project review of the construction organization design, schedule, general layout and construction scheme of the construction unit.

1 1, responsible for project progress, project quality control and construction safety management.

12, responsible for project acceptance.

Responsibilities of project manager: 12 1. Be responsible for the overall management of the project site and feedback the progress and difficulties to the company in time;

2. Review the construction organization design, supervise the implementation of the schedule, control the construction progress and complete the construction period;

3. Responsible for managing the construction team and coordinating internal and external relations;

4. According to the actual situation of each project construction of the enterprise, prepare and implement the completed project plan;

5. Cooperate with the cost department to control the budget estimate, budget and project cost from the planning scheme to the construction drawings;

6. Participate in the technical disclosure of construction drawings before commencement, and participate in the work of the blue prints.the design;

7. Strengthen project quality control, and be responsible for the whole process from project construction management to completion acceptance;

8. Do a good job in management of materials, equipment and personnel;

Responsibilities of project manager: 13 1. According to the development strategy and annual work target of the group company, be responsible for formulating and implementing various management systems and processes of the department, and decomposing, checking and finally completing them;

2. Responsible for the production schedule management, project quality management, safety production management, civilized construction management, market management and completion management of the whole company's projects;

3. Responsible for the daily management and assessment of this department;

4. Responsible for the training, assessment and selection of engineering line talents;

5. Be responsible for internal and external communication and liaison related to project management and excellent engineering.

Responsibilities of project manager: 14 1. Assist the general manager of the company to participate in daily business decisions and business meetings, supervise and implement the relevant requirements and systems of the board of directors and the group on engineering management, be responsible to the general manager of the company for daily affairs, and report to the general manager, the board of directors and the group in case of major problems.

2. Preside over all the work related to the project, put forward plans or suggestions on the organizational structure involved in the work in charge, and put forward their own opinions and suggestions on the appointment of the personnel in charge.

3. According to the company's management objectives and tasks, coordinate the work arrangements of the competent departments, formulate work plans, organize technical forces to solve engineering and technical problems, establish technical management systems, and make decision-making suggestions to the company leaders or the board of directors on major technical matters.

4. Implement the rules and regulations on engineering construction promulgated by the board of directors, and organize the formulation of various management systems of the competent department.

5. According to the company's overall goal plan, decompose the stage tasks of the departments in charge, and supervise the implementation of the assessment.

6. Be responsible for the professional ethics education and safety education of employees in this department, cultivate a dedicated and skilled workforce, ensure that employees have a good working atmosphere, solve problems for employees in time, ensure the stability of the workforce, and improve the cost awareness and management efficiency of employees.

7. According to the technical force allocation and technical management of the department and the company, select and equip the technical personnel of the company, cultivate and consolidate the technical backbone team, and effectively ensure the safe operation of power equipment and the normal use of facilities in all aspects of the house. Try your best to ensure the quality of the project and control the company's investment and expenses at the lowest cost.

8. Responsible for completing other tasks temporarily assigned by various departments and general manager of the group, and assisting other vice presidents in charge of the company to complete other business work of the company.

Job responsibilities of the project manager 15 1. Under the leadership of the general manager, he will be fully responsible for all the work of the engineering department.

2, responsible for the organization of construction equipment maintenance, maintenance, operation and management.

3, responsible for the engineering department management system and equipment operation procedures.

4, responsible for the training plan, regular business training for employees in this department.

5. Be responsible for supervising, inspecting and guiding the work of employees in this department, and regularly assess each position in this department.

6. Negotiate, evaluate and supervise the outsourcing project of the project, and organize the quality acceptance of the outsourcing project.

7. Responsible for auditing the interior decoration of users.

;