2. roof and daughter wall, gutter, gutter, protruding roof structure of the connection with 1:2.5 cement mortar to make arc, arc radius of 80 ~ 100 mm, in the outstretched roof around the pipeline to make the steamed buns; drop mouth, pipeline out of the roof parts and other waterproofing key parts, in the spraying 2 days before the pre-painting polyurethane waterproofing coatings for two degrees for detail treatment. Roof insulation should be articulated with the external wall insulation layer to prevent thermal bridging.
3. The incoming raw materials must be checked and accepted through the inspection, ready for the required raw materials to ensure that continuous construction. By the manufacturer according to the design of the density, strength and other performance requirements, to determine the group A, group B, foaming agent, curing agent, homogenizer, flame retardant ratio, additives first added to group A, and should be mixed evenly.
4. Check and debug the spraying equipment, metering pump, pneumatic pressure. Formal spraying before the same grass-roots level, using the same process for sample construction, and after the test is qualified, before allowing the construction of large areas.
5. Understand the weather conditions and the construction environment, choose a sunny weather time period construction, to ensure that the foam body normal solidification; around the good enclosure facilities, to prevent the foam flying.